Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.
Field | Value |
---|---|
_id | 534665 |
Type | T-4 |
rank | 0.0573088 |
CMU ID | GILIC2 |
Auction Name | 2028-29 (T-4) Four Year Ahead Capacity Auction |
Component ID | GILIC1 |
Delivery Year | 2028 |
De-Rated Capacity |
null |
OS Grid Reference | SM 933 016 |
Location and Post Code | GREENLINK INTERCONNECTOR CONVERTER STATION, PWLLCROCHAN, PEMBROKE, SA71 5TP |
Connection / DSR Capacity |
null |
Primary Fuel of Component |
null |
Generating Technology Class | Greenlink (Republic of Ireland) |
Description of CMU Components | Greenlink is a subsea and underground electricity interconnector cable (with associated converter stations) linking the existing electricity grids in Ireland and Great Britain. The Greenlink Interconnector has granted Grid Connection capacity of 504MW. Greenlink will provide a new grid connection between EirGrid?s Great Island substation in County Wexford (Ireland) and National Grid?s Pembroke substation in Pembrokeshire (Wales). |
Permitted on-Site Generating Unit |
null |
Pre-Refurbishing De-Rated Capacity |
null |
Post-Refurbishing De-Rated Capacity |
null |
Generating Capacity of on-site Generating Unit |
null |
Field | Value |
---|---|
_id | 15521 |
Type | T-4 |
CMU ID | GILIC2 |
Auction | Capacity Auction |
Agent Name |
null |
Beta Value |
null |
Auction Name | 2028-29 (T-4) Four Year Ahead Capacity Auction |
CM Unit Name | Greenlink |
CM Unit Type | CMRS |
TEC Deferral |
null |
Unproven DSR |
null |
Delivery Year | 2028 |
Opt Out Status | Opt-In |
Opt-Out Reason |
null |
Parent Company | Greenlink Interconnector Trading Limited |
DSR Test Method |
null |
Is FCM required |
null |
CM Unit Category | New Build Interconnector CMU |
Storage Facility | No |
De-Rated Capacity | 272.16 |
Name of Applicant | GREENLINK INTERCONNECTOR LIMITED |
Primary Fuel Type | Interconnector |
Registered Holder | GREENLINK INTERCONNECTOR LIMITED |
Annual Penalty Cap |
null |
Monthly Penalty Cap |
null |
Proven DSR Capacity |
null |
DSR Bidding Capacity |
null |
Amount of Credit Cover | (empty) |
Termination Fee 1 Rate |
null |
Termination Fee 2 Rate |
null |
Termination Fee 3 Rate |
null |
Termination Fee 4 Rate |
null |
Termination Fee 5 Rate |
null |
Connection / DSR Capacity | 504 |
Maximum Obligation Period | 1 |
Capacity Agreement Awarded | Yes |
Pre-Qualification Decision | Prequalified |
Capacity obligation Summary |
null |
Pre-Refurbishing CMU Status |
null |
Transmission / Distribution | Transmission |
Unique Agreement Identifier |
null |
New Build Yet to Satisfy FCM |
null |
Planning Consents Conditions |
null |
Anticipated De-Rated Capacity | 272.16 |
Term of the Capacity Agreement |
null |
Nature of the Security Interest |
null |
CMU confirmed entry into Auction | Yes |
Is Connection Agreement required |
null |
Pre-Refurbishment Bidding Status |
null |
Secondary Trading Contact - Email | [email protected] |
Date for provision of deferred TEC |
null |
Pre-Refurbishing De-Rated Capacity |
null |
Date of Issue of Capacity Agreement |
null |
List of Traded Capacity Obligations |
null |
Post-Refurbishing De-Rated Capacity |
null |
Auction Acquired Capacity Obligation |
null |
Date of Issue of DSR Test Certificate |
null |
Has Capacity Agreement been Suspended |
null |
Period for which the transfer applies |
null |
Secondary Trading Contact - Telephone | '+3530214742338 |
Capacity Agreement has been Terminated |
null |
Duration of Capacity Agreement Awarded | 1 |
Date for Financial Commitment Milestone |
null |
Delivery Years for which Agreement Valid |
null |
Connection Agreement Deferral Declaration |
null |
Date of Termination of Capacity Agreement |
null |
Latest Date SCM is expected to be achieved |
null |
Subject to Substantial Completion Milestone |
null |
Subject to a Minimum Completion Requirement |
null |
Earliest Date SCM is expected to be achieved |
null |
Is copy of Grid Connection Agreement required |
null |
Anticipated Pre-Refurbishing De-Rated Capacity |
null |
Anticipated Post-Refurbishing De-Rated Capacity |
null |
Legal Name of any Person with a Security Interest |
null |
Date for provision of deferred Connection Agreement |
null |
Duration of Capacity Agreement in First Bidding Round | 1 |
Long-Stop Date for the Minimum Completion Requirement |
null |