via entrance at 132 Manchester Road, Carrington, Manchester, M31 4AY Map

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) 28.51 MW
  • De-Rated Capacity (CMU Registry) 28.51
  • Connection Capacity (CMU Registry) 247.50 MW
  • Anticipated Capacity (CMU Registry) 28.51 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name CARLTON ENERGY NO: 3 LIMITED
  • Parent Company (CMU Registry) N/A
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +441642714570

Basic Information

Basic Information
  • Location via entrance at 132 Manchester Road, Carrington, Manchester, M31 4AY
  • Description 247.5MW capacity system with 520MWh of batteries with all ancillary equipment to be installed on the Trafford Site.
  • Company CARLTON ENERGY NO: 3 LIMITED

Technical Details

Technical Details
  • Technology Storage (Duration 1.5h)
  • Generation Type N/A
  • Connection Type N/A
  • De-Rated Capacity 28.51
  • Connection / DSR Capacity 247.50
  • Type T-4

Auction Information

Auction Information
  • Auction 2027-28 (T-4) Four Year Ahead Capacity Auction
  • Delivery Year 2,027
  • Status N/A
  • Clearing Price N/A

Additional Information

Additional Information
  • CMU ID TRBES3
  • Location and Post Code via entrance at 132 Manchester Road, Carrington, Manchester, M31 4AY
  • Description of CMU Components 247.5MW capacity system with 520MWh of batteries with all ancillary equipment to be installed on the Trafford Site.
  • Generating Technology Class Storage (Duration 1.5h)
  • Company Name CARLTON ENERGY NO: 3 LIMITED
  • Auction Name 2027-28 (T-4) Four Year Ahead Capacity Auction
  • _id 149,462
  • rank 0.07
  • Component ID TRBES3
  • OS Grid Reference SJ 725 929
  • Primary Fuel of Component Storage - Battery
  • Permitted on-Site Generating Unit N/A
  • Pre-Refurbishing De-Rated Capacity N/A
  • Post-Refurbishing De-Rated Capacity N/A
  • Generating Capacity of on-site Generating Unit N/A

CMU Registry Data

CMU Registry Data
  • Auction Capacity Auction
  • Type T-4
  • Delivery Year 2,027
  • Name of Applicant CARLTON ENERGY NO: 3 LIMITED
  • CM Unit Name Trafford Power Battery Storage Unit 3

Field Value
_id 149462
Type T-4
rank 0.0706241
CMU ID TRBES3
Auction Name 2027-28 (T-4) Four Year Ahead Capacity Auction
Component ID TRBES3
Delivery Year 2027
De-Rated Capacity 28.512
OS Grid Reference SJ 725 929
Location and Post Code via entrance at 132 Manchester Road, Carrington, Manchester, M31 4AY
Connection / DSR Capacity 247.5
Primary Fuel of Component Storage - Battery
Generating Technology Class Storage (Duration 1.5h)
Description of CMU Components 247.5MW capacity system with 520MWh of batteries with all ancillary equipment to be installed on the Trafford Site.
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity
null
Post-Refurbishing De-Rated Capacity
null
Generating Capacity of on-site Generating Unit
null

Field Value
_id 14890
Type T-4
CMU ID TRBES3
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2027-28 (T-4) Four Year Ahead Capacity Auction
CM Unit Name Trafford Power Battery Storage Unit 3
CM Unit Type CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2027
Opt Out Status Opt-In
Opt-Out Reason
null
Parent Company
null
DSR Test Method
null
Is FCM required Yes
CM Unit Category New Build Generating CMU
Storage Facility Yes
De-Rated Capacity 28.512
Name of Applicant CARLTON ENERGY NO: 3 LIMITED
Primary Fuel Type Storage - Battery
Registered Holder CARLTON ENERGY NO: 3 LIMITED
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover 427680
Termination Fee 1 Rate £5000.00 /MW
Termination Fee 2 Rate £25000.00 /MW
Termination Fee 3 Rate £10000.00 /MW
Termination Fee 4 Rate £15000.00 /MW
Termination Fee 5 Rate £35000.00 /MW
Connection / DSR Capacity 247.5
Maximum Obligation Period 15
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary
null
Pre-Refurbishing CMU Status
null
Transmission / Distribution Transmission
Unique Agreement Identifier CAN-2027-TRBES3-001
New Build Yet to Satisfy FCM Yes
Planning Consents Conditions
null
Anticipated De-Rated Capacity 28.512
Term of the Capacity Agreement 15
Nature of the Security Interest
null
CMU confirmed entry into Auction Yes
Is Connection Agreement required
null
Pre-Refurbishment Bidding Status
null
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity
null
Date of Issue of Capacity Agreement 2024-04-08
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity
null
Auction Acquired Capacity Obligation 28.512
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone '+441642714570
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded 15
Date for Financial Commitment Milestone 2025-07-11
Delivery Years for which Agreement Valid 2027/2028, 2028/2029, 2029/2030, 2030/2031, 2031/2032, 2032/2033, 2033/2034, 2034/2035, 2035/2036, 2036/2037, 2037/2038, 2038/2039, 2039/2040, 2040/2041, 2041/2042
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved 2027-09-30
Subject to Substantial Completion Milestone Yes
Subject to a Minimum Completion Requirement Yes
Earliest Date SCM is expected to be achieved 2026-03-30
Is copy of Grid Connection Agreement required
null
Anticipated Pre-Refurbishing De-Rated Capacity
null
Anticipated Post-Refurbishing De-Rated Capacity
null
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round 15
Long-Stop Date for the Minimum Completion Requirement 2028-10-01