West Marsh Road, Spalding, Lincolnshire, PE11 3BB Map

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) N/A
  • De-Rated Capacity (CMU Registry) 855
  • Connection Capacity (CMU Registry) 950 MW
  • Anticipated Capacity (CMU Registry) 855 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name SPALDING ENERGY COMPANY, LTD.
  • Parent Company (CMU Registry) INTERGEN POWER LTD
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +4401316246767

Basic Information

Basic Information
  • Location West Marsh Road, Spalding, Lincolnshire, PE11 3BB
  • Description A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. Each turbine is individually metered with output being the total of all three turbines net of any auxillary load.
  • Company SPALDING ENERGY COMPANY, LTD.

Technical Details

Technical Details
  • Technology Combined Cycle Gas Turbine (CCGT)
  • Generation Type N/A
  • Connection Type N/A
  • De-Rated Capacity N/A
  • Connection / DSR Capacity N/A
  • Type T-4

Auction Information

Auction Information
  • Auction 2024-25 (T-4) Four Year Ahead Capacity Auction
  • Delivery Year 2,024
  • Status N/A
  • Clearing Price N/A

Additional Information

Additional Information
  • CMU ID IGSP20
  • Location and Post Code West Marsh Road, Spalding, Lincolnshire, PE11 3BB
  • Description of CMU Components A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. Each turbine is individually metered with output being the total of all three turbines net of any auxillary load.
  • Generating Technology Class Combined Cycle Gas Turbine (CCGT)
  • Company Name SPALDING ENERGY COMPANY, LTD.
  • Auction Name 2024-25 (T-4) Four Year Ahead Capacity Auction
  • _id 51,476
  • rank 0.06
  • Component ID T_SPLN-1
  • OS Grid Reference TF 258 249
  • Primary Fuel of Component N/A
  • Permitted on-Site Generating Unit N/A
  • Pre-Refurbishing De-Rated Capacity N/A
  • Post-Refurbishing De-Rated Capacity N/A
  • Generating Capacity of on-site Generating Unit N/A

CMU Registry Data

CMU Registry Data
  • Auction Capacity Auction
  • Type T-4
  • Delivery Year 2,024
  • Name of Applicant SPALDING ENERGY COMPANY, LTD.
  • CM Unit Name Spalding

Field Value
_id 51476
Type T-4
rank 0.0573088
CMU ID IGSP20
Auction Name 2024-25 (T-4) Four Year Ahead Capacity Auction
Component ID T_SPLN-1
Delivery Year 2024
De-Rated Capacity
null
OS Grid Reference TF 258 249
Location and Post Code West Marsh Road, Spalding, Lincolnshire, PE11 3BB
Connection / DSR Capacity
null
Primary Fuel of Component
null
Generating Technology Class Combined Cycle Gas Turbine (CCGT)
Description of CMU Components A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. Each turbine is individually metered with output being the total of all three turbines net of any auxillary load.
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity
null
Post-Refurbishing De-Rated Capacity
null
Generating Capacity of on-site Generating Unit
null

Field Value
_id 11521
Type T-4
CMU ID IGSP20
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2024-25 (T-4) Four Year Ahead Capacity Auction
CM Unit Name Spalding
CM Unit Type CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2024
Opt Out Status Opt-In
Opt-Out Reason
null
Parent Company INTERGEN POWER LTD
DSR Test Method
null
Is FCM required
null
CM Unit Category Existing Generating CMU
Storage Facility No
De-Rated Capacity 855
Name of Applicant SPALDING ENERGY COMPANY, LTD.
Primary Fuel Type Gas
Registered Holder SPALDING ENERGY COMPANY, LTD.
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover (empty)
Termination Fee 1 Rate £5000.00 /MW
Termination Fee 2 Rate £25000.00 /MW
Termination Fee 3 Rate £10000.00 /MW
Termination Fee 4 Rate £15000.00 /MW
Termination Fee 5 Rate £35000.00 /MW
Connection / DSR Capacity 950
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary
null
Pre-Refurbishing CMU Status
null
Transmission / Distribution Transmission
Unique Agreement Identifier CAN-2024-IGSP20-001
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity 855
Term of the Capacity Agreement 1
Nature of the Security Interest 1.Floating charge pursuant to a security agreement dated 17 September 2024 and made between Spalding Energy Company, Ltd. and Macquarie Bank Limited (London Branch)
CMU confirmed entry into Auction Yes
Is Connection Agreement required
null
Pre-Refurbishment Bidding Status
null
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity
null
Date of Issue of Capacity Agreement 2021-04-19
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity
null
Auction Acquired Capacity Obligation 855
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone '+4401316246767
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid 2024/2025
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
null
Anticipated Pre-Refurbishing De-Rated Capacity
null
Anticipated Post-Refurbishing De-Rated Capacity
null
Legal Name of any Person with a Security Interest 1.Macquarie Bank Limited (London Branch)
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement
null