Earls Road, Grangemouth FK3 8XG, Scotland, United Kingdom Map

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) 14.89 MW
  • De-Rated Capacity (CMU Registry) 14.89
  • Connection Capacity (CMU Registry) 16.92 MW
  • Anticipated Capacity (CMU Registry) 14.89 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name EARLS GATE ENERGY CENTRE LIMITED
  • Parent Company (CMU Registry) EGEC Holdings Limited
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +4401913734485

Basic Information

Basic Information
  • Location Earls Road, Grangemouth FK3 8XG, Scotland, United Kingdom
  • Description Energy-from-Waste plant fuelled by refuse derived fuel (waste).
  • Company EARLS GATE ENERGY CENTRE LIMITED

Technical Details

Technical Details
  • Technology Energy from Waste
  • Generation Type N/A
  • Connection Type N/A
  • De-Rated Capacity 14.89
  • Connection / DSR Capacity 16.92
  • Type T-1

Auction Information

Auction Information
  • Auction 2025-26 (T-1) One Year Ahead Capacity Auction
  • Delivery Year 2,025
  • Status N/A
  • Clearing Price N/A

Additional Information

Additional Information
  • CMU ID EGECL1
  • Location and Post Code Earls Road, Grangemouth FK3 8XG, Scotland, United Kingdom
  • Description of CMU Components Energy-from-Waste plant fuelled by refuse derived fuel (waste).
  • Generating Technology Class Energy from Waste
  • Company Name EARLS GATE ENERGY CENTRE LIMITED
  • Auction Name 2025-26 (T-1) One Year Ahead Capacity Auction
  • _id 410,833
  • rank 0.07
  • Component ID EGECL1
  • OS Grid Reference NS 918 812
  • Primary Fuel of Component Waste
  • Permitted on-Site Generating Unit N/A
  • Pre-Refurbishing De-Rated Capacity N/A
  • Post-Refurbishing De-Rated Capacity N/A
  • Generating Capacity of on-site Generating Unit N/A

CMU Registry Data

CMU Registry Data
  • Auction Capacity Auction
  • Type T-4
  • Delivery Year 2,028
  • Name of Applicant EARLS GATE ENERGY CENTRE LIMITED
  • CM Unit Name EGECL1

Field Value
_id 410833
Type T-1
rank 0.0706241
CMU ID EGECL1
Auction Name 2025-26 (T-1) One Year Ahead Capacity Auction
Component ID EGECL1
Delivery Year 2025
De-Rated Capacity 14.894
OS Grid Reference NS 918 812
Location and Post Code Earls Road, Grangemouth FK3 8XG, Scotland, United Kingdom
Connection / DSR Capacity 16.919
Primary Fuel of Component Waste
Generating Technology Class Energy from Waste
Description of CMU Components Energy-from-Waste plant fuelled by refuse derived fuel (waste).
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity
null
Post-Refurbishing De-Rated Capacity
null
Generating Capacity of on-site Generating Unit
null

Field Value
_id 15292
Type T-4
CMU ID EGECL1
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2028-29 (T-4) Four Year Ahead Capacity Auction
CM Unit Name EGECL1
CM Unit Type Non CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2028
Opt Out Status Opt-In
Opt-Out Reason
null
Parent Company EGEC Holdings Limited
DSR Test Method
null
Is FCM required
null
CM Unit Category Existing Generating CMU
Storage Facility No
De-Rated Capacity 14.893
Name of Applicant EARLS GATE ENERGY CENTRE LIMITED
Primary Fuel Type Waste
Registered Holder EARLS GATE ENERGY CENTRE LIMITED
Annual Penalty Cap
null
Monthly Penalty Cap
null
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover
null
Termination Fee 1 Rate
null
Termination Fee 2 Rate
null
Termination Fee 3 Rate
null
Termination Fee 4 Rate
null
Termination Fee 5 Rate
null
Connection / DSR Capacity 16.918
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary
null
Pre-Refurbishing CMU Status
null
Transmission / Distribution Distribution
Unique Agreement Identifier
null
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity 14.893
Term of the Capacity Agreement
null
Nature of the Security Interest
null
CMU confirmed entry into Auction Yes
Is Connection Agreement required
null
Pre-Refurbishment Bidding Status
null
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity
null
Date of Issue of Capacity Agreement
null
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity
null
Auction Acquired Capacity Obligation
null
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone '+4401913734485
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid
null
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
null
Anticipated Pre-Refurbishing De-Rated Capacity
null
Anticipated Post-Refurbishing De-Rated Capacity
null
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement
null