Deeside Power Station Weighbridge Road Zone 4, Deeside Industrial Park Deeside Flintshire CH5 2UL Map

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) N/A
  • De-Rated Capacity (CMU Registry) 0
  • Connection Capacity (CMU Registry) N/A
  • Anticipated Capacity (CMU Registry) N/A

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name DEESIDE POWER (UK) LIMITED
  • Parent Company (CMU Registry) SCCL Holdings Limited
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +4401482895514

Basic Information

Basic Information
  • Location Deeside Power Station Weighbridge Road Zone 4, Deeside Industrial Park Deeside Flintshire CH5 2UL
  • Description Deeside CCGT Power Station.
  • Company DEESIDE POWER (UK) LIMITED

Technical Details

Technical Details
  • Technology Combined Cycle Gas Turbine (CCGT)
  • Generation Type N/A
  • Connection Type N/A
  • De-Rated Capacity N/A
  • Connection / DSR Capacity N/A
  • Type T-1

Auction Information

Auction Information
  • Auction 2018-19 (T-1) One Year Ahead Capacity Auction
  • Delivery Year 2,018
  • Status N/A
  • Clearing Price N/A

Additional Information

Additional Information
  • CMU ID DE_171
  • Location and Post Code Deeside Power Station Weighbridge Road Zone 4, Deeside Industrial Park Deeside Flintshire CH5 2UL
  • Description of CMU Components Deeside CCGT Power Station.
  • Generating Technology Class Combined Cycle Gas Turbine (CCGT)
  • Company Name DEESIDE POWER (UK) LIMITED
  • Auction Name 2018-19 (T-1) One Year Ahead Capacity Auction
  • _id 567,236
  • rank 0.09
  • Component ID T_DEEP-1
  • OS Grid Reference SJ 297 712
  • Primary Fuel of Component N/A
  • Permitted on-Site Generating Unit N/A
  • Pre-Refurbishing De-Rated Capacity N/A
  • Post-Refurbishing De-Rated Capacity N/A
  • Generating Capacity of on-site Generating Unit N/A

CMU Registry Data

CMU Registry Data
  • Auction Capacity Auction
  • Type T-1
  • Delivery Year 2,018
  • Name of Applicant DEESIDE POWER (UK) LIMITED
  • CM Unit Name Deeside

Field Value
_id 567236
Type T-1
rank 0.0901673
CMU ID DE_171
Auction Name 2018-19 (T-1) One Year Ahead Capacity Auction
Component ID T_DEEP-1
Delivery Year 2018
De-Rated Capacity
null
OS Grid Reference SJ 297 712
Location and Post Code Deeside Power Station Weighbridge Road Zone 4, Deeside Industrial Park Deeside Flintshire CH5 2UL
Connection / DSR Capacity
null
Primary Fuel of Component
null
Generating Technology Class Combined Cycle Gas Turbine (CCGT)
Description of CMU Components Deeside CCGT Power Station.
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity
null
Post-Refurbishing De-Rated Capacity
null
Generating Capacity of on-site Generating Unit
null

Field Value
_id 1055
Type T-1
CMU ID DE_171
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2018-19 (T-1) One Year Ahead Capacity Auction
CM Unit Name Deeside
CM Unit Type CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2018
Opt Out Status Opt-Out
Opt-Out Reason Closed down, decommissioned or otherwise non-operational by the start of the relevant Delivery Year
Parent Company SCCL Holdings Limited
DSR Test Method
null
Is FCM required
null
CM Unit Category Existing Generating CMU
Storage Facility No
De-Rated Capacity (empty)
Name of Applicant DEESIDE POWER (UK) LIMITED
Primary Fuel Type
null
Registered Holder
null
Annual Penalty Cap
null
Monthly Penalty Cap
null
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover (empty)
Termination Fee 1 Rate
null
Termination Fee 2 Rate
null
Termination Fee 3 Rate
null
Termination Fee 4 Rate
null
Termination Fee 5 Rate
null
Connection / DSR Capacity
null
Maximum Obligation Period
null
Capacity Agreement Awarded
null
Pre-Qualification Decision
null
Capacity obligation Summary
null
Pre-Refurbishing CMU Status
null
Transmission / Distribution Transmission
Unique Agreement Identifier
null
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity
null
Term of the Capacity Agreement
null
Nature of the Security Interest
null
CMU confirmed entry into Auction
null
Is Connection Agreement required
null
Pre-Refurbishment Bidding Status
null
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity
null
Date of Issue of Capacity Agreement
null
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity
null
Auction Acquired Capacity Obligation
null
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone '+4401482895514
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded
null
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid
null
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
null
Anticipated Pre-Refurbishing De-Rated Capacity
null
Anticipated Post-Refurbishing De-Rated Capacity
null
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round
null
Long-Stop Date for the Minimum Completion Requirement
null