Millerhill Recycling & Energy Recovery Centre Whitehill Road DALKEITH EH22 1SX Map

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) 13.21 MW
  • De-Rated Capacity (CMU Registry) 13.14
  • Connection Capacity (CMU Registry) 15 MW
  • Anticipated Capacity (CMU Registry) 13.14 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name FCC (E&M) LIMITED
  • Parent Company (CMU Registry) FCC (E+M) Holdings Limited
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +4401302303030

Basic Information

Basic Information
  • Location Millerhill Recycling & Energy Recovery Centre Whitehill Road DALKEITH EH22 1SX
  • Description New CMU ID due to updated Grid Connection Agreement FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
  • Company FCC (E&M) LIMITED

Technical Details

Technical Details
  • Technology Energy from Waste
  • Generation Type N/A
  • Connection Type N/A
  • De-Rated Capacity 13.21
  • Connection / DSR Capacity 15
  • Type T-4

Auction Information

Auction Information
  • Auction 2028-29 (T-4) Four Year Ahead Capacity Auction
  • Delivery Year 2,028
  • Status N/A
  • Clearing Price N/A

Additional Information

Additional Information
  • CMU ID MILL01
  • Location and Post Code Millerhill Recycling & Energy Recovery Centre Whitehill Road DALKEITH EH22 1SX
  • Description of CMU Components New CMU ID due to updated Grid Connection Agreement FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
  • Generating Technology Class Energy from Waste
  • Company Name FCC (E&M) LIMITED
  • Auction Name 2028-29 (T-4) Four Year Ahead Capacity Auction
  • _id 410,656
  • rank 0.06
  • Component ID MILL01
  • OS Grid Reference NT 321 710
  • Primary Fuel of Component Waste
  • Permitted on-Site Generating Unit N/A
  • Pre-Refurbishing De-Rated Capacity N/A
  • Post-Refurbishing De-Rated Capacity N/A
  • Generating Capacity of on-site Generating Unit N/A

CMU Registry Data

CMU Registry Data
  • Auction Capacity Auction
  • Type T-4
  • Delivery Year 2,021
  • Name of Applicant FCC (E&M) LIMITED
  • CM Unit Name Millerhill EfW

Field Value
_id 410656
Type T-4
rank 0.0573088
CMU ID FCCMI3
Auction Name 2028-29 (T-4) Four Year Ahead Capacity Auction
Component ID MILL01
Delivery Year 2028
De-Rated Capacity 13.205
OS Grid Reference NT 321 710
Location and Post Code Millerhill Recycling & Energy Recovery Centre Whitehill Road DALKEITH EH22 1SX
Connection / DSR Capacity 15
Primary Fuel of Component Waste
Generating Technology Class Energy from Waste
Description of CMU Components New CMU ID due to updated Grid Connection Agreement FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity
null
Post-Refurbishing De-Rated Capacity
null
Generating Capacity of on-site Generating Unit
null

Field Value
_id 5880
Type T-4
CMU ID MILL01
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2021-22 (T-4) Four Year Ahead Capacity Auction
CM Unit Name Millerhill EfW
CM Unit Type Non CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2021
Opt Out Status Opt-In
Opt-Out Reason
null
Parent Company FCC (E+M) Holdings Limited
DSR Test Method
null
Is FCM required
null
CM Unit Category New Build Generating CMU
Storage Facility No
De-Rated Capacity 13.137
Name of Applicant FCC (E&M) LIMITED
Primary Fuel Type Waste
Registered Holder FCC (E&M) LIMITED
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover (empty)
Termination Fee 1 Rate £5000.00 /MW
Termination Fee 2 Rate £25000.00 /MW
Termination Fee 3 Rate £10000.00 /MW
Termination Fee 4 Rate £15000.00 /MW
Termination Fee 5 Rate £35000.00 /MW
Connection / DSR Capacity 15
Maximum Obligation Period 15
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary
null
Pre-Refurbishing CMU Status
null
Transmission / Distribution Distribution
Unique Agreement Identifier CAN-2021-MILL01-001
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity 13.137
Term of the Capacity Agreement 1
Nature of the Security Interest
null
CMU confirmed entry into Auction Yes
Is Connection Agreement required
null
Pre-Refurbishment Bidding Status
null
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity
null
Date of Issue of Capacity Agreement 2018-03-20
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity
null
Auction Acquired Capacity Obligation 13.137
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone '+4401302303030
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid 2021/2022
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
null
Anticipated Pre-Refurbishing De-Rated Capacity
null
Anticipated Post-Refurbishing De-Rated Capacity
null
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement
null