Hill Hall Solar Farm, Little Bardfield, Braintree, Essex, CM7 4SH Map

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) N/A
  • De-Rated Capacity (CMU Registry) 1.09
  • Connection Capacity (CMU Registry) 3 MW
  • Anticipated Capacity (CMU Registry) 2.88 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name Lightsource SPV 183 Limited
  • Parent Company (CMU Registry) Lightsource Renewable Energy Holdings Limited
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +447833096261

Basic Information

Basic Information
  • Location Hill Hall Solar Farm, Little Bardfield, Braintree, Essex, CM7 4SH
  • Description The CMU consists of a battery energy storage system, physically co-located at the site of, but distinct from an existing solar PV generator.
  • Company Lightsource SPV 183 Limited

Technical Details

Technical Details
  • Technology Storage
  • Generation Type N/A
  • Connection Type N/A
  • De-Rated Capacity N/A
  • Connection / DSR Capacity N/A
  • Type T-1

Auction Information

Auction Information
  • Auction 2018-19 (T-1) One Year Ahead Capacity Auction
  • Delivery Year 2,018
  • Status N/A
  • Clearing Price N/A

Additional Information

Additional Information
  • CMU ID HHESS1
  • Location and Post Code Hill Hall Solar Farm, Little Bardfield, Braintree, Essex, CM7 4SH
  • Description of CMU Components The CMU consists of a battery energy storage system, physically co-located at the site of, but distinct from an existing solar PV generator.
  • Generating Technology Class Storage
  • Company Name Lightsource SPV 183 Limited
  • Auction Name 2018-19 (T-1) One Year Ahead Capacity Auction
  • _id 566,460
  • rank 0.06
  • Component ID 19,331
  • OS Grid Reference TL 652 322
  • Primary Fuel of Component N/A
  • Permitted on-Site Generating Unit N/A
  • Pre-Refurbishing De-Rated Capacity N/A
  • Post-Refurbishing De-Rated Capacity N/A
  • Generating Capacity of on-site Generating Unit N/A

CMU Registry Data

CMU Registry Data
  • Auction Capacity Auction
  • Type T-4
  • Delivery Year 2,021
  • Name of Applicant Lightsource SPV 183 Limited
  • CM Unit Name Hill Hall ESS

Field Value
_id 566460
Type T-1
rank 0.0573088
CMU ID HHESS1
Auction Name 2018-19 (T-1) One Year Ahead Capacity Auction
Component ID 019331
Delivery Year 2018
De-Rated Capacity
null
OS Grid Reference TL 652 322
Location and Post Code Hill Hall Solar Farm, Little Bardfield, Braintree, Essex, CM7 4SH
Connection / DSR Capacity
null
Primary Fuel of Component
null
Generating Technology Class Storage
Description of CMU Components The CMU consists of a battery energy storage system, physically co-located at the site of, but distinct from an existing solar PV generator.
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity
null
Post-Refurbishing De-Rated Capacity
null
Generating Capacity of on-site Generating Unit
null

Field Value
_id 5722
Type T-4
CMU ID HHESS1
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2021-22 (T-4) Four Year Ahead Capacity Auction
CM Unit Name Hill Hall ESS
CM Unit Type Non CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2021
Opt Out Status Opt-In
Opt-Out Reason
null
Parent Company Lightsource Renewable Energy Holdings Limited
DSR Test Method
null
Is FCM required Yes
CM Unit Category New Build Generating CMU
Storage Facility Yes
De-Rated Capacity 1.093
Name of Applicant Lightsource SPV 183 Limited
Primary Fuel Type Storage - Battery
Registered Holder Lightsource SPV 183 Limited
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover 16395
Termination Fee 1 Rate £5000.00 /MW
Termination Fee 2 Rate £25000.00 /MW
Termination Fee 3 Rate £10000.00 /MW
Termination Fee 4 Rate £15000.00 /MW
Termination Fee 5 Rate £35000.00 /MW
Connection / DSR Capacity 3
Maximum Obligation Period 15
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary
null
Pre-Refurbishing CMU Status
null
Transmission / Distribution Distribution
Unique Agreement Identifier CAN-2021-HHESS1-001
New Build Yet to Satisfy FCM Yes
Planning Consents Conditions
null
Anticipated De-Rated Capacity 2.883
Term of the Capacity Agreement 15
Nature of the Security Interest
null
CMU confirmed entry into Auction Yes
Is Connection Agreement required Yes
Pre-Refurbishment Bidding Status
null
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity
null
Date of Issue of Capacity Agreement 2018-03-20
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity
null
Auction Acquired Capacity Obligation 1.093
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone '+447833096261
Capacity Agreement has been Terminated Yes
Duration of Capacity Agreement Awarded 15
Date for Financial Commitment Milestone 2019-06-20
Delivery Years for which Agreement Valid 2021/2022, 2022/2023, 2023/2024, 2024/2025, 2025/2026, 2026/2027, 2027/2028, 2028/2029, 2029/2030, 2030/2031, 2031/2032, 2032/2033, 2033/2034, 2034/2035, 2035/2036
Connection Agreement Deferral Declaration Yes
Date of Termination of Capacity Agreement 2020-09-15
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement Yes
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
null
Anticipated Pre-Refurbishing De-Rated Capacity
null
Anticipated Post-Refurbishing De-Rated Capacity
null
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement 2020-03-31
Duration of Capacity Agreement in First Bidding Round 15
Long-Stop Date for the Minimum Completion Requirement 2022-10-01