Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.
Field | Value |
---|---|
_id | 566746 |
Type | T-1 |
rank | 0.0573088 |
CMU ID | CULV04 |
Auction Name | 2018-19 (T-1) One Year Ahead Capacity Auction |
Component ID | NGSTORCLVR189 |
Delivery Year | 2018 |
De-Rated Capacity |
null |
OS Grid Reference | SJ 323 680 |
Location and Post Code | Chemistry Lane, Interlinq Trade Park, Queensfery, Flintshire, CH5 2DW |
Connection / DSR Capacity |
null |
Primary Fuel of Component |
null |
Generating Technology Class | OCGT and Reciprocating Engines (Fuel Type - Gas) |
Description of CMU Components | 14 MW power plant comprising of 7 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network. The site is currently going through commissioning activities and only has metered data for 2MW, therefore the company is prequalifying 2MW of existing capacity. |
Permitted on-Site Generating Unit |
null |
Pre-Refurbishing De-Rated Capacity |
null |
Post-Refurbishing De-Rated Capacity |
null |
Generating Capacity of on-site Generating Unit |
null |
Field | Value |
---|---|
_id | 1046 |
Type | T-1 |
CMU ID | CULV04 |
Auction | Capacity Auction |
Agent Name |
null |
Beta Value |
null |
Auction Name | 2018-19 (T-1) One Year Ahead Capacity Auction |
CM Unit Name | Culvery Power |
CM Unit Type | Non CMRS |
TEC Deferral |
null |
Unproven DSR |
null |
Delivery Year | 2018 |
Opt Out Status | Opt-In |
Opt-Out Reason |
null |
Parent Company | THE FERN POWER COMPANY LIMITED |
DSR Test Method |
null |
Is FCM required |
null |
CM Unit Category | Existing Generating CMU |
Storage Facility | No |
De-Rated Capacity | 1.813 |
Name of Applicant | CULVERY POWER LIMITED |
Primary Fuel Type | Gas |
Registered Holder |
null |
Annual Penalty Cap |
null |
Monthly Penalty Cap |
null |
Proven DSR Capacity |
null |
DSR Bidding Capacity |
null |
Amount of Credit Cover | (empty) |
Termination Fee 1 Rate |
null |
Termination Fee 2 Rate |
null |
Termination Fee 3 Rate |
null |
Termination Fee 4 Rate |
null |
Termination Fee 5 Rate |
null |
Connection / DSR Capacity | 1.912 |
Maximum Obligation Period | 1 |
Capacity Agreement Awarded | No |
Pre-Qualification Decision | Prequalified |
Capacity obligation Summary |
null |
Pre-Refurbishing CMU Status |
null |
Transmission / Distribution | Distribution |
Unique Agreement Identifier |
null |
New Build Yet to Satisfy FCM |
null |
Planning Consents Conditions |
null |
Anticipated De-Rated Capacity | 1.813 |
Term of the Capacity Agreement |
null |
Nature of the Security Interest |
null |
CMU confirmed entry into Auction | Yes |
Is Connection Agreement required |
null |
Pre-Refurbishment Bidding Status |
null |
Secondary Trading Contact - Email | [email protected] |
Date for provision of deferred TEC |
null |
Pre-Refurbishing De-Rated Capacity |
null |
Date of Issue of Capacity Agreement |
null |
List of Traded Capacity Obligations |
null |
Post-Refurbishing De-Rated Capacity |
null |
Auction Acquired Capacity Obligation |
null |
Date of Issue of DSR Test Certificate |
null |
Has Capacity Agreement been Suspended |
null |
Period for which the transfer applies |
null |
Secondary Trading Contact - Telephone | '+4402920547200 |
Capacity Agreement has been Terminated |
null |
Duration of Capacity Agreement Awarded |
null |
Date for Financial Commitment Milestone |
null |
Delivery Years for which Agreement Valid |
null |
Connection Agreement Deferral Declaration |
null |
Date of Termination of Capacity Agreement |
null |
Latest Date SCM is expected to be achieved |
null |
Subject to Substantial Completion Milestone |
null |
Subject to a Minimum Completion Requirement |
null |
Earliest Date SCM is expected to be achieved |
null |
Is copy of Grid Connection Agreement required |
null |
Anticipated Pre-Refurbishing De-Rated Capacity |
null |
Anticipated Post-Refurbishing De-Rated Capacity |
null |
Legal Name of any Person with a Security Interest |
null |
Date for provision of deferred Connection Agreement |
null |
Duration of Capacity Agreement in First Bidding Round |
null |
Long-Stop Date for the Minimum Completion Requirement |
null |