Plot C Land at Severn Road Avonmouth BS10 7SE Map

General Information

Key Details
  • Description The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. The connection is to be provided at 33KV by installing an underground cable with a metering circuit breaker located at the customer's site.
  • Auction 2023-24 (T-4) Four Year Ahead Capacity Auction
  • Delivery Year 2023
Geocoding Status: Yes

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) N/A
  • De-Rated Capacity (CMU Registry) 1,377
  • Connection Capacity (CMU Registry) 1,530 MW
  • Anticipated Capacity (CMU Registry) 1,377 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name Willington Power Limited
  • Parent Company (CMU Registry) Calon Energy Limited
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +441633530165

Field Value
_id 140610
Type T-4
rank 0.0573088
CMU ID EL0018
Auction Name 2023-24 (T-4) Four Year Ahead Capacity Auction
Component ID EL0018
Delivery Year 2023
De-Rated Capacity (empty)
OS Grid Reference ST 543 811
Location and Post Code Plot C Land at Severn Road Avonmouth BS10 7SE
Connection / DSR Capacity (empty)
Primary Fuel of Component (empty)
Generating Technology Class Storage (Duration 1h)
Description of CMU Components The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. The connection is to be provided at 33KV by installing an underground cable with a metering circuit breaker located at the customer's site.
Permitted on-Site Generating Unit (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Post-Refurbishing De-Rated Capacity (empty)
Generating Capacity of on-site Generating Unit (empty)

Field Value
_id 6399
Type T-4
CMU ID WILL_C
Auction Capacity Auction
Agent Name (empty)
Beta Value (empty)
Auction Name 2021-22 (T-4) Four Year Ahead Capacity Auction
CM Unit Name WILLINGTON C CCGT
CM Unit Type CMRS
TEC Deferral (empty)
Unproven DSR (empty)
Delivery Year 2021
Opt Out Status Opt-In
Opt-Out Reason (empty)
Parent Company Calon Energy Limited
DSR Test Method (empty)
Is FCM required (empty)
CM Unit Category New Build Generating CMU
Storage Facility No
De-Rated Capacity 1377
Name of Applicant Willington Power Limited
Primary Fuel Type Gas
Registered Holder (empty)
Annual Penalty Cap (empty)
Monthly Penalty Cap (empty)
Proven DSR Capacity (empty)
DSR Bidding Capacity (empty)
Amount of Credit Cover (empty)
Termination Fee 1 Rate (empty)
Termination Fee 2 Rate (empty)
Termination Fee 3 Rate (empty)
Termination Fee 4 Rate (empty)
Termination Fee 5 Rate (empty)
Connection / DSR Capacity 1530
Maximum Obligation Period 15
Capacity Agreement Awarded No
Pre-Qualification Decision Prequalified
Capacity obligation Summary (empty)
Pre-Refurbishing CMU Status (empty)
Transmission / Distribution Transmission
Unique Agreement Identifier (empty)
New Build Yet to Satisfy FCM Yes
Planning Consents Conditions (empty)
Anticipated De-Rated Capacity 1377
Term of the Capacity Agreement (empty)
Nature of the Security Interest (empty)
CMU confirmed entry into Auction Yes
Is Connection Agreement required (empty)
Pre-Refurbishment Bidding Status (empty)
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Date of Issue of Capacity Agreement (empty)
List of Traded Capacity Obligations (empty)
Post-Refurbishing De-Rated Capacity (empty)
Auction Acquired Capacity Obligation (empty)
Date of Issue of DSR Test Certificate (empty)
Has Capacity Agreement been Suspended (empty)
Period for which the transfer applies (empty)
Secondary Trading Contact - Telephone '+441633530165
Capacity Agreement has been Terminated (empty)
Duration of Capacity Agreement Awarded (empty)
Date for Financial Commitment Milestone (empty)
Delivery Years for which Agreement Valid (empty)
Connection Agreement Deferral Declaration (empty)
Date of Termination of Capacity Agreement (empty)
Latest Date SCM is expected to be achieved (empty)
Subject to Substantial Completion Milestone (empty)
Subject to a Minimum Completion Requirement (empty)
Earliest Date SCM is expected to be achieved (empty)
Is copy of Grid Connection Agreement required (empty)
Anticipated Pre-Refurbishing De-Rated Capacity (empty)
Anticipated Post-Refurbishing De-Rated Capacity (empty)
Legal Name of any Person with a Security Interest (empty)
Date for provision of deferred Connection Agreement (empty)
Duration of Capacity Agreement in First Bidding Round 15
Long-Stop Date for the Minimum Completion Requirement (empty)