Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.
Field | Value |
---|---|
_id | 535333 |
Type | T-4 |
rank | 0.076422 |
CMU ID | EPCMU3 |
Auction Name | 2018-19 (T-4) Four Year Ahead Capacity Auction |
Component ID | 2 |
Delivery Year | 2018 |
De-Rated Capacity |
null |
OS Grid Reference |
null |
Location and Post Code |
null |
Connection / DSR Capacity |
null |
Primary Fuel of Component |
null |
Generating Technology Class |
null |
Description of CMU Components | TG1 is part of the aggregated CMU EPCMU3, which is made up of 3 Generating Units of which TG1 is of medium size. This Generating Unit is embedded in the E_FAWND BMU and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EPCMU3 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1 is one of three power and steam generation units on site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station. All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power is not half hourly metered but does have meters that are manually read monthly. Using the monthly data from the qualification period of the 3 Highest Performance Periods during August 2012 to July 2014 we have determined that on average the TOTAL auxiliary load for all three of the generating units is 7.63 MW which represents 9.85% of the total Power Demand as measured at the metering point MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1 and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.855/3 = 3.28% of MSID 7096. NB. the rest of MSID 7095 is made up of one of our other components of our CMU - Unit 3). |
Permitted on-Site Generating Unit |
null |
Pre-Refurbishing De-Rated Capacity |
null |
Post-Refurbishing De-Rated Capacity |
null |
Generating Capacity of on-site Generating Unit |
null |
Field | Value |
---|---|
_id | 1903 |
Type | T-4 |
CMU ID | EPCMU3 |
Auction | Capacity Auction |
Agent Name |
null |
Beta Value |
null |
Auction Name | 2018-19 (T-4) Four Year Ahead Capacity Auction |
CM Unit Name | EPCo Fawley CMU |
CM Unit Type | CMRS |
TEC Deferral |
null |
Unproven DSR |
null |
Delivery Year | 2018 |
Opt Out Status | Opt-In |
Opt-Out Reason | N/A (Opt-in) |
Parent Company |
null |
DSR Test Method |
null |
Is FCM required |
null |
CM Unit Category | Existing Generating CMU |
Storage Facility |
null |
De-Rated Capacity | 201.296 |
Name of Applicant | ESSO PETROLEUM COMPANY,LIMITED |
Primary Fuel Type |
null |
Registered Holder | ESSO PETROLEUM COMPANY,LIMITED |
Annual Penalty Cap | 1 |
Monthly Penalty Cap | 2 |
Proven DSR Capacity |
null |
DSR Bidding Capacity |
null |
Amount of Credit Cover |
null |
Termination Fee 1 Rate | £5,000/MW |
Termination Fee 2 Rate | £25,000/MW |
Termination Fee 3 Rate |
null |
Termination Fee 4 Rate |
null |
Termination Fee 5 Rate |
null |
Connection / DSR Capacity | 223.662 |
Maximum Obligation Period | 1 |
Capacity Agreement Awarded | Yes |
Pre-Qualification Decision | Prequalified |
Capacity obligation Summary |
null |
Pre-Refurbishing CMU Status |
null |
Transmission / Distribution | Distribution |
Unique Agreement Identifier | CAN-2018-EPCMU3-00001 |
New Build Yet to Satisfy FCM |
null |
Planning Consents Conditions |
null |
Anticipated De-Rated Capacity | 201.6 |
Term of the Capacity Agreement | 1 |
Nature of the Security Interest |
null |
CMU confirmed entry into Auction | Yes |
Is Connection Agreement required |
null |
Pre-Refurbishment Bidding Status | N/A |
Secondary Trading Contact - Email |
null |
Date for provision of deferred TEC |
null |
Pre-Refurbishing De-Rated Capacity | (empty) |
Date of Issue of Capacity Agreement | 2015-01-30 |
List of Traded Capacity Obligations |
null |
Post-Refurbishing De-Rated Capacity | (empty) |
Auction Acquired Capacity Obligation | 201.296 |
Date of Issue of DSR Test Certificate |
null |
Has Capacity Agreement been Suspended |
null |
Period for which the transfer applies |
null |
Secondary Trading Contact - Telephone |
null |
Capacity Agreement has been Terminated |
null |
Duration of Capacity Agreement Awarded | 1 |
Date for Financial Commitment Milestone |
null |
Delivery Years for which Agreement Valid | 2018/2019 |
Connection Agreement Deferral Declaration |
null |
Date of Termination of Capacity Agreement |
null |
Latest Date SCM is expected to be achieved |
null |
Subject to Substantial Completion Milestone |
null |
Subject to a Minimum Completion Requirement |
null |
Earliest Date SCM is expected to be achieved |
null |
Is copy of Grid Connection Agreement required |
null |
Anticipated Pre-Refurbishing De-Rated Capacity | (empty) |
Anticipated Post-Refurbishing De-Rated Capacity | (empty) |
Legal Name of any Person with a Security Interest |
null |
Date for provision of deferred Connection Agreement |
null |
Duration of Capacity Agreement in First Bidding Round | 1 |
Long-Stop Date for the Minimum Completion Requirement |
null |