Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.
Field | Value |
---|---|
_id | 184985 |
Type | T-4 |
rank | 0.0706241 |
CMU ID | SEL127 |
Auction Name | 2026-27 (T-4) Four Year Ahead Capacity Auction |
Component ID | SEL127 |
Delivery Year | 2026 |
De-Rated Capacity | 35.445 |
OS Grid Reference | TQ 664 769 |
Location and Post Code | land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. |
Connection / DSR Capacity | 150 |
Primary Fuel of Component |
null |
Generating Technology Class | Storage (Duration 2h) |
Description of CMU Components | Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules. |
Permitted on-Site Generating Unit |
null |
Pre-Refurbishing De-Rated Capacity |
null |
Post-Refurbishing De-Rated Capacity |
null |
Generating Capacity of on-site Generating Unit |
null |
Field | Value |
---|---|
_id | 13983 |
Type | T-4 |
CMU ID | SEL127 |
Auction | Capacity Auction |
Agent Name |
null |
Beta Value |
null |
Auction Name | 2026-27 (T-4) Four Year Ahead Capacity Auction |
CM Unit Name | Thurrock Power Limited |
CM Unit Type | CMRS |
TEC Deferral |
null |
Unproven DSR |
null |
Delivery Year | 2026 |
Opt Out Status | Opt-In |
Opt-Out Reason |
null |
Parent Company | Statera Energy Limited |
DSR Test Method |
null |
Is FCM required |
null |
CM Unit Category | New Build Generating CMU |
Storage Facility | Yes |
De-Rated Capacity | 35.445 |
Name of Applicant | THURROCK STORAGE LIMITED |
Primary Fuel Type | Storage - Battery |
Registered Holder | THURROCK STORAGE LIMITED |
Annual Penalty Cap | 1 |
Monthly Penalty Cap | 2 |
Proven DSR Capacity |
null |
DSR Bidding Capacity |
null |
Amount of Credit Cover | (empty) |
Termination Fee 1 Rate | £5000.00 /MW |
Termination Fee 2 Rate | £25000.00 /MW |
Termination Fee 3 Rate | £10000.00 /MW |
Termination Fee 4 Rate | £15000.00 /MW |
Termination Fee 5 Rate | £35000.00 /MW |
Connection / DSR Capacity | 150 |
Maximum Obligation Period | 15 |
Capacity Agreement Awarded | Yes |
Pre-Qualification Decision | Prequalified |
Capacity obligation Summary |
null |
Pre-Refurbishing CMU Status |
null |
Transmission / Distribution | Transmission |
Unique Agreement Identifier | CAN-2026-SEL127-001 |
New Build Yet to Satisfy FCM |
null |
Planning Consents Conditions |
null |
Anticipated De-Rated Capacity | 35.445 |
Term of the Capacity Agreement | 15 |
Nature of the Security Interest | 1.By charges and assignments contained in a debenture dated 20 November 2023 and made between the Registered Holder and the Security Interest Beneficiary (the "Debenture"), the Registered Holder charged or otherwise secured in favour of the Security Interest Beneficiary, among other things: (a) by way of assignment, all of its present and future righ |
CMU confirmed entry into Auction | Yes |
Is Connection Agreement required |
null |
Pre-Refurbishment Bidding Status |
null |
Secondary Trading Contact - Email | [email protected] |
Date for provision of deferred TEC |
null |
Pre-Refurbishing De-Rated Capacity |
null |
Date of Issue of Capacity Agreement | 2023-03-31 |
List of Traded Capacity Obligations |
null |
Post-Refurbishing De-Rated Capacity |
null |
Auction Acquired Capacity Obligation | 35.445 |
Date of Issue of DSR Test Certificate |
null |
Has Capacity Agreement been Suspended |
null |
Period for which the transfer applies |
null |
Secondary Trading Contact - Telephone | '+4402071860586 |
Capacity Agreement has been Terminated |
null |
Duration of Capacity Agreement Awarded | 15 |
Date for Financial Commitment Milestone |
null |
Delivery Years for which Agreement Valid | 2026/2027, 2027/2028, 2028/2029, 2029/2030, 2030/2031, 2031/2032, 2032/2033, 2033/2034, 2034/2035, 2035/2036, 2036/2037, 2037/2038, 2038/2039, 2039/2040, 2040/2041 |
Connection Agreement Deferral Declaration |
null |
Date of Termination of Capacity Agreement |
null |
Latest Date SCM is expected to be achieved | 2026-09-30 |
Subject to Substantial Completion Milestone | Yes |
Subject to a Minimum Completion Requirement | Yes |
Earliest Date SCM is expected to be achieved | 2024-03-31 |
Is copy of Grid Connection Agreement required |
null |
Anticipated Pre-Refurbishing De-Rated Capacity |
null |
Anticipated Post-Refurbishing De-Rated Capacity |
null |
Legal Name of any Person with a Security Interest | 1.National Westminster Bank plc |
Date for provision of deferred Connection Agreement |
null |
Duration of Capacity Agreement in First Bidding Round | 15 |
Long-Stop Date for the Minimum Completion Requirement | 2027-10-01 |