Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) N/A
  • De-Rated Capacity (CMU Registry) 13.78
  • Connection Capacity (CMU Registry) 14.60 MW
  • Anticipated Capacity (CMU Registry) 11.93 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name TRAFFORD GREEN HYDROGEN LIMITED
  • Parent Company (CMU Registry) Carlton Power Limited
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +4401642714570

Basic Information

Basic Information
  • Location 132 Manchester Road, Carrington, Trafford, Greater Manchester, England, M31 4AY,
  • Description Hydrogen Production plant consisting of three of 5.2MVA Electrolyser blocks with over 8hours of Hydrogen storage which each can flexible ramp up/down between 0% and 100% of load.
  • Company TRAFFORD GREEN HYDROGEN LIMITED

Technical Details

Technical Details
  • Technology DSR
  • Generation Type N/A
  • Connection Type N/A
  • De-Rated Capacity N/A
  • Connection / DSR Capacity N/A
  • Type T-4

Auction Information

Auction Information
  • Auction 2027-28 (T-4) Four Year Ahead Capacity Auction
  • Delivery Year 2,027
  • Status N/A
  • Clearing Price N/A

Additional Information

Additional Information
  • CMU ID TGH001
  • Location and Post Code 132 Manchester Road, Carrington, Trafford, Greater Manchester, England, M31 4AY,
  • Description of CMU Components Hydrogen Production plant consisting of three of 5.2MVA Electrolyser blocks with over 8hours of Hydrogen storage which each can flexible ramp up/down between 0% and 100% of load.
  • Generating Technology Class DSR
  • Company Name TRAFFORD GREEN HYDROGEN LIMITED
  • Auction Name 2027-28 (T-4) Four Year Ahead Capacity Auction
  • _id 282,812
  • rank 0.07
  • Component ID TGH001
  • OS Grid Reference SJ 727 931
  • Primary Fuel of Component N/A
  • Permitted on-Site Generating Unit N/A
  • Pre-Refurbishing De-Rated Capacity N/A
  • Post-Refurbishing De-Rated Capacity N/A
  • Generating Capacity of on-site Generating Unit N/A

CMU Registry Data

CMU Registry Data
  • Auction Capacity Auction
  • Type T-4
  • Delivery Year 2,027
  • Name of Applicant TRAFFORD GREEN HYDROGEN LIMITED
  • CM Unit Name Trafford Green Hydrogen Porduction Plant

Field Value
_id 282812
Type T-4
rank 0.0706241
CMU ID TGH001
Auction Name 2027-28 (T-4) Four Year Ahead Capacity Auction
Component ID TGH001
Delivery Year 2027
De-Rated Capacity
null
OS Grid Reference SJ 727 931
Location and Post Code 132 Manchester Road, Carrington, Trafford, Greater Manchester, England, M31 4AY,
Connection / DSR Capacity
null
Primary Fuel of Component
null
Generating Technology Class DSR
Description of CMU Components Hydrogen Production plant consisting of three of 5.2MVA Electrolyser blocks with over 8hours of Hydrogen storage which each can flexible ramp up/down between 0% and 100% of load.
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity
null
Post-Refurbishing De-Rated Capacity
null
Generating Capacity of on-site Generating Unit
null

Field Value
_id 14870
Type T-4
CMU ID TGH001
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2027-28 (T-4) Four Year Ahead Capacity Auction
CM Unit Name Trafford Green Hydrogen Porduction Plant
CM Unit Type Non CMRS
TEC Deferral
null
Unproven DSR Yes
Delivery Year 2027
Opt Out Status Opt-In
Opt-Out Reason
null
Parent Company Carlton Power Limited
DSR Test Method
null
Is FCM required
null
CM Unit Category Unproven DSR CMU
Storage Facility No
De-Rated Capacity 13.778
Name of Applicant TRAFFORD GREEN HYDROGEN LIMITED
Primary Fuel Type DSR
Registered Holder
null
Annual Penalty Cap
null
Monthly Penalty Cap
null
Proven DSR Capacity
null
DSR Bidding Capacity 13.778
Amount of Credit Cover (empty)
Termination Fee 1 Rate
null
Termination Fee 2 Rate
null
Termination Fee 3 Rate
null
Termination Fee 4 Rate
null
Termination Fee 5 Rate
null
Connection / DSR Capacity 14.6
Maximum Obligation Period 15
Capacity Agreement Awarded No
Pre-Qualification Decision Prequalified
Capacity obligation Summary
null
Pre-Refurbishing CMU Status
null
Transmission / Distribution Distribution
Unique Agreement Identifier
null
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity 11.932
Term of the Capacity Agreement
null
Nature of the Security Interest
null
CMU confirmed entry into Auction Yes
Is Connection Agreement required
null
Pre-Refurbishment Bidding Status
null
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity
null
Date of Issue of Capacity Agreement
null
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity
null
Auction Acquired Capacity Obligation
null
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone '+4401642714570
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded
null
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid
null
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
null
Anticipated Pre-Refurbishing De-Rated Capacity
null
Anticipated Post-Refurbishing De-Rated Capacity
null
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round 15
Long-Stop Date for the Minimum Completion Requirement
null