N/A Map

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) N/A
  • De-Rated Capacity (CMU Registry) 201.30
  • Connection Capacity (CMU Registry) 223.66 MW
  • Anticipated Capacity (CMU Registry) 201.60 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name ESSO PETROLEUM COMPANY,LIMITED
  • Parent Company (CMU Registry) N/A
  • Secondary Trading Email (CMU Registry) N/A
  • Secondary Trading Phone (CMU Registry) N/A

Basic Information

Basic Information
  • Location N/A
  • Description Unit 5 is part of the aggregated CMU EPCMU3, which made up of 3 Generating Units of which Unit 5 is the largest. This Generating Unit forms the E_FAWN-1 BMU on its own and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EPCMU3 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station. All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power is not half hourly metered but does have meters that are manually read monthly. Using the monthly data from the qualification period of the 3 Highest Performance Periods during August 2012 to July 2014 we have determined that on average the TOTAL auxiliary load for all three of the generating units is 7.63 MW which represents 9.85% of the total Power Demand as measured at the metering point MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to Unit 5 and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.855/3 = 3.28%. of MSID 7096.
  • Company ESSO PETROLEUM COMPANY,LIMITED

Technical Details

Technical Details
  • Technology N/A
  • Generation Type N/A
  • Connection Type N/A
  • De-Rated Capacity N/A
  • Connection / DSR Capacity N/A
  • Type T-4

Auction Information

Auction Information
  • Auction 2018-19 (T-4) Four Year Ahead Capacity Auction
  • Delivery Year 2,018
  • Status N/A
  • Clearing Price N/A

Additional Information

Additional Information
  • CMU ID EPCMU3
  • Location and Post Code N/A
  • Description of CMU Components Unit 5 is part of the aggregated CMU EPCMU3, which made up of 3 Generating Units of which Unit 5 is the largest. This Generating Unit forms the E_FAWN-1 BMU on its own and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EPCMU3 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station. All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power is not half hourly metered but does have meters that are manually read monthly. Using the monthly data from the qualification period of the 3 Highest Performance Periods during August 2012 to July 2014 we have determined that on average the TOTAL auxiliary load for all three of the generating units is 7.63 MW which represents 9.85% of the total Power Demand as measured at the metering point MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to Unit 5 and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.855/3 = 3.28%. of MSID 7096.
  • Generating Technology Class N/A
  • Company Name ESSO PETROLEUM COMPANY,LIMITED
  • Auction Name 2018-19 (T-4) Four Year Ahead Capacity Auction
  • _id 535,332
  • rank 0.08
  • Component ID 1
  • OS Grid Reference N/A
  • Primary Fuel of Component N/A
  • Permitted on-Site Generating Unit N/A
  • Pre-Refurbishing De-Rated Capacity N/A
  • Post-Refurbishing De-Rated Capacity N/A
  • Generating Capacity of on-site Generating Unit N/A

CMU Registry Data

CMU Registry Data
  • Auction Capacity Auction
  • Type T-4
  • Delivery Year 2,018
  • Name of Applicant ESSO PETROLEUM COMPANY,LIMITED
  • CM Unit Name EPCo Fawley CMU

Field Value
_id 535332
Type T-4
rank 0.076422
CMU ID EPCMU3
Auction Name 2018-19 (T-4) Four Year Ahead Capacity Auction
Component ID 1
Delivery Year 2018
De-Rated Capacity
null
OS Grid Reference
null
Location and Post Code
null
Connection / DSR Capacity
null
Primary Fuel of Component
null
Generating Technology Class
null
Description of CMU Components Unit 5 is part of the aggregated CMU EPCMU3, which made up of 3 Generating Units of which Unit 5 is the largest. This Generating Unit forms the E_FAWN-1 BMU on its own and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EPCMU3 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station. All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power is not half hourly metered but does have meters that are manually read monthly. Using the monthly data from the qualification period of the 3 Highest Performance Periods during August 2012 to July 2014 we have determined that on average the TOTAL auxiliary load for all three of the generating units is 7.63 MW which represents 9.85% of the total Power Demand as measured at the metering point MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to Unit 5 and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.855/3 = 3.28%. of MSID 7096.
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity
null
Post-Refurbishing De-Rated Capacity
null
Generating Capacity of on-site Generating Unit
null

Field Value
_id 1903
Type T-4
CMU ID EPCMU3
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2018-19 (T-4) Four Year Ahead Capacity Auction
CM Unit Name EPCo Fawley CMU
CM Unit Type CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2018
Opt Out Status Opt-In
Opt-Out Reason N/A (Opt-in)
Parent Company
null
DSR Test Method
null
Is FCM required
null
CM Unit Category Existing Generating CMU
Storage Facility
null
De-Rated Capacity 201.296
Name of Applicant ESSO PETROLEUM COMPANY,LIMITED
Primary Fuel Type
null
Registered Holder ESSO PETROLEUM COMPANY,LIMITED
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover
null
Termination Fee 1 Rate £5,000/MW
Termination Fee 2 Rate £25,000/MW
Termination Fee 3 Rate
null
Termination Fee 4 Rate
null
Termination Fee 5 Rate
null
Connection / DSR Capacity 223.662
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary
null
Pre-Refurbishing CMU Status
null
Transmission / Distribution Distribution
Unique Agreement Identifier CAN-2018-EPCMU3-00001
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity 201.6
Term of the Capacity Agreement 1
Nature of the Security Interest
null
CMU confirmed entry into Auction Yes
Is Connection Agreement required
null
Pre-Refurbishment Bidding Status N/A
Secondary Trading Contact - Email
null
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity (empty)
Date of Issue of Capacity Agreement 2015-01-30
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity (empty)
Auction Acquired Capacity Obligation 201.296
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone
null
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid 2018/2019
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
null
Anticipated Pre-Refurbishing De-Rated Capacity (empty)
Anticipated Post-Refurbishing De-Rated Capacity (empty)
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement
null