Redditch Generation Station Windsor Road Redditch B97 6HE Map

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) N/A
  • De-Rated Capacity (CMU Registry) 23.07
  • Connection Capacity (CMU Registry) 24.45 MW
  • Anticipated Capacity (CMU Registry) 23.07 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name ALKANE ENERGY UK LIMITED
  • Parent Company (CMU Registry) Alkane Energy Limited
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +4401604662400

Basic Information

Basic Information
  • Location Redditch Generation Station Windsor Road Redditch B97 6HE
  • Description Gas turbine generator
  • Company ALKANE ENERGY UK LIMITED

Technical Details

Technical Details
  • Technology Open Cycle Gas Turbine (OCGT)
  • Generation Type N/A
  • Connection Type N/A
  • De-Rated Capacity 23.07
  • Connection / DSR Capacity 24.45
  • Type T-1

Auction Information

Auction Information
  • Auction 2024-25 (T-1) One Year Ahead Capacity Auction
  • Delivery Year 2,024
  • Status N/A
  • Clearing Price N/A

Additional Information

Additional Information
  • CMU ID A2REDD
  • Location and Post Code Redditch Generation Station Windsor Road Redditch B97 6HE
  • Description of CMU Components Gas turbine generator
  • Generating Technology Class Open Cycle Gas Turbine (OCGT)
  • Company Name ALKANE ENERGY UK LIMITED
  • Auction Name 2024-25 (T-1) One Year Ahead Capacity Auction
  • _id 185,665
  • rank 0.06
  • Component ID Leven1
  • OS Grid Reference SP 034 683
  • Primary Fuel of Component Oil
  • Permitted on-Site Generating Unit N/A
  • Pre-Refurbishing De-Rated Capacity N/A
  • Post-Refurbishing De-Rated Capacity N/A
  • Generating Capacity of on-site Generating Unit N/A

CMU Registry Data

CMU Registry Data
  • Auction Capacity Auction
  • Type T-1
  • Delivery Year 2,024
  • Name of Applicant ALKANE ENERGY UK LIMITED
  • CM Unit Name Redditch

Field Value
_id 185665
Type T-1
rank 0.0573088
CMU ID A2REDD
Auction Name 2024-25 (T-1) One Year Ahead Capacity Auction
Component ID Leven1
Delivery Year 2024
De-Rated Capacity 23.07
OS Grid Reference SP 034 683
Location and Post Code Redditch Generation Station Windsor Road Redditch B97 6HE
Connection / DSR Capacity 24.452
Primary Fuel of Component Oil
Generating Technology Class Open Cycle Gas Turbine (OCGT)
Description of CMU Components Gas turbine generator
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity
null
Post-Refurbishing De-Rated Capacity
null
Generating Capacity of on-site Generating Unit
null

Field Value
_id 10460
Type T-1
CMU ID A2REDD
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2024-25 (T-1) One Year Ahead Capacity Auction
CM Unit Name Redditch
CM Unit Type Non CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2024
Opt Out Status Opt-In
Opt-Out Reason
null
Parent Company Alkane Energy Limited
DSR Test Method
null
Is FCM required
null
CM Unit Category Existing Generating CMU
Storage Facility No
De-Rated Capacity 23.07
Name of Applicant ALKANE ENERGY UK LIMITED
Primary Fuel Type Oil
Registered Holder ALKANE ENERGY UK LIMITED
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover (empty)
Termination Fee 1 Rate £5000.00 /MW
Termination Fee 2 Rate £25000.00 /MW
Termination Fee 3 Rate £10000.00 /MW
Termination Fee 4 Rate £15000.00 /MW
Termination Fee 5 Rate £35000.00 /MW
Connection / DSR Capacity 24.452
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary
null
Pre-Refurbishing CMU Status
null
Transmission / Distribution Distribution
Unique Agreement Identifier CAN-2024-A2REDD-001
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity 23.07
Term of the Capacity Agreement 1
Nature of the Security Interest
null
CMU confirmed entry into Auction Yes
Is Connection Agreement required
null
Pre-Refurbishment Bidding Status
null
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity
null
Date of Issue of Capacity Agreement 2024-04-02
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity
null
Auction Acquired Capacity Obligation 23.07
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone '+4401604662400
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid 2024/2025
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
null
Anticipated Pre-Refurbishing De-Rated Capacity
null
Anticipated Post-Refurbishing De-Rated Capacity
null
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement
null