Carlton, Stockton-on-Tees, TS21 1EA Map

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) 0.05 MW
  • De-Rated Capacity (CMU Registry) 10.75
  • Connection Capacity (CMU Registry) 13.70 MW
  • Anticipated Capacity (CMU Registry) 10.75 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name TATA STEEL UK LIMITED
  • Parent Company (CMU Registry) Corus Group Limited
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +4402077174412

Basic Information

Basic Information
  • Location Carlton, Stockton-on-Tees, TS21 1EA
  • Description Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
  • Company TATA STEEL UK LIMITED

Technical Details

Technical Details
  • Technology Storage (Duration 1h)
  • Generation Type N/A
  • Connection Type N/A
  • De-Rated Capacity 0.05
  • Connection / DSR Capacity 0.52
  • Type T-4

Auction Information

Auction Information
  • Auction 2028-29 (T-4) Four Year Ahead Capacity Auction
  • Delivery Year 2,028
  • Status N/A
  • Clearing Price N/A

Additional Information

Additional Information
  • CMU ID TS21_3
  • Location and Post Code Carlton, Stockton-on-Tees, TS21 1EA
  • Description of CMU Components Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
  • Generating Technology Class Storage (Duration 1h)
  • Company Name TATA STEEL UK LIMITED
  • Auction Name 2028-29 (T-4) Four Year Ahead Capacity Auction
  • _id 531,025
  • rank 0.00
  • Component ID ABS3HM
  • OS Grid Reference NZ 402 219
  • Primary Fuel of Component Storage - Battery
  • Permitted on-Site Generating Unit N/A
  • Pre-Refurbishing De-Rated Capacity N/A
  • Post-Refurbishing De-Rated Capacity N/A
  • Generating Capacity of on-site Generating Unit N/A

CMU Registry Data

CMU Registry Data
  • Auction Capacity Auction
  • Type T-1
  • Delivery Year 2,022
  • Name of Applicant TATA STEEL UK LIMITED
  • CM Unit Name Multi Site_16 Other

Field Value
_id 531025
Type T-4
rank 0.00271911
CMU ID ANC1B2
Auction Name 2028-29 (T-4) Four Year Ahead Capacity Auction
Component ID ABS3HM
Delivery Year 2028
De-Rated Capacity 0.054
OS Grid Reference NZ 402 219
Location and Post Code Carlton, Stockton-on-Tees, TS21 1EA
Connection / DSR Capacity 0.52
Primary Fuel of Component Storage - Battery
Generating Technology Class Storage (Duration 1h)
Description of CMU Components Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity
null
Post-Refurbishing De-Rated Capacity
null
Generating Capacity of on-site Generating Unit
null

Field Value
_id 6759
Type T-1
CMU ID TS21_3
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2022-23 (T-1) One Year Ahead Capacity Auction
CM Unit Name Multi Site_16 Other
CM Unit Type Non CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2022
Opt Out Status Opt-In
Opt-Out Reason
null
Parent Company Corus Group Limited
DSR Test Method
null
Is FCM required
null
CM Unit Category Proven DSR CMU
Storage Facility No
De-Rated Capacity 10.751
Name of Applicant TATA STEEL UK LIMITED
Primary Fuel Type DSR
Registered Holder TATA STEEL UK LIMITED
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity
null
DSR Bidding Capacity 7
Amount of Credit Cover (empty)
Termination Fee 1 Rate £5000.00 /MW
Termination Fee 2 Rate £25000.00 /MW
Termination Fee 3 Rate £10000.00 /MW
Termination Fee 4 Rate £15000.00 /MW
Termination Fee 5 Rate £35000.00 /MW
Connection / DSR Capacity 13.701
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary
null
Pre-Refurbishing CMU Status
null
Transmission / Distribution Distribution
Unique Agreement Identifier CAN-2022-TS21_3-001
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity 10.748
Term of the Capacity Agreement 1
Nature of the Security Interest
null
CMU confirmed entry into Auction Yes
Is Connection Agreement required
null
Pre-Refurbishment Bidding Status
null
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity
null
Date of Issue of Capacity Agreement 2022-03-25
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity
null
Auction Acquired Capacity Obligation 7
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone '+4402077174412
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid 2022/2023
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
null
Anticipated Pre-Refurbishing De-Rated Capacity
null
Anticipated Post-Refurbishing De-Rated Capacity
null
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement
null