Plot 8 Protos Grinsome Road Elton CH2 4LF Map

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) N/A
  • De-Rated Capacity (CMU Registry) 31.85
  • Connection Capacity (CMU Registry) 36.80 MW
  • Anticipated Capacity (CMU Registry) 31.85 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name Covanta Protos Development Limited
  • Parent Company (CMU Registry) Covanta Power International Holdings Inc
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +4412012078964

Basic Information

Basic Information
  • Location Plot 8 Protos Grinsome Road Elton CH2 4LF
  • Description An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass-burn technology which is the most proven Energy from Waste technology currently available. The process will consist of the delivery of waste to the Facility by truck, where it will be deposited in a storage bunker, from which it will be fed into one or two (to be determined) thermal units (or "streams"). Each stream will consist of a moving grate, boiler and air pollution control equipment. The steam generated will drive a turbine for the generation of electricity.
  • Company Covanta Protos Development Limited

Technical Details

Technical Details
  • Technology Energy from Waste
  • Generation Type N/A
  • Connection Type N/A
  • De-Rated Capacity N/A
  • Connection / DSR Capacity N/A
  • Type T-4

Auction Information

Auction Information
  • Auction 2022-23 (T-4) Four Year Ahead Capacity Auction
  • Delivery Year 2,022
  • Status N/A
  • Clearing Price N/A

Additional Information

Additional Information
  • CMU ID PROEFW
  • Location and Post Code Plot 8 Protos Grinsome Road Elton CH2 4LF
  • Description of CMU Components An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass-burn technology which is the most proven Energy from Waste technology currently available. The process will consist of the delivery of waste to the Facility by truck, where it will be deposited in a storage bunker, from which it will be fed into one or two (to be determined) thermal units (or "streams"). Each stream will consist of a moving grate, boiler and air pollution control equipment. The steam generated will drive a turbine for the generation of electricity.
  • Generating Technology Class Energy from Waste
  • Company Name Covanta Protos Development Limited
  • Auction Name 2022-23 (T-4) Four Year Ahead Capacity Auction
  • _id 194,160
  • rank 0.07
  • Component ID PROEFW
  • OS Grid Reference SJ 466 767
  • Primary Fuel of Component N/A
  • Permitted on-Site Generating Unit N/A
  • Pre-Refurbishing De-Rated Capacity N/A
  • Post-Refurbishing De-Rated Capacity N/A
  • Generating Capacity of on-site Generating Unit N/A

CMU Registry Data

CMU Registry Data
  • Auction Capacity Auction
  • Type T-4
  • Delivery Year 2,022
  • Name of Applicant Covanta Protos Development Limited
  • CM Unit Name Protos EfW

Field Value
_id 194160
Type T-4
rank 0.0706241
CMU ID PROEFW
Auction Name 2022-23 (T-4) Four Year Ahead Capacity Auction
Component ID PROEFW
Delivery Year 2022
De-Rated Capacity
null
OS Grid Reference SJ 466 767
Location and Post Code Plot 8 Protos Grinsome Road Elton CH2 4LF
Connection / DSR Capacity
null
Primary Fuel of Component
null
Generating Technology Class Energy from Waste
Description of CMU Components An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass-burn technology which is the most proven Energy from Waste technology currently available. The process will consist of the delivery of waste to the Facility by truck, where it will be deposited in a storage bunker, from which it will be fed into one or two (to be determined) thermal units (or "streams"). Each stream will consist of a moving grate, boiler and air pollution control equipment. The steam generated will drive a turbine for the generation of electricity.
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity
null
Post-Refurbishing De-Rated Capacity
null
Generating Capacity of on-site Generating Unit
null

Field Value
_id 8567
Type T-4
CMU ID PROEFW
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2022-23 (T-4) Four Year Ahead Capacity Auction
CM Unit Name Protos EfW
CM Unit Type Non CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2022
Opt Out Status Opt-In
Opt-Out Reason
null
Parent Company Covanta Power International Holdings Inc
DSR Test Method
null
Is FCM required
null
CM Unit Category New Build Generating CMU
Storage Facility No
De-Rated Capacity 31.854
Name of Applicant Covanta Protos Development Limited
Primary Fuel Type Waste
Registered Holder
null
Annual Penalty Cap
null
Monthly Penalty Cap
null
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover (empty)
Termination Fee 1 Rate
null
Termination Fee 2 Rate
null
Termination Fee 3 Rate
null
Termination Fee 4 Rate
null
Termination Fee 5 Rate
null
Connection / DSR Capacity 36.8
Maximum Obligation Period 15
Capacity Agreement Awarded
null
Pre-Qualification Decision Conditionally Prequalified
Capacity obligation Summary
null
Pre-Refurbishing CMU Status
null
Transmission / Distribution Distribution
Unique Agreement Identifier
null
New Build Yet to Satisfy FCM Yes
Planning Consents Conditions
null
Anticipated De-Rated Capacity 31.854
Term of the Capacity Agreement
null
Nature of the Security Interest
null
CMU confirmed entry into Auction No
Is Connection Agreement required
null
Pre-Refurbishment Bidding Status
null
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity
null
Date of Issue of Capacity Agreement
null
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity
null
Auction Acquired Capacity Obligation
null
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone '+4412012078964
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded
null
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid
null
Connection Agreement Deferral Declaration Yes
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
null
Anticipated Pre-Refurbishing De-Rated Capacity
null
Anticipated Post-Refurbishing De-Rated Capacity
null
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round
null
Long-Stop Date for the Minimum Completion Requirement
null