Aveley Landfill Site Sandy Lane Aveley RM15 4XP Map

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) N/A
  • De-Rated Capacity (CMU Registry) 4.04
  • Connection Capacity (CMU Registry) 4.26 MW
  • Anticipated Capacity (CMU Registry) 4.04 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name INFINIS ALTERNATIVE ENERGIES LIMITED
  • Parent Company (CMU Registry) Infinis Energy Management Limited
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +4401604662400

Basic Information

Basic Information
  • Location Aveley Landfill Site Sandy Lane Aveley RM15 4XP
  • Description 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
  • Company INFINIS ALTERNATIVE ENERGIES LIMITED

Technical Details

Technical Details
  • Technology OCGT and Reciprocating Engines (Fuel Type - Gas)
  • Generation Type N/A
  • Connection Type N/A
  • De-Rated Capacity N/A
  • Connection / DSR Capacity N/A
  • Type T-4

Auction Information

Auction Information
  • Auction 2021-22 (T-4) Four Year Ahead Capacity Auction
  • Delivery Year 2,021
  • Status N/A
  • Clearing Price N/A

Additional Information

Additional Information
  • CMU ID AVELE2
  • Location and Post Code Aveley Landfill Site Sandy Lane Aveley RM15 4XP
  • Description of CMU Components 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
  • Generating Technology Class OCGT and Reciprocating Engines (Fuel Type - Gas)
  • Company Name INFINIS ALTERNATIVE ENERGIES LIMITED
  • Auction Name 2021-22 (T-4) Four Year Ahead Capacity Auction
  • _id 220,166
  • rank 0.07
  • Component ID AVELE2
  • OS Grid Reference TQ 550 807
  • Primary Fuel of Component N/A
  • Permitted on-Site Generating Unit N/A
  • Pre-Refurbishing De-Rated Capacity N/A
  • Post-Refurbishing De-Rated Capacity N/A
  • Generating Capacity of on-site Generating Unit N/A

CMU Registry Data

CMU Registry Data
  • Auction Capacity Auction
  • Type T-4
  • Delivery Year 2,021
  • Name of Applicant INFINIS ALTERNATIVE ENERGIES LIMITED
  • CM Unit Name AVELE2

Field Value
_id 220166
Type T-4
rank 0.0706241
CMU ID AVELE2
Auction Name 2021-22 (T-4) Four Year Ahead Capacity Auction
Component ID AVELE2
Delivery Year 2021
De-Rated Capacity
null
OS Grid Reference TQ 550 807
Location and Post Code Aveley Landfill Site Sandy Lane Aveley RM15 4XP
Connection / DSR Capacity
null
Primary Fuel of Component
null
Generating Technology Class OCGT and Reciprocating Engines (Fuel Type - Gas)
Description of CMU Components 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity
null
Post-Refurbishing De-Rated Capacity
null
Generating Capacity of on-site Generating Unit
null

Field Value
_id 5192
Type T-4
CMU ID AVELE2
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2021-22 (T-4) Four Year Ahead Capacity Auction
CM Unit Name AVELE2
CM Unit Type Non CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2021
Opt Out Status Opt-In
Opt-Out Reason
null
Parent Company Infinis Energy Management Limited
DSR Test Method
null
Is FCM required
null
CM Unit Category New Build Generating CMU
Storage Facility No
De-Rated Capacity 4.035
Name of Applicant INFINIS ALTERNATIVE ENERGIES LIMITED
Primary Fuel Type Gas
Registered Holder INFINIS ALTERNATIVE ENERGIES LIMITED
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover (empty)
Termination Fee 1 Rate £5000.00 /MW
Termination Fee 2 Rate £25000.00 /MW
Termination Fee 3 Rate £10000.00 /MW
Termination Fee 4 Rate £15000.00 /MW
Termination Fee 5 Rate £35000.00 /MW
Connection / DSR Capacity 4.256
Maximum Obligation Period 15
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary
null
Pre-Refurbishing CMU Status
null
Transmission / Distribution Distribution
Unique Agreement Identifier CAN-2021-AVELE2-001
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity 4.035
Term of the Capacity Agreement 14
Nature of the Security Interest
null
CMU confirmed entry into Auction Yes
Is Connection Agreement required
null
Pre-Refurbishment Bidding Status
null
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity
null
Date of Issue of Capacity Agreement 2018-03-20
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity
null
Auction Acquired Capacity Obligation 3.812
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone '+4401604662400
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded 14
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid 2021/2022, 2022/2023, 2023/2024, 2024/2025, 2025/2026, 2026/2027, 2027/2028, 2028/2029, 2029/2030, 2030/2031, 2031/2032, 2032/2033, 2033/2034, 2034/2035
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
null
Anticipated Pre-Refurbishing De-Rated Capacity
null
Anticipated Post-Refurbishing De-Rated Capacity
null
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round 14
Long-Stop Date for the Minimum Completion Requirement
null