BATTERSEA POWER STATION BATTERSEA POWER STATION LONDON LONDON SW11 8AH Map

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) 1.73 MW
  • De-Rated Capacity (CMU Registry) 0.32
  • Connection Capacity (CMU Registry) 1.30 MW
  • Anticipated Capacity (CMU Registry) 0.32 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name LIMEJUMP LTD
  • Parent Company (CMU Registry) The Shell Petroleum Company Limited
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +4402083966848

Basic Information

Basic Information
  • Location BATTERSEA POWER STATION BATTERSEA POWER STATION LONDON LONDON SW11 8AH
  • Description Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the overall CMU capacity of 3.557 MW as per the 3 highest export peaks.
  • Company LIMEJUMP LTD

Technical Details

Technical Details
  • Technology Combined Heat and Power (CHP)
  • Generation Type N/A
  • Connection Type N/A
  • De-Rated Capacity 1.73
  • Connection / DSR Capacity 1.91
  • Type T-4

Auction Information

Auction Information
  • Auction 2028-29 (T-4) Four Year Ahead Capacity Auction
  • Delivery Year 2,028
  • Status N/A
  • Clearing Price N/A

Additional Information

Additional Information
  • CMU ID BAT002
  • Location and Post Code BATTERSEA POWER STATION BATTERSEA POWER STATION LONDON LONDON SW11 8AH
  • Description of CMU Components Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the overall CMU capacity of 3.557 MW as per the 3 highest export peaks.
  • Generating Technology Class Combined Heat and Power (CHP)
  • Company Name LIMEJUMP LTD
  • Auction Name 2028-29 (T-4) Four Year Ahead Capacity Auction
  • _id 534,589
  • rank 0.06
  • Component ID BAT002
  • OS Grid Reference TQ 294 775
  • Primary Fuel of Component Gas
  • Permitted on-Site Generating Unit N/A
  • Pre-Refurbishing De-Rated Capacity N/A
  • Post-Refurbishing De-Rated Capacity N/A
  • Generating Capacity of on-site Generating Unit N/A

CMU Registry Data

CMU Registry Data
  • Auction Capacity Auction
  • Type T-4
  • Delivery Year 2,024
  • Name of Applicant LIMEJUMP LTD
  • CM Unit Name BAT002

Field Value
_id 534589
Type T-4
rank 0.0573088
CMU ID BTS001
Auction Name 2028-29 (T-4) Four Year Ahead Capacity Auction
Component ID BAT002
Delivery Year 2028
De-Rated Capacity 1.733
OS Grid Reference TQ 294 775
Location and Post Code BATTERSEA POWER STATION BATTERSEA POWER STATION LONDON LONDON SW11 8AH
Connection / DSR Capacity 1.906
Primary Fuel of Component Gas
Generating Technology Class Combined Heat and Power (CHP)
Description of CMU Components Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the overall CMU capacity of 3.557 MW as per the 3 highest export peaks.
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity
null
Post-Refurbishing De-Rated Capacity
null
Generating Capacity of on-site Generating Unit
null

Field Value
_id 10991
Type T-4
CMU ID BAT002
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2024-25 (T-4) Four Year Ahead Capacity Auction
CM Unit Name BAT002
CM Unit Type Non CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2024
Opt Out Status Opt-In
Opt-Out Reason
null
Parent Company The Shell Petroleum Company Limited
DSR Test Method
null
Is FCM required
null
CM Unit Category Existing Generating CMU
Storage Facility Yes
De-Rated Capacity 0.322
Name of Applicant LIMEJUMP LTD
Primary Fuel Type Storage - Battery
Registered Holder LIMEJUMP LTD
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover (empty)
Termination Fee 1 Rate £5000.00 /MW
Termination Fee 2 Rate £25000.00 /MW
Termination Fee 3 Rate £10000.00 /MW
Termination Fee 4 Rate £15000.00 /MW
Termination Fee 5 Rate £35000.00 /MW
Connection / DSR Capacity 1.3
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary
null
Pre-Refurbishing CMU Status
null
Transmission / Distribution Distribution
Unique Agreement Identifier CAN-2024-BAT002-001
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity 0.322
Term of the Capacity Agreement 1
Nature of the Security Interest
null
CMU confirmed entry into Auction Yes
Is Connection Agreement required
null
Pre-Refurbishment Bidding Status
null
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity
null
Date of Issue of Capacity Agreement 2021-04-19
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity
null
Auction Acquired Capacity Obligation 0.322
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone '+4402083966848
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid 2024/2025
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
null
Anticipated Pre-Refurbishing De-Rated Capacity
null
Anticipated Post-Refurbishing De-Rated Capacity
null
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement
null