Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.
Field | Value |
---|---|
_id | 185106 |
Type | T-4 |
rank | 0.0706241 |
CMU ID | TRAF20 |
Auction Name | 2021-22 (T-4) Four Year Ahead Capacity Auction |
Component ID | TRAF20 |
Delivery Year | 2021 |
De-Rated Capacity |
null |
OS Grid Reference | SJ 801 968 |
Location and Post Code | Elevator Road, Stretford, Manchester, M17 1BR |
Connection / DSR Capacity |
null |
Primary Fuel of Component |
null |
Generating Technology Class | OCGT and Reciprocating Engines (Fuel Type - Gas) |
Description of CMU Components | The proposed power plant would consist of several new generating units and ancillary equipment. Each generating set will be secured within spate acoustically protected enclosures with low visual impact. The generator units are accompanied on site by generator transformers, switchgear units and a site transformer to allow connection to the distribution network at the connection voltage, fuel reception equipment, and a site welfare facility and office. |
Permitted on-Site Generating Unit |
null |
Pre-Refurbishing De-Rated Capacity |
null |
Post-Refurbishing De-Rated Capacity |
null |
Generating Capacity of on-site Generating Unit |
null |
Field | Value |
---|---|
_id | 6292 |
Type | T-4 |
CMU ID | TRAF20 |
Auction | Capacity Auction |
Agent Name |
null |
Beta Value |
null |
Auction Name | 2021-22 (T-4) Four Year Ahead Capacity Auction |
CM Unit Name | Trafford |
CM Unit Type | Non CMRS |
TEC Deferral |
null |
Unproven DSR |
null |
Delivery Year | 2021 |
Opt Out Status | Opt-In |
Opt-Out Reason |
null |
Parent Company | Island Green Power |
DSR Test Method |
null |
Is FCM required |
null |
CM Unit Category | New Build Generating CMU |
Storage Facility | No |
De-Rated Capacity | 18.772 |
Name of Applicant | IGP Number 7 Limited |
Primary Fuel Type | Gas |
Registered Holder |
null |
Annual Penalty Cap |
null |
Monthly Penalty Cap |
null |
Proven DSR Capacity |
null |
DSR Bidding Capacity |
null |
Amount of Credit Cover | (empty) |
Termination Fee 1 Rate |
null |
Termination Fee 2 Rate |
null |
Termination Fee 3 Rate |
null |
Termination Fee 4 Rate |
null |
Termination Fee 5 Rate |
null |
Connection / DSR Capacity | 19.8 |
Maximum Obligation Period | 15 |
Capacity Agreement Awarded |
null |
Pre-Qualification Decision | Not Prequalified |
Capacity obligation Summary |
null |
Pre-Refurbishing CMU Status |
null |
Transmission / Distribution | Distribution |
Unique Agreement Identifier |
null |
New Build Yet to Satisfy FCM |
null |
Planning Consents Conditions |
null |
Anticipated De-Rated Capacity | 18.962 |
Term of the Capacity Agreement |
null |
Nature of the Security Interest |
null |
CMU confirmed entry into Auction |
null |
Is Connection Agreement required |
null |
Pre-Refurbishment Bidding Status |
null |
Secondary Trading Contact - Email | [email protected] |
Date for provision of deferred TEC |
null |
Pre-Refurbishing De-Rated Capacity |
null |
Date of Issue of Capacity Agreement |
null |
List of Traded Capacity Obligations |
null |
Post-Refurbishing De-Rated Capacity |
null |
Auction Acquired Capacity Obligation |
null |
Date of Issue of DSR Test Certificate |
null |
Has Capacity Agreement been Suspended |
null |
Period for which the transfer applies |
null |
Secondary Trading Contact - Telephone | '+442037526691 |
Capacity Agreement has been Terminated |
null |
Duration of Capacity Agreement Awarded |
null |
Date for Financial Commitment Milestone |
null |
Delivery Years for which Agreement Valid |
null |
Connection Agreement Deferral Declaration |
null |
Date of Termination of Capacity Agreement |
null |
Latest Date SCM is expected to be achieved |
null |
Subject to Substantial Completion Milestone |
null |
Subject to a Minimum Completion Requirement |
null |
Earliest Date SCM is expected to be achieved |
null |
Is copy of Grid Connection Agreement required |
null |
Anticipated Pre-Refurbishing De-Rated Capacity |
null |
Anticipated Post-Refurbishing De-Rated Capacity |
null |
Legal Name of any Person with a Security Interest |
null |
Date for provision of deferred Connection Agreement |
null |
Duration of Capacity Agreement in First Bidding Round |
null |
Long-Stop Date for the Minimum Completion Requirement |
null |