Strathallan Wind Farm Land at Greenscares Plantation Langside Road Braco Perth FK15 9LN Map

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) 0.53 MW
  • De-Rated Capacity (CMU Registry) 0.53
  • Connection Capacity (CMU Registry) 8 MW
  • Anticipated Capacity (CMU Registry) 0.53 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name ZEPHYRUS GREEN ENERGY LTD
  • Parent Company (CMU Registry) N/A
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +4401899309100

Basic Information

Basic Information
  • Location Strathallan Wind Farm Land at Greenscares Plantation Langside Road Braco Perth FK15 9LN
  • Description 4x Enercon E70 E4 / 2300kW - curtailed to meet the grid connection export agreement of 8.000 MW.
  • Company ZEPHYRUS GREEN ENERGY LTD

Technical Details

Technical Details
  • Technology Onshore Wind
  • Generation Type N/A
  • Connection Type N/A
  • De-Rated Capacity 0.53
  • Connection / DSR Capacity 8
  • Type T-4

Auction Information

Auction Information
  • Auction 2028-29 (T-4) Four Year Ahead Capacity Auction
  • Delivery Year 2,028
  • Status N/A
  • Clearing Price N/A

Additional Information

Additional Information
  • CMU ID Strath
  • Location and Post Code Strathallan Wind Farm Land at Greenscares Plantation Langside Road Braco Perth FK15 9LN
  • Description of CMU Components 4x Enercon E70 E4 / 2300kW - curtailed to meet the grid connection export agreement of 8.000 MW.
  • Generating Technology Class Onshore Wind
  • Company Name ZEPHYRUS GREEN ENERGY LTD
  • Auction Name 2028-29 (T-4) Four Year Ahead Capacity Auction
  • _id 534,854
  • rank 0.06
  • Component ID StrathCOMPID
  • OS Grid Reference NN 819 133
  • Primary Fuel of Component Onshore Wind
  • Permitted on-Site Generating Unit N/A
  • Pre-Refurbishing De-Rated Capacity N/A
  • Post-Refurbishing De-Rated Capacity N/A
  • Generating Capacity of on-site Generating Unit N/A

CMU Registry Data

CMU Registry Data
  • Auction Capacity Auction
  • Type T-4
  • Delivery Year 2,028
  • Name of Applicant ZEPHYRUS GREEN ENERGY LTD
  • CM Unit Name Strathallan Wind Farm

Field Value
_id 534854
Type T-4
rank 0.0573088
CMU ID Strath
Auction Name 2028-29 (T-4) Four Year Ahead Capacity Auction
Component ID StrathCOMPID
Delivery Year 2028
De-Rated Capacity 0.531
OS Grid Reference NN 819 133
Location and Post Code Strathallan Wind Farm Land at Greenscares Plantation Langside Road Braco Perth FK15 9LN
Connection / DSR Capacity 8
Primary Fuel of Component Onshore Wind
Generating Technology Class Onshore Wind
Description of CMU Components 4x Enercon E70 E4 / 2300kW - curtailed to meet the grid connection export agreement of 8.000 MW.
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity
null
Post-Refurbishing De-Rated Capacity
null
Generating Capacity of on-site Generating Unit
null

Field Value
_id 15919
Type T-4
CMU ID Strath
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2028-29 (T-4) Four Year Ahead Capacity Auction
CM Unit Name Strathallan Wind Farm
CM Unit Type Non CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2028
Opt Out Status Opt-In
Opt-Out Reason
null
Parent Company
null
DSR Test Method
null
Is FCM required
null
CM Unit Category Existing Generating CMU
Storage Facility No
De-Rated Capacity 0.531
Name of Applicant ZEPHYRUS GREEN ENERGY LTD
Primary Fuel Type Onshore Wind
Registered Holder ZEPHYRUS GREEN ENERGY LTD
Annual Penalty Cap
null
Monthly Penalty Cap
null
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover
null
Termination Fee 1 Rate
null
Termination Fee 2 Rate
null
Termination Fee 3 Rate
null
Termination Fee 4 Rate
null
Termination Fee 5 Rate
null
Connection / DSR Capacity 8
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary
null
Pre-Refurbishing CMU Status
null
Transmission / Distribution Distribution
Unique Agreement Identifier
null
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity 0.531
Term of the Capacity Agreement
null
Nature of the Security Interest
null
CMU confirmed entry into Auction Yes
Is Connection Agreement required
null
Pre-Refurbishment Bidding Status
null
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity
null
Date of Issue of Capacity Agreement
null
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity
null
Auction Acquired Capacity Obligation
null
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone '+4401899309100
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid
null
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
null
Anticipated Pre-Refurbishing De-Rated Capacity
null
Anticipated Post-Refurbishing De-Rated Capacity
null
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement
null