The Manor Way, Stanford-le-Hope, Essex, SS17 9GN Map

General Information

Key Details
  • Description A CCGT station consisting of two Alstom GT26 gas turbines and a steam turbine and is based near Stanford-le-hope in Essex, England. Each turbine is individually metered with output being the total of all three turbines net of any auxillary load.
  • Auction 2022-23 (T-3) Three Year Ahead Capacity Auction
  • Delivery Year 2022
Geocoding Status: Yes

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) N/A
  • De-Rated Capacity (CMU Registry) 720
  • Connection Capacity (CMU Registry) 800 MW
  • Anticipated Capacity (CMU Registry) 720 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name CORYTON ENERGY COMPANY, LTD.
  • Parent Company (CMU Registry) INTERGEN POWER LTD
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +4401316246767

Field Value
_id 140566
Type T-3
rank 0.0573088
CMU ID IGCE19
Auction Name 2022-23 (T-3) Three Year Ahead Capacity Auction
Component ID T_COSO-1
Delivery Year 2022
De-Rated Capacity (empty)
OS Grid Reference TQ 739 822
Location and Post Code The Manor Way, Stanford-le-Hope, Essex, SS17 9GN
Connection / DSR Capacity (empty)
Primary Fuel of Component (empty)
Generating Technology Class Combined Cycle Gas Turbine (CCGT)
Description of CMU Components A CCGT station consisting of two Alstom GT26 gas turbines and a steam turbine and is based near Stanford-le-hope in Essex, England. Each turbine is individually metered with output being the total of all three turbines net of any auxillary load.
Permitted on-Site Generating Unit (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Post-Refurbishing De-Rated Capacity (empty)
Generating Capacity of on-site Generating Unit (empty)

Field Value
_id 9948
Type T-4
CMU ID IGCE19
Auction Capacity Auction
Agent Name (empty)
Beta Value (empty)
Auction Name 2023-24 (T-4) Four Year Ahead Capacity Auction
CM Unit Name Coryton
CM Unit Type CMRS
TEC Deferral (empty)
Unproven DSR (empty)
Delivery Year 2023
Opt Out Status Opt-In
Opt-Out Reason (empty)
Parent Company INTERGEN POWER LTD
DSR Test Method (empty)
Is FCM required (empty)
CM Unit Category Existing Generating CMU
Storage Facility No
De-Rated Capacity 720
Name of Applicant CORYTON ENERGY COMPANY, LTD.
Primary Fuel Type Gas
Registered Holder CORYTON ENERGY COMPANY, LTD.
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity (empty)
DSR Bidding Capacity (empty)
Amount of Credit Cover (empty)
Termination Fee 1 Rate £5000.00 /MW
Termination Fee 2 Rate £25000.00 /MW
Termination Fee 3 Rate £10000.00 /MW
Termination Fee 4 Rate £15000.00 /MW
Termination Fee 5 Rate £35000.00 /MW
Connection / DSR Capacity 800
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary (empty)
Pre-Refurbishing CMU Status (empty)
Transmission / Distribution Transmission
Unique Agreement Identifier CAN-2023-IGCE19-001
New Build Yet to Satisfy FCM (empty)
Planning Consents Conditions (empty)
Anticipated De-Rated Capacity 720
Term of the Capacity Agreement 1
Nature of the Security Interest 1.Floating charge pursuant to a security agreement dated 17 September 2024 and made between Coryton Energy Company, Ltd. and Macquarie Bank Limited (London Branch)
CMU confirmed entry into Auction Yes
Is Connection Agreement required (empty)
Pre-Refurbishment Bidding Status (empty)
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Date of Issue of Capacity Agreement 2020-04-17
List of Traded Capacity Obligations (empty)
Post-Refurbishing De-Rated Capacity (empty)
Auction Acquired Capacity Obligation 720
Date of Issue of DSR Test Certificate (empty)
Has Capacity Agreement been Suspended (empty)
Period for which the transfer applies (empty)
Secondary Trading Contact - Telephone '+4401316246767
Capacity Agreement has been Terminated (empty)
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone (empty)
Delivery Years for which Agreement Valid 2023/2024
Connection Agreement Deferral Declaration (empty)
Date of Termination of Capacity Agreement (empty)
Latest Date SCM is expected to be achieved (empty)
Subject to Substantial Completion Milestone (empty)
Subject to a Minimum Completion Requirement (empty)
Earliest Date SCM is expected to be achieved (empty)
Is copy of Grid Connection Agreement required (empty)
Anticipated Pre-Refurbishing De-Rated Capacity (empty)
Anticipated Post-Refurbishing De-Rated Capacity (empty)
Legal Name of any Person with a Security Interest 1.Macquarie Bank Limited (London Branch)
Date for provision of deferred Connection Agreement (empty)
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement (empty)