Land South of NG Capenhurst Substation, Capenhurst Lane, Capenhurst, Cheshire, CH1 6HE Map

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) N/A
  • De-Rated Capacity (CMU Registry) 19.96
  • Connection Capacity (CMU Registry) 100 MW
  • Anticipated Capacity (CMU Registry) 19.96 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name Zenobe Capenhurst Limited
  • Parent Company (CMU Registry) BESS HOLDCO 2 LIMITED
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +442039127853

Basic Information

Basic Information
  • Location Land South of NG Capenhurst Substation, Capenhurst Lane, Capenhurst, Cheshire, CH1 6HE
  • Description 4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs
  • Company Zenobe Capenhurst Limited

Technical Details

Technical Details
  • Technology Storage (Duration 1h)
  • Generation Type N/A
  • Connection Type N/A
  • De-Rated Capacity N/A
  • Connection / DSR Capacity N/A
  • Type T-4

Auction Information

Auction Information
  • Auction 2025-26 (T-4) Four Year Ahead Capacity Auction
  • Delivery Year 2,025
  • Status N/A
  • Clearing Price N/A

Additional Information

Additional Information
  • CMU ID NBPIN1
  • Location and Post Code Land South of NG Capenhurst Substation, Capenhurst Lane, Capenhurst, Cheshire, CH1 6HE
  • Description of CMU Components 4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs
  • Generating Technology Class Storage (Duration 1h)
  • Company Name Zenobe Capenhurst Limited
  • Auction Name 2025-26 (T-4) Four Year Ahead Capacity Auction
  • _id 220,232
  • rank 0.06
  • Component ID PINFB-2
  • OS Grid Reference SJ 371 747
  • Primary Fuel of Component N/A
  • Permitted on-Site Generating Unit N/A
  • Pre-Refurbishing De-Rated Capacity N/A
  • Post-Refurbishing De-Rated Capacity N/A
  • Generating Capacity of on-site Generating Unit N/A

CMU Registry Data

CMU Registry Data
  • Auction Capacity Auction
  • Type T-4
  • Delivery Year 2,025
  • Name of Applicant Zenobe Capenhurst Limited
  • CM Unit Name Capenhurst

Field Value
_id 220232
Type T-4
rank 0.0573088
CMU ID NBPIN1
Auction Name 2025-26 (T-4) Four Year Ahead Capacity Auction
Component ID PINFB-2
Delivery Year 2025
De-Rated Capacity
null
OS Grid Reference SJ 371 747
Location and Post Code Land South of NG Capenhurst Substation, Capenhurst Lane, Capenhurst, Cheshire, CH1 6HE
Connection / DSR Capacity
null
Primary Fuel of Component
null
Generating Technology Class Storage (Duration 1h)
Description of CMU Components 4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity
null
Post-Refurbishing De-Rated Capacity
null
Generating Capacity of on-site Generating Unit
null

Field Value
_id 13014
Type T-4
CMU ID NBPIN1
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2025-26 (T-4) Four Year Ahead Capacity Auction
CM Unit Name Capenhurst
CM Unit Type CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2025
Opt Out Status Opt-In
Opt-Out Reason
null
Parent Company BESS HOLDCO 2 LIMITED
DSR Test Method
null
Is FCM required
null
CM Unit Category New Build Generating CMU
Storage Facility Yes
De-Rated Capacity 19.96
Name of Applicant Zenobe Capenhurst Limited
Primary Fuel Type Storage - Battery
Registered Holder Zenobe Capenhurst Limited
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover (empty)
Termination Fee 1 Rate £5000.00 /MW
Termination Fee 2 Rate £25000.00 /MW
Termination Fee 3 Rate £10000.00 /MW
Termination Fee 4 Rate £15000.00 /MW
Termination Fee 5 Rate £35000.00 /MW
Connection / DSR Capacity 100
Maximum Obligation Period 15
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary
null
Pre-Refurbishing CMU Status
null
Transmission / Distribution Transmission
Unique Agreement Identifier CAN-2025-NBPIN1-001
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity 19.96
Term of the Capacity Agreement 15
Nature of the Security Interest 1.A fixed charge over specified assets of the company and a floating charge over all of the assets and undertaking of the company
CMU confirmed entry into Auction Yes
Is Connection Agreement required
null
Pre-Refurbishment Bidding Status
null
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity
null
Date of Issue of Capacity Agreement 2022-04-01
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity
null
Auction Acquired Capacity Obligation 19.96
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone '+442039127853
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded 15
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid 2025/2026, 2026/2027, 2027/2028, 2028/2029, 2029/2030, 2030/2031, 2031/2032, 2032/2033, 2033/2034, 2034/2035, 2035/2036, 2036/2037, 2037/2038, 2038/2039, 2039/2040
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
null
Anticipated Pre-Refurbishing De-Rated Capacity
null
Anticipated Post-Refurbishing De-Rated Capacity
null
Legal Name of any Person with a Security Interest 1.Santander UK plc
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round 15
Long-Stop Date for the Minimum Completion Requirement
null