Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR Map

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) N/A
  • De-Rated Capacity (CMU Registry) 4.94
  • Connection Capacity (CMU Registry) 5.49 MW
  • Anticipated Capacity (CMU Registry) 4.98 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name THE ISLE OF WIGHT ENERGY COMPANY LIMITED
  • Parent Company (CMU Registry) P3P ASSET HOLDINGS LIMITED
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +4402036676200

Basic Information

Basic Information
  • Location Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR
  • Description The CMU component JENBA2 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
  • Company THE ISLE OF WIGHT ENERGY COMPANY LIMITED

Technical Details

Technical Details
  • Technology CHP and autogeneration
  • Generation Type N/A
  • Connection Type N/A
  • De-Rated Capacity N/A
  • Connection / DSR Capacity N/A
  • Type T-4

Auction Information

Auction Information
  • Auction 2021-22 (T-4) Four Year Ahead Capacity Auction
  • Delivery Year 2,021
  • Status N/A
  • Clearing Price N/A

Additional Information

Additional Information
  • CMU ID MAIN17
  • Location and Post Code Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR
  • Description of CMU Components The CMU component JENBA2 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
  • Generating Technology Class CHP and autogeneration
  • Company Name THE ISLE OF WIGHT ENERGY COMPANY LIMITED
  • Auction Name 2021-22 (T-4) Four Year Ahead Capacity Auction
  • _id 282,290
  • rank 0.06
  • Component ID JENBA2
  • OS Grid Reference SZ 551 844
  • Primary Fuel of Component N/A
  • Permitted on-Site Generating Unit N/A
  • Pre-Refurbishing De-Rated Capacity N/A
  • Post-Refurbishing De-Rated Capacity N/A
  • Generating Capacity of on-site Generating Unit N/A

CMU Registry Data

CMU Registry Data
  • Auction Capacity Auction
  • Type T-4
  • Delivery Year 2,021
  • Name of Applicant THE ISLE OF WIGHT ENERGY COMPANY LIMITED
  • CM Unit Name Main Site Energy Centre

Field Value
_id 282290
Type T-4
rank 0.0573088
CMU ID MAIN17
Auction Name 2021-22 (T-4) Four Year Ahead Capacity Auction
Component ID JENBA2
Delivery Year 2021
De-Rated Capacity
null
OS Grid Reference SZ 551 844
Location and Post Code Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR
Connection / DSR Capacity
null
Primary Fuel of Component
null
Generating Technology Class CHP and autogeneration
Description of CMU Components The CMU component JENBA2 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity
null
Post-Refurbishing De-Rated Capacity
null
Generating Capacity of on-site Generating Unit
null

Field Value
_id 5865
Type T-4
CMU ID MAIN17
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2021-22 (T-4) Four Year Ahead Capacity Auction
CM Unit Name Main Site Energy Centre
CM Unit Type Non CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2021
Opt Out Status Opt-In
Opt-Out Reason
null
Parent Company P3P ASSET HOLDINGS LIMITED
DSR Test Method
null
Is FCM required
null
CM Unit Category Existing Generating CMU
Storage Facility No
De-Rated Capacity 4.939
Name of Applicant THE ISLE OF WIGHT ENERGY COMPANY LIMITED
Primary Fuel Type Gas
Registered Holder THE ISLE OF WIGHT ENERGY COMPANY LIMITED
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover (empty)
Termination Fee 1 Rate £5000.00 /MW
Termination Fee 2 Rate £25000.00 /MW
Termination Fee 3 Rate £10000.00 /MW
Termination Fee 4 Rate £15000.00 /MW
Termination Fee 5 Rate £35000.00 /MW
Connection / DSR Capacity 5.488
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary
null
Pre-Refurbishing CMU Status
null
Transmission / Distribution Distribution
Unique Agreement Identifier CAN-2021-MAIN17-001
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity 4.982
Term of the Capacity Agreement 1
Nature of the Security Interest
null
CMU confirmed entry into Auction Yes
Is Connection Agreement required
null
Pre-Refurbishment Bidding Status
null
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity
null
Date of Issue of Capacity Agreement 2018-03-20
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity
null
Auction Acquired Capacity Obligation 4.939
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone '+4402036676200
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid 2021/2022
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
null
Anticipated Pre-Refurbishing De-Rated Capacity
null
Anticipated Post-Refurbishing De-Rated Capacity
null
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement
null