Liberty Lochaber Smelter, Fort William, Scotland PH33 6TH Map

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) N/A
  • De-Rated Capacity (CMU Registry) 15.57
  • Connection Capacity (CMU Registry) 17.11 MW
  • Anticipated Capacity (CMU Registry) 15.57 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name Reactive Technologies UK Limited
  • Parent Company (CMU Registry) Reactive Technologies Limited
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +442031424798

Basic Information

Basic Information
  • Location Liberty Lochaber Smelter, Fort William, Scotland PH33 6TH
  • Description Hydro power turbine generator Unit 2 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
  • Company Reactive Technologies UK Limited

Technical Details

Technical Details
  • Technology Hydro
  • Generation Type N/A
  • Connection Type N/A
  • De-Rated Capacity N/A
  • Connection / DSR Capacity N/A
  • Type ST

Auction Information

Auction Information
  • Auction 2021-22 (T-4) Four Year Ahead Capacity Auction
  • Delivery Year 2,021
  • Status N/A
  • Clearing Price N/A

Additional Information

Additional Information
  • CMU ID RTSL12
  • Location and Post Code Liberty Lochaber Smelter, Fort William, Scotland PH33 6TH
  • Description of CMU Components Hydro power turbine generator Unit 2 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
  • Generating Technology Class Hydro
  • Company Name Reactive Technologies UK Limited
  • Auction Name 2021-22 (T-4) Four Year Ahead Capacity Auction
  • _id 268,491
  • rank 0.06
  • Component ID LUNIT2
  • OS Grid Reference NN 127 751
  • Primary Fuel of Component N/A
  • Permitted on-Site Generating Unit N/A
  • Pre-Refurbishing De-Rated Capacity N/A
  • Post-Refurbishing De-Rated Capacity N/A
  • Generating Capacity of on-site Generating Unit N/A

CMU Registry Data

CMU Registry Data
  • Auction Capacity Auction
  • Type ST
  • Delivery Year 2,021
  • Name of Applicant Reactive Technologies UK Limited
  • CM Unit Name RTSLH2 - Lochaber Hydro Unit 2

Field Value
_id 268491
Type ST
rank 0.0573088
CMU ID RTSL12
Auction Name 2021-22 (T-4) Four Year Ahead Capacity Auction
Component ID LUNIT2
Delivery Year 2021
De-Rated Capacity
null
OS Grid Reference NN 127 751
Location and Post Code Liberty Lochaber Smelter, Fort William, Scotland PH33 6TH
Connection / DSR Capacity
null
Primary Fuel of Component
null
Generating Technology Class Hydro
Description of CMU Components Hydro power turbine generator Unit 2 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity
null
Post-Refurbishing De-Rated Capacity
null
Generating Capacity of on-site Generating Unit
null

Field Value
_id 6069
Type ST
CMU ID RTSL12
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2021-22 (T-4) Four Year Ahead Capacity Auction
CM Unit Name RTSLH2 - Lochaber Hydro Unit 2
CM Unit Type Non CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2021
Opt Out Status Opt-In
Opt-Out Reason
null
Parent Company Reactive Technologies Limited
DSR Test Method
null
Is FCM required
null
CM Unit Category Existing Generating CMU
Storage Facility No
De-Rated Capacity 15.569
Name of Applicant Reactive Technologies UK Limited
Primary Fuel Type Hydro
Registered Holder Reactive Technologies UK Limited
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover (empty)
Termination Fee 1 Rate £5000.00 /MW
Termination Fee 2 Rate £25000.00 /MW
Termination Fee 3 Rate £10000.00 /MW
Termination Fee 4 Rate £15000.00 /MW
Termination Fee 5 Rate £35000.00 /MW
Connection / DSR Capacity 17.111
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary 01/10/2021 - 30/09/2022:15.569 MW
Pre-Refurbishing CMU Status
null
Transmission / Distribution Distribution
Unique Agreement Identifier CAN-2021-RTSL12-001
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity 15.569
Term of the Capacity Agreement 1
Nature of the Security Interest
null
CMU confirmed entry into Auction
null
Is Connection Agreement required
null
Pre-Refurbishment Bidding Status
null
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity
null
Date of Issue of Capacity Agreement 2021-06-28
List of Traded Capacity Obligations T1: 14.156 MW; T2: 1.413 MW
Post-Refurbishing De-Rated Capacity
null
Auction Acquired Capacity Obligation (empty)
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies T1: 01/10/2021 - 30/09/2022; T2: 01/10/2021 - 30/09/2022
Secondary Trading Contact - Telephone '+442031424798
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid 2021/2022
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
null
Anticipated Pre-Refurbishing De-Rated Capacity
null
Anticipated Post-Refurbishing De-Rated Capacity
null
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round
null
Long-Stop Date for the Minimum Completion Requirement
null