Land off Fryers Road Bloxwich Walsall WS3 2XQ Map

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) 44.17 MW
  • De-Rated Capacity (CMU Registry) 44.17
  • Connection Capacity (CMU Registry) 49.90 MW
  • Anticipated Capacity (CMU Registry) 44.17 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name ENCYCLIS (WALSALL) LIMITED
  • Parent Company (CMU Registry) Encyclis Holdco Limited
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +44035316032119

Basic Information

Basic Information
  • Location Land off Fryers Road Bloxwich Walsall WS3 2XQ
  • Description An Energy from Waste facility located in Walsall, Staffordshire. The facility will utilise conventional mass-burn technology which is the most proven Energy from Waste technology currently available. The process will consist of the delivery of waste to the facility by truck, where it will be deposited in a storage bunker, from which it will be fed into a single combustion line, consisting of a moving grate, boiler and flue gas treatment equipment. The steam generated will drive a turbine for the generation of electricity.
  • Company ENCYCLIS (WALSALL) LIMITED

Technical Details

Technical Details
  • Technology Energy from Waste
  • Generation Type N/A
  • Connection Type N/A
  • De-Rated Capacity 44.17
  • Connection / DSR Capacity 49.90
  • Type T-4

Auction Information

Auction Information
  • Auction 2027-28 (T-4) Four Year Ahead Capacity Auction
  • Delivery Year 2,027
  • Status N/A
  • Clearing Price N/A

Additional Information

Additional Information
  • CMU ID WALL01
  • Location and Post Code Land off Fryers Road Bloxwich Walsall WS3 2XQ
  • Description of CMU Components An Energy from Waste facility located in Walsall, Staffordshire. The facility will utilise conventional mass-burn technology which is the most proven Energy from Waste technology currently available. The process will consist of the delivery of waste to the facility by truck, where it will be deposited in a storage bunker, from which it will be fed into a single combustion line, consisting of a moving grate, boiler and flue gas treatment equipment. The steam generated will drive a turbine for the generation of electricity.
  • Generating Technology Class Energy from Waste
  • Company Name ENCYCLIS (WALSALL) LIMITED
  • Auction Name 2027-28 (T-4) Four Year Ahead Capacity Auction
  • _id 1,561
  • rank 0.07
  • Component ID WALL01
  • OS Grid Reference SJ 994 016
  • Primary Fuel of Component Waste
  • Permitted on-Site Generating Unit N/A
  • Pre-Refurbishing De-Rated Capacity N/A
  • Post-Refurbishing De-Rated Capacity N/A
  • Generating Capacity of on-site Generating Unit N/A

CMU Registry Data

CMU Registry Data
  • Auction Capacity Auction
  • Type T-4
  • Delivery Year 2,027
  • Name of Applicant ENCYCLIS (WALSALL) LIMITED
  • CM Unit Name Walsall EfW

Field Value
_id 1561
Type T-4
rank 0.0706241
CMU ID WALL01
Auction Name 2027-28 (T-4) Four Year Ahead Capacity Auction
Component ID WALL01
Delivery Year 2027
De-Rated Capacity 44.171
OS Grid Reference SJ 994 016
Location and Post Code Land off Fryers Road Bloxwich Walsall WS3 2XQ
Connection / DSR Capacity 49.9
Primary Fuel of Component Waste
Generating Technology Class Energy from Waste
Description of CMU Components An Energy from Waste facility located in Walsall, Staffordshire. The facility will utilise conventional mass-burn technology which is the most proven Energy from Waste technology currently available. The process will consist of the delivery of waste to the facility by truck, where it will be deposited in a storage bunker, from which it will be fed into a single combustion line, consisting of a moving grate, boiler and flue gas treatment equipment. The steam generated will drive a turbine for the generation of electricity.
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity
null
Post-Refurbishing De-Rated Capacity
null
Generating Capacity of on-site Generating Unit
null

Field Value
_id 14961
Type T-4
CMU ID WALL01
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2027-28 (T-4) Four Year Ahead Capacity Auction
CM Unit Name Walsall EfW
CM Unit Type Non CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2027
Opt Out Status Opt-In
Opt-Out Reason
null
Parent Company Encyclis Holdco Limited
DSR Test Method
null
Is FCM required
null
CM Unit Category New Build Generating CMU
Storage Facility No
De-Rated Capacity 44.171
Name of Applicant ENCYCLIS (WALSALL) LIMITED
Primary Fuel Type Waste
Registered Holder ENCYCLIS (WALSALL) LIMITED
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover (empty)
Termination Fee 1 Rate £5000.00 /MW
Termination Fee 2 Rate £25000.00 /MW
Termination Fee 3 Rate £10000.00 /MW
Termination Fee 4 Rate £15000.00 /MW
Termination Fee 5 Rate £35000.00 /MW
Connection / DSR Capacity 49.9
Maximum Obligation Period 15
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary
null
Pre-Refurbishing CMU Status
null
Transmission / Distribution Distribution
Unique Agreement Identifier CAN-2027-WALL01-001
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity 44.171
Term of the Capacity Agreement 15
Nature of the Security Interest
null
CMU confirmed entry into Auction Yes
Is Connection Agreement required
null
Pre-Refurbishment Bidding Status
null
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity
null
Date of Issue of Capacity Agreement 2024-04-08
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity
null
Auction Acquired Capacity Obligation 44.171
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone '+44035316032119
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded 15
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid 2027/2028, 2028/2029, 2029/2030, 2030/2031, 2031/2032, 2032/2033, 2033/2034, 2034/2035, 2035/2036, 2036/2037, 2037/2038, 2038/2039, 2039/2040, 2040/2041, 2041/2042
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved 2027-10-17
Subject to Substantial Completion Milestone Yes
Subject to a Minimum Completion Requirement Yes
Earliest Date SCM is expected to be achieved 2027-07-03
Is copy of Grid Connection Agreement required
null
Anticipated Pre-Refurbishing De-Rated Capacity
null
Anticipated Post-Refurbishing De-Rated Capacity
null
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round 15
Long-Stop Date for the Minimum Completion Requirement 2028-10-01