NG21 8BG Map

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) N/A
  • De-Rated Capacity (CMU Registry) 10.82
  • Connection Capacity (CMU Registry) 11.56 MW
  • Anticipated Capacity (CMU Registry) 10.12 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name ALKANE ENERGY CM LIMITED
  • Parent Company (CMU Registry) N/A
  • Secondary Trading Email (CMU Registry) N/A
  • Secondary Trading Phone (CMU Registry) N/A

Basic Information

Basic Information
  • Location NG21 8BG
  • Description 5x 2MW Containerised Generating Sets. Star Lane: Unit 1, Star Lane, Harwich, Bolton, BL6 5HR Leopold Street: 18 Leopold Street, Pemberton, Wigan, WN5 8DH. Auxiliary load subtracted prior to the metering point.
  • Company ALKANE ENERGY CM LIMITED

Technical Details

Technical Details
  • Technology N/A
  • Generation Type N/A
  • Connection Type N/A
  • De-Rated Capacity N/A
  • Connection / DSR Capacity N/A
  • Type ST

Auction Information

Auction Information
  • Auction 2017-18 (T-1) One Year Ahead Capacity Auction
  • Delivery Year 2,017
  • Status N/A
  • Clearing Price N/A

Additional Information

Additional Information
  • CMU ID 4UKNN5
  • Location and Post Code NG21 8BG
  • Description of CMU Components 5x 2MW Containerised Generating Sets. Star Lane: Unit 1, Star Lane, Harwich, Bolton, BL6 5HR Leopold Street: 18 Leopold Street, Pemberton, Wigan, WN5 8DH. Auxiliary load subtracted prior to the metering point.
  • Generating Technology Class N/A
  • Company Name ALKANE ENERGY CM LIMITED
  • Auction Name 2017-18 (T-1) One Year Ahead Capacity Auction
  • _id 567,062
  • rank 0.06
  • Component ID AUKNN514-1
  • OS Grid Reference N/A
  • Primary Fuel of Component N/A
  • Permitted on-Site Generating Unit N/A
  • Pre-Refurbishing De-Rated Capacity N/A
  • Post-Refurbishing De-Rated Capacity N/A
  • Generating Capacity of on-site Generating Unit N/A

CMU Registry Data

CMU Registry Data
  • Auction Capacity Auction
  • Type T-4
  • Delivery Year 2,018
  • Name of Applicant Alkane Energy Limited
  • CM Unit Name Star Lane & Leopold Street

Field Value
_id 567062
Type ST
rank 0.0573088
CMU ID 4UKNN5
Auction Name 2017-18 (T-1) One Year Ahead Capacity Auction
Component ID AUKNN514-1
Delivery Year 2017
De-Rated Capacity
null
OS Grid Reference
null
Location and Post Code NG21 8BG
Connection / DSR Capacity
null
Primary Fuel of Component
null
Generating Technology Class
null
Description of CMU Components 5x 2MW Containerised Generating Sets. Star Lane: Unit 1, Star Lane, Harwich, Bolton, BL6 5HR Leopold Street: 18 Leopold Street, Pemberton, Wigan, WN5 8DH. Auxiliary load subtracted prior to the metering point.
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity
null
Post-Refurbishing De-Rated Capacity
null
Generating Capacity of on-site Generating Unit
null

Field Value
_id 1800
Type T-4
CMU ID 4UKNN5
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2018-19 (T-4) Four Year Ahead Capacity Auction
CM Unit Name Star Lane & Leopold Street
CM Unit Type Non CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2018
Opt Out Status Opt-In
Opt-Out Reason N/A (Opt-in)
Parent Company
null
DSR Test Method
null
Is FCM required
null
CM Unit Category New Build Generating CMU
Storage Facility
null
De-Rated Capacity 10.82
Name of Applicant Alkane Energy Limited
Primary Fuel Type
null
Registered Holder Alkane Energy CM Limited
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover (empty)
Termination Fee 1 Rate £5,000/MW
Termination Fee 2 Rate £25,000/MW
Termination Fee 3 Rate
null
Termination Fee 4 Rate
null
Termination Fee 5 Rate
null
Connection / DSR Capacity 11.56
Maximum Obligation Period 15
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary 01/10/2018 - 30/09/2021 = 10.820 MW; 01/10/2021 - 30/09/2022 = 8.820 MW; 04/03/2022 - 30/09/2022 = 10.820 MW 01/10/2022 - 30/09/2033 = 10.820 MW
Pre-Refurbishing CMU Status
null
Transmission / Distribution Distribution
Unique Agreement Identifier CAN-2018-4UKNN5-00001
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity 10.119241
Term of the Capacity Agreement 15
Nature of the Security Interest
null
CMU confirmed entry into Auction Yes
Is Connection Agreement required
null
Pre-Refurbishment Bidding Status N/A
Secondary Trading Contact - Email
null
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity (empty)
Date of Issue of Capacity Agreement 2015-01-30
List of Traded Capacity Obligations T1: -2.000 MW; T2: 2.000MW
Post-Refurbishing De-Rated Capacity (empty)
Auction Acquired Capacity Obligation 10.82
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies T1: 01/10/2021 - 30/09/2022; T2: 04/03/2022 - 30/09/2022
Secondary Trading Contact - Telephone
null
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded 15
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid 2018/2019, 2019/2020, 2020/2021, 2021/2022, 2022/2023, 2023/2024, 2024/2025, 2025/2026, 2026/2027, 2027/2028, 2028/2029, 2029/2030, 2030/2031, 2031/2032, 2032/2033
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
Anticipated Pre-Refurbishing De-Rated Capacity (empty)
Anticipated Post-Refurbishing De-Rated Capacity (empty)
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round 15
Long-Stop Date for the Minimum Completion Requirement
null