Home List View Map View Technologies Companies Support Us Help Login Register
Theme
Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ Map

General Information

Key Details
  • Description A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near Runcorn in Cheshire. Metering of output is Net of auxillary load.
  • Auction 2024-25 (T-1) One Year Ahead Capacity Auction
  • Delivery Year 2024
Geocoding Status: Yes

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) N/A
  • De-Rated Capacity (CMU Registry) 741.88
  • Connection Capacity (CMU Registry) 810 MW
  • Anticipated Capacity (CMU Registry) 741.88 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name ROCKSAVAGE POWER COMPANY, LTD.
  • Parent Company (CMU Registry) INTERGEN POWER LTD
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +4401316246767

Field Value
_id 375744
Type T-1
rank 0.0573088
CMU ID IGRK23
Auction Name 2024-25 (T-1) One Year Ahead Capacity Auction
Component ID T_ROCK-1
Delivery Year 2024
De-Rated Capacity 741.879
OS Grid Reference SJ 517 800
Location and Post Code Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ
Connection / DSR Capacity 810
Primary Fuel of Component Gas
Generating Technology Class Combined Cycle Gas Turbine (CCGT)
Description of CMU Components A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near Runcorn in Cheshire. Metering of output is Net of auxillary load.
Permitted on-Site Generating Unit (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Post-Refurbishing De-Rated Capacity (empty)
Generating Capacity of on-site Generating Unit (empty)

Field Value
_id 14667
Type T-4
CMU ID IGRK23
Auction Capacity Auction
Agent Name (empty)
Beta Value (empty)
Auction Name 2027-28 (T-4) Four Year Ahead Capacity Auction
CM Unit Name Rocksavage
CM Unit Type CMRS
TEC Deferral (empty)
Unproven DSR (empty)
Delivery Year 2027
Opt Out Status Opt-In
Opt-Out Reason (empty)
Parent Company INTERGEN POWER LTD
DSR Test Method (empty)
Is FCM required (empty)
CM Unit Category Existing Generating CMU
Storage Facility No
De-Rated Capacity 741.879
Name of Applicant ROCKSAVAGE POWER COMPANY, LTD.
Primary Fuel Type Gas
Registered Holder ROCKSAVAGE POWER COMPANY, LTD.
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity (empty)
DSR Bidding Capacity (empty)
Amount of Credit Cover (empty)
Termination Fee 1 Rate £5000.00 /MW
Termination Fee 2 Rate £25000.00 /MW
Termination Fee 3 Rate £10000.00 /MW
Termination Fee 4 Rate £15000.00 /MW
Termination Fee 5 Rate £35000.00 /MW
Connection / DSR Capacity 810
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary (empty)
Pre-Refurbishing CMU Status (empty)
Transmission / Distribution Transmission
Unique Agreement Identifier CAN-2027-IGRK23-001
New Build Yet to Satisfy FCM (empty)
Planning Consents Conditions (empty)
Anticipated De-Rated Capacity 741.879
Term of the Capacity Agreement 1
Nature of the Security Interest 1.Floating charge pursuant to a security agreement dated 17 September 2024 and made between Rocksavage Power Company, Ltd. and Macquarie Bank Limited (London Branch)
CMU confirmed entry into Auction Yes
Is Connection Agreement required (empty)
Pre-Refurbishment Bidding Status (empty)
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Date of Issue of Capacity Agreement 2024-04-08
List of Traded Capacity Obligations (empty)
Post-Refurbishing De-Rated Capacity (empty)
Auction Acquired Capacity Obligation 741.879
Date of Issue of DSR Test Certificate (empty)
Has Capacity Agreement been Suspended (empty)
Period for which the transfer applies (empty)
Secondary Trading Contact - Telephone '+4401316246767
Capacity Agreement has been Terminated (empty)
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone (empty)
Delivery Years for which Agreement Valid 2027/2028
Connection Agreement Deferral Declaration (empty)
Date of Termination of Capacity Agreement (empty)
Latest Date SCM is expected to be achieved (empty)
Subject to Substantial Completion Milestone (empty)
Subject to a Minimum Completion Requirement (empty)
Earliest Date SCM is expected to be achieved (empty)
Is copy of Grid Connection Agreement required (empty)
Anticipated Pre-Refurbishing De-Rated Capacity (empty)
Anticipated Post-Refurbishing De-Rated Capacity (empty)
Legal Name of any Person with a Security Interest 1.Macquarie Bank Limited (London Branch)
Date for provision of deferred Connection Agreement (empty)
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement (empty)