South Bristol Energy Limited - 13 Berkeley Street - London W1J 8DU Map

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) N/A
  • De-Rated Capacity (CMU Registry) 0
  • Connection Capacity (CMU Registry) 0 MW
  • Anticipated Capacity (CMU Registry) 6.75 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name South Bristol Energy Limited
  • Parent Company (CMU Registry) N/A
  • Secondary Trading Email (CMU Registry) N/A
  • Secondary Trading Phone (CMU Registry) N/A

Basic Information

Basic Information
  • Location South Bristol Energy Limited - 13 Berkeley Street - London W1J 8DU
  • Description The CMU will initially consist of 7.5 MWe / 10 MWth gas fired CHP plant based at an Energy Centre in Bedminster, South Bristol. The project will export power to the grid and will also involve the laying and construction of a district heating network that will connect to up to 1000 residential dwellings and a selection of commercial and industrial units. There will be scope to increase the electrical output to 12 MWe - but this will not be implemented as part of the first phase.
  • Company South Bristol Energy Limited

Technical Details

Technical Details
  • Technology N/A
  • Generation Type N/A
  • Connection Type N/A
  • De-Rated Capacity N/A
  • Connection / DSR Capacity N/A
  • Type T-4

Auction Information

Auction Information
  • Auction 2020-21 (T-4) Four Year Ahead Capacity Auction
  • Delivery Year 2,020
  • Status N/A
  • Clearing Price N/A

Additional Information

Additional Information
  • CMU ID SBE576
  • Location and Post Code South Bristol Energy Limited - 13 Berkeley Street - London W1J 8DU
  • Description of CMU Components The CMU will initially consist of 7.5 MWe / 10 MWth gas fired CHP plant based at an Energy Centre in Bedminster, South Bristol. The project will export power to the grid and will also involve the laying and construction of a district heating network that will connect to up to 1000 residential dwellings and a selection of commercial and industrial units. There will be scope to increase the electrical output to 12 MWe - but this will not be implemented as part of the first phase.
  • Generating Technology Class N/A
  • Company Name South Bristol Energy Limited
  • Auction Name 2020-21 (T-4) Four Year Ahead Capacity Auction
  • _id 149,866
  • rank 0.07
  • Component ID SBE576
  • OS Grid Reference ST 585 712
  • Primary Fuel of Component N/A
  • Permitted on-Site Generating Unit N/A
  • Pre-Refurbishing De-Rated Capacity N/A
  • Post-Refurbishing De-Rated Capacity N/A
  • Generating Capacity of on-site Generating Unit N/A

CMU Registry Data

CMU Registry Data
  • Auction Capacity Auction
  • Type T-4
  • Delivery Year 2,020
  • Name of Applicant South Bristol Energy Limited
  • CM Unit Name South Bristol Energy Limited

Field Value
_id 149866
Type T-4
rank 0.0706241
CMU ID SBE576
Auction Name 2020-21 (T-4) Four Year Ahead Capacity Auction
Component ID SBE576
Delivery Year 2020
De-Rated Capacity
null
OS Grid Reference ST 585 712
Location and Post Code South Bristol Energy Limited - 13 Berkeley Street - London W1J 8DU
Connection / DSR Capacity
null
Primary Fuel of Component
null
Generating Technology Class
null
Description of CMU Components The CMU will initially consist of 7.5 MWe / 10 MWth gas fired CHP plant based at an Energy Centre in Bedminster, South Bristol. The project will export power to the grid and will also involve the laying and construction of a district heating network that will connect to up to 1000 residential dwellings and a selection of commercial and industrial units. There will be scope to increase the electrical output to 12 MWe - but this will not be implemented as part of the first phase.
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity
null
Post-Refurbishing De-Rated Capacity
null
Generating Capacity of on-site Generating Unit
null

Field Value
_id 4476
Type T-4
CMU ID SBE576
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2020-21 (T-4) Four Year Ahead Capacity Auction
CM Unit Name South Bristol Energy Limited
CM Unit Type Non CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2020
Opt Out Status Opt-In
Opt-Out Reason
null
Parent Company
null
DSR Test Method
null
Is FCM required
null
CM Unit Category New Build Generating CMU
Storage Facility No
De-Rated Capacity (empty)
Name of Applicant South Bristol Energy Limited
Primary Fuel Type
null
Registered Holder
null
Annual Penalty Cap
null
Monthly Penalty Cap
null
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover (empty)
Termination Fee 1 Rate
null
Termination Fee 2 Rate
null
Termination Fee 3 Rate
null
Termination Fee 4 Rate
null
Termination Fee 5 Rate
null
Connection / DSR Capacity (empty)
Maximum Obligation Period
null
Capacity Agreement Awarded
null
Pre-Qualification Decision Rejected
Capacity obligation Summary
null
Pre-Refurbishing CMU Status
null
Transmission / Distribution Distribution
Unique Agreement Identifier
null
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity 6.75
Term of the Capacity Agreement
null
Nature of the Security Interest
null
CMU confirmed entry into Auction
null
Is Connection Agreement required
null
Pre-Refurbishment Bidding Status
null
Secondary Trading Contact - Email
null
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity
null
Date of Issue of Capacity Agreement
null
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity
null
Auction Acquired Capacity Obligation
null
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone
null
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded
null
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid
null
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
null
Anticipated Pre-Refurbishing De-Rated Capacity
null
Anticipated Post-Refurbishing De-Rated Capacity
null
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round
null
Long-Stop Date for the Minimum Completion Requirement
null