Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.
Field | Value |
---|---|
_id | 282312 |
Type | T-4 |
rank | 0.0573088 |
CMU ID | TIL101 |
Auction Name | 2025-26 (T-4) Four Year Ahead Capacity Auction |
Component ID | TIL777 |
Delivery Year | 2025 |
De-Rated Capacity |
null |
OS Grid Reference | SK 705 836 |
Location and Post Code | Tiln Farm, Tiln Lane, Retford, Nottinghamshire, DN22 9JH |
Connection / DSR Capacity |
null |
Primary Fuel of Component |
null |
Generating Technology Class | Storage (Duration 1h) |
Description of CMU Components | A 25MW/25MWh Storage: minimum 1.0 hour duration battery facility which will share a future connection agreement with a future solar farm but electrically separate with its own independent Import and Export metering system to the required BSC standards. The battery facility is to share the connection capacity with the future solar farm under a Grid Sharing Agreement (in essence private wire network). |
Permitted on-Site Generating Unit |
null |
Pre-Refurbishing De-Rated Capacity |
null |
Post-Refurbishing De-Rated Capacity |
null |
Generating Capacity of on-site Generating Unit |
null |
Field | Value |
---|---|
_id | 13170 |
Type | T-4 |
CMU ID | TIL101 |
Auction | Capacity Auction |
Agent Name |
null |
Beta Value |
null |
Auction Name | 2025-26 (T-4) Four Year Ahead Capacity Auction |
CM Unit Name | Tiln Storage Facility |
CM Unit Type | Non CMRS |
TEC Deferral |
null |
Unproven DSR |
null |
Delivery Year | 2025 |
Opt Out Status | Opt-In |
Opt-Out Reason |
null |
Parent Company | Lightsource SPV 154 Limited |
DSR Test Method |
null |
Is FCM required |
null |
CM Unit Category | New Build Generating CMU |
Storage Facility | Yes |
De-Rated Capacity | 4.99 |
Name of Applicant | TILN CONNECTIONS LTD |
Primary Fuel Type | Storage - Battery |
Registered Holder |
null |
Annual Penalty Cap |
null |
Monthly Penalty Cap |
null |
Proven DSR Capacity |
null |
DSR Bidding Capacity |
null |
Amount of Credit Cover | (empty) |
Termination Fee 1 Rate |
null |
Termination Fee 2 Rate |
null |
Termination Fee 3 Rate |
null |
Termination Fee 4 Rate |
null |
Termination Fee 5 Rate |
null |
Connection / DSR Capacity | 25 |
Maximum Obligation Period | 15 |
Capacity Agreement Awarded |
null |
Pre-Qualification Decision | Prequalified |
Capacity obligation Summary |
null |
Pre-Refurbishing CMU Status |
null |
Transmission / Distribution | Distribution |
Unique Agreement Identifier |
null |
New Build Yet to Satisfy FCM | Yes |
Planning Consents Conditions |
null |
Anticipated De-Rated Capacity | 9.978 |
Term of the Capacity Agreement |
null |
Nature of the Security Interest |
null |
CMU confirmed entry into Auction | No |
Is Connection Agreement required |
null |
Pre-Refurbishment Bidding Status |
null |
Secondary Trading Contact - Email | [email protected] |
Date for provision of deferred TEC |
null |
Pre-Refurbishing De-Rated Capacity |
null |
Date of Issue of Capacity Agreement |
null |
List of Traded Capacity Obligations |
null |
Post-Refurbishing De-Rated Capacity |
null |
Auction Acquired Capacity Obligation |
null |
Date of Issue of DSR Test Certificate |
null |
Has Capacity Agreement been Suspended |
null |
Period for which the transfer applies |
null |
Secondary Trading Contact - Telephone | '+447780498421 |
Capacity Agreement has been Terminated |
null |
Duration of Capacity Agreement Awarded |
null |
Date for Financial Commitment Milestone |
null |
Delivery Years for which Agreement Valid |
null |
Connection Agreement Deferral Declaration |
null |
Date of Termination of Capacity Agreement |
null |
Latest Date SCM is expected to be achieved |
null |
Subject to Substantial Completion Milestone |
null |
Subject to a Minimum Completion Requirement |
null |
Earliest Date SCM is expected to be achieved |
null |
Is copy of Grid Connection Agreement required |
null |
Anticipated Pre-Refurbishing De-Rated Capacity |
null |
Anticipated Post-Refurbishing De-Rated Capacity |
null |
Legal Name of any Person with a Security Interest |
null |
Date for provision of deferred Connection Agreement |
null |
Duration of Capacity Agreement in First Bidding Round |
null |
Long-Stop Date for the Minimum Completion Requirement |
null |