Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS Map

General Information

Key Details
  • Description A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
  • Auction 2022-23 (T-1) One Year Ahead Capacity Auction
  • Delivery Year 2022
Geocoding Status: No

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) N/A
  • De-Rated Capacity (CMU Registry) 1.85
  • Connection Capacity (CMU Registry) 4.80 MW
  • Anticipated Capacity (CMU Registry) 1.93 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name THRIVE RENEWABLES (WICKEN) LIMITED
  • Parent Company (CMU Registry) N/A
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +4401462601606

Field Value
_id 585231
Type T-1
rank 0.0573088
CMU ID WKN004
Auction Name 2022-23 (T-1) One Year Ahead Capacity Auction
Component ID WKN002
Delivery Year 2022
De-Rated Capacity (empty)
OS Grid Reference SP 752 394
Proven DSR Capacity (empty)
Location and Post Code Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS
Connection / DSR Capacity (empty)
Primary Fuel of Component (empty)
Generating Technology Class Storage (Duration 1.5h)
Description of CMU Components A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
Permitted on-Site Generating Unit (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Post-Refurbishing De-Rated Capacity (empty)
Generating Capacity of on-site Generating Unit (empty)

Field Value
_id 6795
Type T-1
CMU ID WKN004
Auction Capacity Auction
Agent Name (empty)
Beta Value (empty)
Auction Name 2022-23 (T-1) One Year Ahead Capacity Auction
CM Unit Name Wicken
CM Unit Type Non CMRS
TEC Deferral (empty)
Unproven DSR (empty)
Delivery Year 2022
Opt Out Status Opt-In
Opt-Out Reason (empty)
Parent Company (empty)
DSR Test Method (empty)
Is FCM required (empty)
CM Unit Category New Build Generating CMU
Storage Facility Yes
De-Rated Capacity 1.855
Name of Applicant THRIVE RENEWABLES (WICKEN) LIMITED
Primary Fuel Type Storage - Battery
Registered Holder THRIVE RENEWABLES (WICKEN) LIMITED
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity (empty)
DSR Bidding Capacity (empty)
Amount of Credit Cover (empty)
Termination Fee 1 Rate £5000.00 /MW
Termination Fee 2 Rate £25000.00 /MW
Termination Fee 3 Rate £10000.00 /MW
Termination Fee 4 Rate £15000.00 /MW
Termination Fee 5 Rate £35000.00 /MW
Connection / DSR Capacity 4.804
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary (empty)
Pre-Refurbishing CMU Status (empty)
Transmission / Distribution Distribution
Unique Agreement Identifier CAN-2022-WKN004-001
New Build Yet to Satisfy FCM (empty)
Planning Consents Conditions (empty)
Anticipated De-Rated Capacity 1.931
Term of the Capacity Agreement 1
Nature of the Security Interest (empty)
CMU confirmed entry into Auction Yes
Is Connection Agreement required (empty)
Pre-Refurbishment Bidding Status (empty)
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Date of Issue of Capacity Agreement 2022-03-25
List of Traded Capacity Obligations (empty)
Post-Refurbishing De-Rated Capacity (empty)
Auction Acquired Capacity Obligation 1.855
Date of Issue of DSR Test Certificate (empty)
Has Capacity Agreement been Suspended (empty)
Period for which the transfer applies (empty)
Secondary Trading Contact - Telephone '+4401462601606
Capacity Agreement has been Terminated Yes
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone (empty)
Delivery Years for which Agreement Valid 2022/2023
Connection Agreement Deferral Declaration (empty)
Date of Termination of Capacity Agreement 2023-02-03
Latest Date SCM is expected to be achieved (empty)
Subject to Substantial Completion Milestone (empty)
Subject to a Minimum Completion Requirement Yes
Earliest Date SCM is expected to be achieved (empty)
Is copy of Grid Connection Agreement required (empty)
Anticipated Pre-Refurbishing De-Rated Capacity (empty)
Anticipated Post-Refurbishing De-Rated Capacity (empty)
Legal Name of any Person with a Security Interest (empty)
Date for provision of deferred Connection Agreement (empty)
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement 2022-10-01