Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.
Field | Value |
---|---|
_id | 135 |
Type | T-3 |
rank | 0.0573088 |
CMU ID | IGRK19 |
Auction Name | 2022-23 (T-3) Three Year Ahead Capacity Auction |
Component ID | T_ROCK-1 |
Delivery Year | 2022 |
De-Rated Capacity |
null |
OS Grid Reference | SJ 517 800 |
Location and Post Code | Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ |
Connection / DSR Capacity |
null |
Primary Fuel of Component |
null |
Generating Technology Class | Combined Cycle Gas Turbine (CCGT) |
Description of CMU Components | A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near Runcorn in Cheshire. Metering of output is Net of auxillary load. |
Permitted on-Site Generating Unit |
null |
Pre-Refurbishing De-Rated Capacity |
null |
Post-Refurbishing De-Rated Capacity |
null |
Generating Capacity of on-site Generating Unit |
null |
Field | Value |
---|---|
_id | 9949 |
Type | T-4 |
CMU ID | IGRK19 |
Auction | Capacity Auction |
Agent Name |
null |
Beta Value |
null |
Auction Name | 2023-24 (T-4) Four Year Ahead Capacity Auction |
CM Unit Name | Rocksavage |
CM Unit Type | CMRS |
TEC Deferral |
null |
Unproven DSR |
null |
Delivery Year | 2023 |
Opt Out Status | Opt-In |
Opt-Out Reason |
null |
Parent Company | INTERGEN POWER LTD |
DSR Test Method |
null |
Is FCM required |
null |
CM Unit Category | Existing Generating CMU |
Storage Facility | No |
De-Rated Capacity | 747 |
Name of Applicant | ROCKSAVAGE POWER COMPANY, LTD. |
Primary Fuel Type | Gas |
Registered Holder | ROCKSAVAGE POWER COMPANY, LTD. |
Annual Penalty Cap | 1 |
Monthly Penalty Cap | 2 |
Proven DSR Capacity |
null |
DSR Bidding Capacity |
null |
Amount of Credit Cover | (empty) |
Termination Fee 1 Rate | £5000.00 /MW |
Termination Fee 2 Rate | £25000.00 /MW |
Termination Fee 3 Rate | £10000.00 /MW |
Termination Fee 4 Rate | £15000.00 /MW |
Termination Fee 5 Rate | £35000.00 /MW |
Connection / DSR Capacity | 830 |
Maximum Obligation Period | 1 |
Capacity Agreement Awarded | Yes |
Pre-Qualification Decision | Prequalified |
Capacity obligation Summary |
null |
Pre-Refurbishing CMU Status |
null |
Transmission / Distribution | Transmission |
Unique Agreement Identifier | CAN-2023-IGRK19-001 |
New Build Yet to Satisfy FCM |
null |
Planning Consents Conditions |
null |
Anticipated De-Rated Capacity | 747 |
Term of the Capacity Agreement | 1 |
Nature of the Security Interest | 1.Floating charge pursuant to a security agreement dated 17 September 2024 and made between Rocksavage Power Company, Ltd. and Macquarie Bank Limited (London Branch) |
CMU confirmed entry into Auction | Yes |
Is Connection Agreement required |
null |
Pre-Refurbishment Bidding Status |
null |
Secondary Trading Contact - Email | [email protected] |
Date for provision of deferred TEC |
null |
Pre-Refurbishing De-Rated Capacity |
null |
Date of Issue of Capacity Agreement | 2020-04-17 |
List of Traded Capacity Obligations |
null |
Post-Refurbishing De-Rated Capacity |
null |
Auction Acquired Capacity Obligation | 747 |
Date of Issue of DSR Test Certificate |
null |
Has Capacity Agreement been Suspended |
null |
Period for which the transfer applies |
null |
Secondary Trading Contact - Telephone | '+4401316246767 |
Capacity Agreement has been Terminated |
null |
Duration of Capacity Agreement Awarded | 1 |
Date for Financial Commitment Milestone |
null |
Delivery Years for which Agreement Valid | 2023/2024 |
Connection Agreement Deferral Declaration |
null |
Date of Termination of Capacity Agreement |
null |
Latest Date SCM is expected to be achieved |
null |
Subject to Substantial Completion Milestone |
null |
Subject to a Minimum Completion Requirement |
null |
Earliest Date SCM is expected to be achieved |
null |
Is copy of Grid Connection Agreement required |
null |
Anticipated Pre-Refurbishing De-Rated Capacity |
null |
Anticipated Post-Refurbishing De-Rated Capacity |
null |
Legal Name of any Person with a Security Interest | 1.Macquarie Bank Limited (London Branch) |
Date for provision of deferred Connection Agreement |
null |
Duration of Capacity Agreement in First Bidding Round | 1 |
Long-Stop Date for the Minimum Completion Requirement |
null |