Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.
Field | Value |
---|---|
_id | 531873 |
Type | T-1 |
rank | 0.0573088 |
CMU ID | LEVC01 |
Auction Name | 2025-26 (T-1) One Year Ahead Capacity Auction |
Component ID | A23-56E0 |
Delivery Year | 2025 |
De-Rated Capacity |
null |
OS Grid Reference |
null |
Location and Post Code | Claremont Crescent, Morecambe, LA4 |
Connection / DSR Capacity |
null |
Primary Fuel of Component |
null |
Generating Technology Class | DSR |
Description of CMU Components | Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit. |
Permitted on-Site Generating Unit |
null |
Pre-Refurbishing De-Rated Capacity |
null |
Post-Refurbishing De-Rated Capacity |
null |
Generating Capacity of on-site Generating Unit |
null |
Field | Value |
---|---|
_id | 12128 |
Type | T-1 |
CMU ID | LEVC01 |
Auction | Capacity Auction |
Agent Name |
null |
Beta Value |
null |
Auction Name | 2025-26 (T-1) One Year Ahead Capacity Auction |
CM Unit Name | LEVC01 |
CM Unit Type | Non CMRS |
TEC Deferral |
null |
Unproven DSR | Yes |
Delivery Year | 2025 |
Opt Out Status | Opt-In |
Opt-Out Reason |
null |
Parent Company |
null |
DSR Test Method |
null |
Is FCM required |
null |
CM Unit Category | Unproven DSR CMU |
Storage Facility | No |
De-Rated Capacity | 8.231 |
Name of Applicant | LEVELISE LIMITED |
Primary Fuel Type | Storage - Battery |
Registered Holder | LEVELISE LIMITED |
Annual Penalty Cap | 1 |
Monthly Penalty Cap | 2 |
Proven DSR Capacity |
null |
DSR Bidding Capacity | 6 |
Amount of Credit Cover | 30000 |
Termination Fee 1 Rate | £5000.00 /MW |
Termination Fee 2 Rate | £25000.00 /MW |
Termination Fee 3 Rate | £10000.00 /MW |
Termination Fee 4 Rate | £15000.00 /MW |
Termination Fee 5 Rate | £35000.00 /MW |
Connection / DSR Capacity | 10.305 |
Maximum Obligation Period | 1 |
Capacity Agreement Awarded | Yes |
Pre-Qualification Decision | Prequalified |
Capacity obligation Summary |
null |
Pre-Refurbishing CMU Status |
null |
Transmission / Distribution | Distribution |
Unique Agreement Identifier | CAN-2025-LEVC01-001 |
New Build Yet to Satisfy FCM |
null |
Planning Consents Conditions |
null |
Anticipated De-Rated Capacity | 6.87 |
Term of the Capacity Agreement | 1 |
Nature of the Security Interest |
null |
CMU confirmed entry into Auction | Yes |
Is Connection Agreement required |
null |
Pre-Refurbishment Bidding Status |
null |
Secondary Trading Contact - Email | [email protected] |
Date for provision of deferred TEC |
null |
Pre-Refurbishing De-Rated Capacity |
null |
Date of Issue of Capacity Agreement | 2025-03-31 |
List of Traded Capacity Obligations |
null |
Post-Refurbishing De-Rated Capacity |
null |
Auction Acquired Capacity Obligation | 6 |
Date of Issue of DSR Test Certificate |
null |
Has Capacity Agreement been Suspended |
null |
Period for which the transfer applies |
null |
Secondary Trading Contact - Telephone | '+441865334227 |
Capacity Agreement has been Terminated |
null |
Duration of Capacity Agreement Awarded | 1 |
Date for Financial Commitment Milestone |
null |
Delivery Years for which Agreement Valid | 2025/2026 |
Connection Agreement Deferral Declaration |
null |
Date of Termination of Capacity Agreement |
null |
Latest Date SCM is expected to be achieved |
null |
Subject to Substantial Completion Milestone |
null |
Subject to a Minimum Completion Requirement |
null |
Earliest Date SCM is expected to be achieved |
null |
Is copy of Grid Connection Agreement required |
null |
Anticipated Pre-Refurbishing De-Rated Capacity |
null |
Anticipated Post-Refurbishing De-Rated Capacity |
null |
Legal Name of any Person with a Security Interest |
null |
Date for provision of deferred Connection Agreement |
null |
Duration of Capacity Agreement in First Bidding Round | 1 |
Long-Stop Date for the Minimum Completion Requirement |
null |