Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.
Field | Value |
---|---|
_id | 149393 |
Type | T-4 |
rank | 0.0706241 |
CMU ID | SCU002 |
Auction Name | 2026-27 (T-4) Four Year Ahead Capacity Auction |
Component ID | SCU002 |
Delivery Year | 2026 |
De-Rated Capacity | 5.775 |
OS Grid Reference | TA 045 528 |
Location and Post Code | Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) |
Connection / DSR Capacity | 48.9 |
Primary Fuel of Component |
null |
Generating Technology Class | Storage (Duration 1h) |
Description of CMU Components | The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU) |
Permitted on-Site Generating Unit |
null |
Pre-Refurbishing De-Rated Capacity |
null |
Post-Refurbishing De-Rated Capacity |
null |
Generating Capacity of on-site Generating Unit |
null |
Field | Value |
---|---|
_id | 13970 |
Type | T-4 |
CMU ID | SCU002 |
Auction | Capacity Auction |
Agent Name |
null |
Beta Value |
null |
Auction Name | 2026-27 (T-4) Four Year Ahead Capacity Auction |
CM Unit Name | Scurf Dyke Solar Limited |
CM Unit Type | Non CMRS |
TEC Deferral |
null |
Unproven DSR |
null |
Delivery Year | 2026 |
Opt Out Status | Opt-In |
Opt-Out Reason |
null |
Parent Company |
null |
DSR Test Method |
null |
Is FCM required |
null |
CM Unit Category | New Build Generating CMU |
Storage Facility | Yes |
De-Rated Capacity | 5.775 |
Name of Applicant | FP LUX SCURF DYKE SOLAR LIMITED |
Primary Fuel Type | Storage - Battery |
Registered Holder |
null |
Annual Penalty Cap |
null |
Monthly Penalty Cap |
null |
Proven DSR Capacity |
null |
DSR Bidding Capacity |
null |
Amount of Credit Cover | 57750 |
Termination Fee 1 Rate |
null |
Termination Fee 2 Rate |
null |
Termination Fee 3 Rate |
null |
Termination Fee 4 Rate |
null |
Termination Fee 5 Rate |
null |
Connection / DSR Capacity | 48.9 |
Maximum Obligation Period | 15 |
Capacity Agreement Awarded |
null |
Pre-Qualification Decision | Not Prequalified |
Capacity obligation Summary |
null |
Pre-Refurbishing CMU Status |
null |
Transmission / Distribution | Distribution |
Unique Agreement Identifier |
null |
New Build Yet to Satisfy FCM |
null |
Planning Consents Conditions |
null |
Anticipated De-Rated Capacity | 5.893 |
Term of the Capacity Agreement |
null |
Nature of the Security Interest |
null |
CMU confirmed entry into Auction |
null |
Is Connection Agreement required |
null |
Pre-Refurbishment Bidding Status |
null |
Secondary Trading Contact - Email | [email protected] |
Date for provision of deferred TEC |
null |
Pre-Refurbishing De-Rated Capacity |
null |
Date of Issue of Capacity Agreement |
null |
List of Traded Capacity Obligations |
null |
Post-Refurbishing De-Rated Capacity |
null |
Auction Acquired Capacity Obligation |
null |
Date of Issue of DSR Test Certificate |
null |
Has Capacity Agreement been Suspended |
null |
Period for which the transfer applies |
null |
Secondary Trading Contact - Telephone | '+4401314663689 |
Capacity Agreement has been Terminated |
null |
Duration of Capacity Agreement Awarded |
null |
Date for Financial Commitment Milestone |
null |
Delivery Years for which Agreement Valid |
null |
Connection Agreement Deferral Declaration |
null |
Date of Termination of Capacity Agreement |
null |
Latest Date SCM is expected to be achieved |
null |
Subject to Substantial Completion Milestone |
null |
Subject to a Minimum Completion Requirement |
null |
Earliest Date SCM is expected to be achieved |
null |
Is copy of Grid Connection Agreement required |
null |
Anticipated Pre-Refurbishing De-Rated Capacity |
null |
Anticipated Post-Refurbishing De-Rated Capacity |
null |
Legal Name of any Person with a Security Interest |
null |
Date for provision of deferred Connection Agreement |
null |
Duration of Capacity Agreement in First Bidding Round |
null |
Long-Stop Date for the Minimum Completion Requirement |
null |