Home List View Map View Technologies Companies Support Us Help Login Register
Theme
Drax Power Station, Selby, North Yorkshire, YO8 8PH Map

General Information

Key Details
  • Description This CMU component is a boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5 under the BSC. The metering for this unit is an aggregation of GEN5 and UT5.The net output of the CMU component will be the metered output for T_DRAXX-5 less the auxiliary load.
  • Auction 2017-18 (T-1) One Year Ahead Capacity Auction
  • Delivery Year 2017
Geocoding Status: No

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) N/A
  • De-Rated Capacity (CMU Registry) 557.84
  • Connection Capacity (CMU Registry) 641.79 MW
  • Anticipated Capacity (CMU Registry) N/A

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name DRAX POWER LIMITED
  • Parent Company (CMU Registry) N/A
  • Secondary Trading Email (CMU Registry) N/A
  • Secondary Trading Phone (CMU Registry) +4401757618381

Field Value
_id 589651
Type T-1
rank 0.0573088
CMU ID DX0516
Auction Name 2017-18 (T-1) One Year Ahead Capacity Auction
Component ID T_DRAXX-5
Delivery Year 2017
De-Rated Capacity (empty)
OS Grid Reference SE 667 267
Proven DSR Capacity (empty)
Location and Post Code Drax Power Station, Selby, North Yorkshire, YO8 8PH
Connection / DSR Capacity (empty)
Primary Fuel of Component (empty)
Generating Technology Class (empty)
Description of CMU Components This CMU component is a boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5 under the BSC. The metering for this unit is an aggregation of GEN5 and UT5.The net output of the CMU component will be the metered output for T_DRAXX-5 less the auxiliary load.
Permitted on-Site Generating Unit (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Post-Refurbishing De-Rated Capacity (empty)
Generating Capacity of on-site Generating Unit (empty)

Field Value
_id 351
Type T-1
CMU ID DX0516
Auction Capacity Auction
Agent Name (empty)
Beta Value (empty)
Auction Name 2017-18 (T-1) One Year Ahead Capacity Auction
CM Unit Name DRAX05
CM Unit Type CMRS
TEC Deferral (empty)
Unproven DSR (empty)
Delivery Year 2017
Opt Out Status Opt-In
Opt-Out Reason (empty)
Parent Company (empty)
DSR Test Method (empty)
Is FCM required (empty)
CM Unit Category Existing Generating CMU
Storage Facility No
De-Rated Capacity 557.843
Name of Applicant DRAX POWER LIMITED
Primary Fuel Type (empty)
Registered Holder DRAX POWER LIMITED
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity (empty)
DSR Bidding Capacity (empty)
Amount of Credit Cover (empty)
Termination Fee 1 Rate £5000.00 /MW
Termination Fee 2 Rate £25000.00 /MW
Termination Fee 3 Rate £10000.00 /MW
Termination Fee 4 Rate £15000.00 /MW
Termination Fee 5 Rate £35000.00 /MW
Connection / DSR Capacity 641.789
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary (empty)
Pre-Refurbishing CMU Status (empty)
Transmission / Distribution Transmission
Unique Agreement Identifier CAN-2017-DX0516-001
New Build Yet to Satisfy FCM (empty)
Planning Consents Conditions (empty)
Anticipated De-Rated Capacity (empty)
Term of the Capacity Agreement 1
Nature of the Security Interest (empty)
CMU confirmed entry into Auction Yes
Is Connection Agreement required (empty)
Pre-Refurbishment Bidding Status (empty)
Secondary Trading Contact - Email (empty)
Date for provision of deferred TEC (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Date of Issue of Capacity Agreement 2017-02-15
List of Traded Capacity Obligations (empty)
Post-Refurbishing De-Rated Capacity (empty)
Auction Acquired Capacity Obligation 557.843
Date of Issue of DSR Test Certificate (empty)
Has Capacity Agreement been Suspended (empty)
Period for which the transfer applies (empty)
Secondary Trading Contact - Telephone '+4401757618381
Capacity Agreement has been Terminated (empty)
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone (empty)
Delivery Years for which Agreement Valid 2017/2018
Connection Agreement Deferral Declaration (empty)
Date of Termination of Capacity Agreement (empty)
Latest Date SCM is expected to be achieved (empty)
Subject to Substantial Completion Milestone (empty)
Subject to a Minimum Completion Requirement (empty)
Earliest Date SCM is expected to be achieved (empty)
Is copy of Grid Connection Agreement required (empty)
Anticipated Pre-Refurbishing De-Rated Capacity (empty)
Anticipated Post-Refurbishing De-Rated Capacity (empty)
Legal Name of any Person with a Security Interest (empty)
Date for provision of deferred Connection Agreement (empty)
Duration of Capacity Agreement in First Bidding Round (empty)
Long-Stop Date for the Minimum Completion Requirement (empty)