Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS Map

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) 61.71 MW
  • De-Rated Capacity (CMU Registry) 61.71
  • Connection Capacity (CMU Registry) 67.38 MW
  • Anticipated Capacity (CMU Registry) 62.04 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name Sembcorp Utilities (UK) Limited
  • Parent Company (CMU Registry) SEMBCORP ENERGY UK LIMITED
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +441642212665

Basic Information

Basic Information
  • Location Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS
  • Description (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT and Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
  • Company Sembcorp Utilities (UK) Limited

Technical Details

Technical Details
  • Technology Combined Heat and Power (CHP)
  • Generation Type N/A
  • Connection Type N/A
  • De-Rated Capacity 61.71
  • Connection / DSR Capacity 67.38
  • Type T-4

Auction Information

Auction Information
  • Auction 2027-28 (T-4) Four Year Ahead Capacity Auction
  • Delivery Year 2,027
  • Status N/A
  • Clearing Price N/A

Additional Information

Additional Information
  • CMU ID S27G1S
  • Location and Post Code Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS
  • Description of CMU Components (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT and Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
  • Generating Technology Class Combined Heat and Power (CHP)
  • Company Name Sembcorp Utilities (UK) Limited
  • Auction Name 2027-28 (T-4) Four Year Ahead Capacity Auction
  • _id 140,715
  • rank 0.06
  • Component ID T_WILCT-1
  • OS Grid Reference NZ 568 218
  • Primary Fuel of Component Gas
  • Permitted on-Site Generating Unit N/A
  • Pre-Refurbishing De-Rated Capacity N/A
  • Post-Refurbishing De-Rated Capacity N/A
  • Generating Capacity of on-site Generating Unit N/A

CMU Registry Data

CMU Registry Data
  • Auction Capacity Auction
  • Type T-4
  • Delivery Year 2,027
  • Name of Applicant Sembcorp Utilities (UK) Limited
  • CM Unit Name Sembcorp Wilton GT1 and ST11

Field Value
_id 140715
Type T-4
rank 0.0573088
CMU ID S27G1S
Auction Name 2027-28 (T-4) Four Year Ahead Capacity Auction
Component ID T_WILCT-1
Delivery Year 2027
De-Rated Capacity 61.709
OS Grid Reference NZ 568 218
Location and Post Code Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS
Connection / DSR Capacity 67.375
Primary Fuel of Component Gas
Generating Technology Class Combined Heat and Power (CHP)
Description of CMU Components (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT and Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity
null
Post-Refurbishing De-Rated Capacity
null
Generating Capacity of on-site Generating Unit
null

Field Value
_id 14812
Type T-4
CMU ID S27G1S
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2027-28 (T-4) Four Year Ahead Capacity Auction
CM Unit Name Sembcorp Wilton GT1 and ST11
CM Unit Type CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2027
Opt Out Status Opt-In
Opt-Out Reason
null
Parent Company SEMBCORP ENERGY UK LIMITED
DSR Test Method
null
Is FCM required
null
CM Unit Category Existing Generating CMU
Storage Facility No
De-Rated Capacity 61.709
Name of Applicant Sembcorp Utilities (UK) Limited
Primary Fuel Type Gas
Registered Holder Sembcorp Utilities (UK) Limited
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover (empty)
Termination Fee 1 Rate £5000.00 /MW
Termination Fee 2 Rate £25000.00 /MW
Termination Fee 3 Rate £10000.00 /MW
Termination Fee 4 Rate £15000.00 /MW
Termination Fee 5 Rate £35000.00 /MW
Connection / DSR Capacity 67.375
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary
null
Pre-Refurbishing CMU Status
null
Transmission / Distribution Transmission
Unique Agreement Identifier CAN-2027-S27G1S-001
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity 62.038
Term of the Capacity Agreement 1
Nature of the Security Interest
null
CMU confirmed entry into Auction Yes
Is Connection Agreement required
null
Pre-Refurbishment Bidding Status
null
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity
null
Date of Issue of Capacity Agreement 2024-04-08
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity
null
Auction Acquired Capacity Obligation 61.709
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone '+441642212665
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid 2027/2028
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
null
Anticipated Pre-Refurbishing De-Rated Capacity
null
Anticipated Post-Refurbishing De-Rated Capacity
null
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement
null