Chesham Avenue, Lancashire, Rochdale, OL11 Map

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) N/A
  • De-Rated Capacity (CMU Registry) 8.23
  • Connection Capacity (CMU Registry) 10.30 MW
  • Anticipated Capacity (CMU Registry) 6.87 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name LEVELISE LIMITED
  • Parent Company (CMU Registry) N/A
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +441865334227

Basic Information

Basic Information
  • Location Chesham Avenue, Lancashire, Rochdale, OL11
  • Description Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
  • Company LEVELISE LIMITED

Technical Details

Technical Details
  • Technology DSR
  • Generation Type N/A
  • Connection Type N/A
  • De-Rated Capacity N/A
  • Connection / DSR Capacity N/A
  • Type T-1

Auction Information

Auction Information
  • Auction 2025-26 (T-1) One Year Ahead Capacity Auction
  • Delivery Year 2,025
  • Status N/A
  • Clearing Price N/A

Additional Information

Additional Information
  • CMU ID LEVC01
  • Location and Post Code Chesham Avenue, Lancashire, Rochdale, OL11
  • Description of CMU Components Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
  • Generating Technology Class DSR
  • Company Name LEVELISE LIMITED
  • Auction Name 2025-26 (T-1) One Year Ahead Capacity Auction
  • _id 531,213
  • rank 0.06
  • Component ID A04-F1A0
  • OS Grid Reference N/A
  • Primary Fuel of Component N/A
  • Permitted on-Site Generating Unit N/A
  • Pre-Refurbishing De-Rated Capacity N/A
  • Post-Refurbishing De-Rated Capacity N/A
  • Generating Capacity of on-site Generating Unit N/A

CMU Registry Data

CMU Registry Data
  • Auction Capacity Auction
  • Type T-1
  • Delivery Year 2,025
  • Name of Applicant LEVELISE LIMITED
  • CM Unit Name LEVC01

Field Value
_id 531213
Type T-1
rank 0.0573088
CMU ID LEVC01
Auction Name 2025-26 (T-1) One Year Ahead Capacity Auction
Component ID A04-F1A0
Delivery Year 2025
De-Rated Capacity
null
OS Grid Reference
null
Location and Post Code Chesham Avenue, Lancashire, Rochdale, OL11
Connection / DSR Capacity
null
Primary Fuel of Component
null
Generating Technology Class DSR
Description of CMU Components Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity
null
Post-Refurbishing De-Rated Capacity
null
Generating Capacity of on-site Generating Unit
null

Field Value
_id 12128
Type T-1
CMU ID LEVC01
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2025-26 (T-1) One Year Ahead Capacity Auction
CM Unit Name LEVC01
CM Unit Type Non CMRS
TEC Deferral
null
Unproven DSR Yes
Delivery Year 2025
Opt Out Status Opt-In
Opt-Out Reason
null
Parent Company
null
DSR Test Method
null
Is FCM required
null
CM Unit Category Unproven DSR CMU
Storage Facility No
De-Rated Capacity 8.231
Name of Applicant LEVELISE LIMITED
Primary Fuel Type Storage - Battery
Registered Holder LEVELISE LIMITED
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity
null
DSR Bidding Capacity 6
Amount of Credit Cover 30000
Termination Fee 1 Rate £5000.00 /MW
Termination Fee 2 Rate £25000.00 /MW
Termination Fee 3 Rate £10000.00 /MW
Termination Fee 4 Rate £15000.00 /MW
Termination Fee 5 Rate £35000.00 /MW
Connection / DSR Capacity 10.305
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary
null
Pre-Refurbishing CMU Status
null
Transmission / Distribution Distribution
Unique Agreement Identifier CAN-2025-LEVC01-001
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity 6.87
Term of the Capacity Agreement 1
Nature of the Security Interest
null
CMU confirmed entry into Auction Yes
Is Connection Agreement required
null
Pre-Refurbishment Bidding Status
null
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity
null
Date of Issue of Capacity Agreement 2025-03-31
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity
null
Auction Acquired Capacity Obligation 6
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone '+441865334227
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid 2025/2026
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
null
Anticipated Pre-Refurbishing De-Rated Capacity
null
Anticipated Post-Refurbishing De-Rated Capacity
null
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement
null