Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET Map

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) 0.91 MW
  • De-Rated Capacity (CMU Registry) 2.61
  • Connection Capacity (CMU Registry) 2.87 MW
  • Anticipated Capacity (CMU Registry) 2.61 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name BIRMINGHAM DISTRICT ENERGY COMPANY LIMITED
  • Parent Company (CMU Registry) BRING ENERGY GROUP LIMITED
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +4407811071199

Basic Information

Basic Information
  • Location Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET
  • Description 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
  • Company BIRMINGHAM DISTRICT ENERGY COMPANY LIMITED

Technical Details

Technical Details
  • Technology Combined Heat and Power (CHP)
  • Generation Type N/A
  • Connection Type N/A
  • De-Rated Capacity 0.91
  • Connection / DSR Capacity 1.00
  • Type T-4

Auction Information

Auction Information
  • Auction 2028-29 (T-4) Four Year Ahead Capacity Auction
  • Delivery Year 2,028
  • Status N/A
  • Clearing Price N/A

Additional Information

Additional Information
  • CMU ID BDEC01
  • Location and Post Code Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET
  • Description of CMU Components 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
  • Generating Technology Class Combined Heat and Power (CHP)
  • Company Name BIRMINGHAM DISTRICT ENERGY COMPANY LIMITED
  • Auction Name 2028-29 (T-4) Four Year Ahead Capacity Auction
  • _id 534,583
  • rank 0.06
  • Component ID AST001
  • OS Grid Reference SP 075 876
  • Primary Fuel of Component Gas
  • Permitted on-Site Generating Unit N/A
  • Pre-Refurbishing De-Rated Capacity N/A
  • Post-Refurbishing De-Rated Capacity N/A
  • Generating Capacity of on-site Generating Unit N/A

CMU Registry Data

CMU Registry Data
  • Auction Capacity Auction
  • Type T-4
  • Delivery Year 2,028
  • Name of Applicant BIRMINGHAM DISTRICT ENERGY COMPANY LIMITED
  • CM Unit Name BDEC1

Field Value
_id 534583
Type T-4
rank 0.0573088
CMU ID BDEC01
Auction Name 2028-29 (T-4) Four Year Ahead Capacity Auction
Component ID AST001
Delivery Year 2028
De-Rated Capacity 0.911
OS Grid Reference SP 075 876
Location and Post Code Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET
Connection / DSR Capacity 1.002
Primary Fuel of Component Gas
Generating Technology Class Combined Heat and Power (CHP)
Description of CMU Components 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity
null
Post-Refurbishing De-Rated Capacity
null
Generating Capacity of on-site Generating Unit
null

Field Value
_id 15067
Type T-4
CMU ID BDEC01
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2028-29 (T-4) Four Year Ahead Capacity Auction
CM Unit Name BDEC1
CM Unit Type Non CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2028
Opt Out Status Opt-In
Opt-Out Reason
null
Parent Company BRING ENERGY GROUP LIMITED
DSR Test Method
null
Is FCM required
null
CM Unit Category Existing Generating CMU
Storage Facility No
De-Rated Capacity 2.606
Name of Applicant BIRMINGHAM DISTRICT ENERGY COMPANY LIMITED
Primary Fuel Type Gas
Registered Holder
null
Annual Penalty Cap
null
Monthly Penalty Cap
null
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover
null
Termination Fee 1 Rate
null
Termination Fee 2 Rate
null
Termination Fee 3 Rate
null
Termination Fee 4 Rate
null
Termination Fee 5 Rate
null
Connection / DSR Capacity 2.866
Maximum Obligation Period 1
Capacity Agreement Awarded
null
Pre-Qualification Decision Rejected
Capacity obligation Summary
null
Pre-Refurbishing CMU Status
null
Transmission / Distribution Distribution
Unique Agreement Identifier
null
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity 2.606
Term of the Capacity Agreement
null
Nature of the Security Interest
null
CMU confirmed entry into Auction
null
Is Connection Agreement required
null
Pre-Refurbishment Bidding Status
null
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity
null
Date of Issue of Capacity Agreement
null
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity
null
Auction Acquired Capacity Obligation
null
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone '+4407811071199
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded
null
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid
null
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
null
Anticipated Pre-Refurbishing De-Rated Capacity
null
Anticipated Post-Refurbishing De-Rated Capacity
null
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round
null
Long-Stop Date for the Minimum Completion Requirement
null