Land to the south of centenary way, Sutton Bridge, PE12 9TF Map

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) 2.73 MW
  • De-Rated Capacity (CMU Registry) 2.73
  • Connection Capacity (CMU Registry) 49.90 MW
  • Anticipated Capacity (CMU Registry) 2.73 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name BEECHGREEN ENERGYFARM LIMITED
  • Parent Company (CMU Registry) EDF Energy Renewables Ltd
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +4402081861004

Basic Information

Basic Information
  • Location Land to the south of centenary way, Sutton Bridge, PE12 9TF
  • Description Sutton Bridge MPAN ID: 1170001824960 CMU is a photovoltaic system connected to the transmission system.
  • Company BEECHGREEN ENERGYFARM LIMITED

Technical Details

Technical Details
  • Technology Solar Photovoltaic
  • Generation Type N/A
  • Connection Type N/A
  • De-Rated Capacity 2.73
  • Connection / DSR Capacity 49.90
  • Type T-1

Auction Information

Auction Information
  • Auction 2025-26 (T-1) One Year Ahead Capacity Auction
  • Delivery Year 2,025
  • Status N/A
  • Clearing Price N/A

Additional Information

Additional Information
  • CMU ID SUTB24
  • Location and Post Code Land to the south of centenary way, Sutton Bridge, PE12 9TF
  • Description of CMU Components Sutton Bridge MPAN ID: 1170001824960 CMU is a photovoltaic system connected to the transmission system.
  • Generating Technology Class Solar Photovoltaic
  • Company Name BEECHGREEN ENERGYFARM LIMITED
  • Auction Name 2025-26 (T-1) One Year Ahead Capacity Auction
  • _id 534,669
  • rank 0.07
  • Component ID SUTB24
  • OS Grid Reference TF 483 197
  • Primary Fuel of Component Solar
  • Permitted on-Site Generating Unit N/A
  • Pre-Refurbishing De-Rated Capacity N/A
  • Post-Refurbishing De-Rated Capacity N/A
  • Generating Capacity of on-site Generating Unit N/A

CMU Registry Data

CMU Registry Data
  • Auction Capacity Auction
  • Type T-1
  • Delivery Year 2,025
  • Name of Applicant BEECHGREEN ENERGYFARM LIMITED
  • CM Unit Name Sutton Bridge

Field Value
_id 534669
Type T-1
rank 0.0706241
CMU ID SUTB24
Auction Name 2025-26 (T-1) One Year Ahead Capacity Auction
Component ID SUTB24
Delivery Year 2025
De-Rated Capacity 2.73
OS Grid Reference TF 483 197
Location and Post Code Land to the south of centenary way, Sutton Bridge, PE12 9TF
Connection / DSR Capacity 49.9
Primary Fuel of Component Solar
Generating Technology Class Solar Photovoltaic
Description of CMU Components Sutton Bridge MPAN ID: 1170001824960 CMU is a photovoltaic system connected to the transmission system.
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity
null
Post-Refurbishing De-Rated Capacity
null
Generating Capacity of on-site Generating Unit
null

Field Value
_id 12269
Type T-1
CMU ID SUTB24
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2025-26 (T-1) One Year Ahead Capacity Auction
CM Unit Name Sutton Bridge
CM Unit Type CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2025
Opt Out Status Opt-In
Opt-Out Reason
null
Parent Company EDF Energy Renewables Ltd
DSR Test Method
null
Is FCM required
null
CM Unit Category Existing Generating CMU
Storage Facility No
De-Rated Capacity 2.73
Name of Applicant BEECHGREEN ENERGYFARM LIMITED
Primary Fuel Type Solar
Registered Holder BEECHGREEN ENERGYFARM LIMITED
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover
null
Termination Fee 1 Rate £5000.00 /MW
Termination Fee 2 Rate £25000.00 /MW
Termination Fee 3 Rate £10000.00 /MW
Termination Fee 4 Rate £15000.00 /MW
Termination Fee 5 Rate £35000.00 /MW
Connection / DSR Capacity 49.9
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary
null
Pre-Refurbishing CMU Status
null
Transmission / Distribution Transmission
Unique Agreement Identifier CAN-2025-SUTB24-001
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity 2.73
Term of the Capacity Agreement 1
Nature of the Security Interest
null
CMU confirmed entry into Auction Yes
Is Connection Agreement required
null
Pre-Refurbishment Bidding Status
null
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity
null
Date of Issue of Capacity Agreement 2025-03-31
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity
null
Auction Acquired Capacity Obligation 2.73
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone '+4402081861004
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid 2025/2026
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
null
Anticipated Pre-Refurbishing De-Rated Capacity
null
Anticipated Post-Refurbishing De-Rated Capacity
null
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement
null