Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.
Field | Value |
---|---|
_id | 280919 |
Type | T-4 |
rank | 0.0573088 |
CMU ID | FCCBU2 |
Auction Name | 2025-26 (T-4) Four Year Ahead Capacity Auction |
Component ID | FCCBU1 |
Delivery Year | 2025 |
De-Rated Capacity |
null |
OS Grid Reference | SP 706 185 |
Location and Post Code | Greatmoor EfW, Greatmoor Road, Woodham, Aylesbury, Buckinghamshire, HP18 0QE |
Connection / DSR Capacity |
null |
Primary Fuel of Component |
null |
Generating Technology Class | Energy from Waste |
Description of CMU Components | This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" status FCC Buckinghamshire Ltd. 300kT Energy from Waste Plant with c. 25MW net output. Auxiliary load is not included in the connection capacity i.e the export is net. |
Permitted on-Site Generating Unit |
null |
Pre-Refurbishing De-Rated Capacity |
null |
Post-Refurbishing De-Rated Capacity |
null |
Generating Capacity of on-site Generating Unit |
null |
Field | Value |
---|---|
_id | 3795 |
Type | T-4 |
CMU ID | BUCK02 |
Auction | Capacity Auction |
Agent Name |
null |
Beta Value |
null |
Auction Name | 2020-21 (T-4) Four Year Ahead Capacity Auction |
CM Unit Name | FCC Buckinghamshire Ltd |
CM Unit Type | Non CMRS |
TEC Deferral |
null |
Unproven DSR |
null |
Delivery Year | 2020 |
Opt Out Status | Opt-In |
Opt-Out Reason |
null |
Parent Company |
null |
DSR Test Method |
null |
Is FCM required |
null |
CM Unit Category | New Build Generating CMU |
Storage Facility | No |
De-Rated Capacity | 23.642 |
Name of Applicant | FCC BUCKINGHAMSHIRE LIMITED |
Primary Fuel Type |
null |
Registered Holder | FCC BUCKINGHAMSHIRE LIMITED |
Annual Penalty Cap | 1 |
Monthly Penalty Cap | 2 |
Proven DSR Capacity |
null |
DSR Bidding Capacity |
null |
Amount of Credit Cover | (empty) |
Termination Fee 1 Rate | £5000.00 /MW |
Termination Fee 2 Rate | £25000.00 /MW |
Termination Fee 3 Rate | £10000.00 /MW |
Termination Fee 4 Rate | £15000.00 /MW |
Termination Fee 5 Rate | £35000.00 /MW |
Connection / DSR Capacity | 27.2 |
Maximum Obligation Period | 1 |
Capacity Agreement Awarded | Yes |
Pre-Qualification Decision | Prequalified |
Capacity obligation Summary |
null |
Pre-Refurbishing CMU Status |
null |
Transmission / Distribution | Distribution |
Unique Agreement Identifier | CAN-2020-BUCK02-001 |
New Build Yet to Satisfy FCM |
null |
Planning Consents Conditions |
null |
Anticipated De-Rated Capacity | 23.642 |
Term of the Capacity Agreement | 1 |
Nature of the Security Interest |
null |
CMU confirmed entry into Auction | Yes |
Is Connection Agreement required |
null |
Pre-Refurbishment Bidding Status |
null |
Secondary Trading Contact - Email |
null |
Date for provision of deferred TEC |
null |
Pre-Refurbishing De-Rated Capacity |
null |
Date of Issue of Capacity Agreement | 2017-01-20 |
List of Traded Capacity Obligations |
null |
Post-Refurbishing De-Rated Capacity |
null |
Auction Acquired Capacity Obligation | 23.642 |
Date of Issue of DSR Test Certificate |
null |
Has Capacity Agreement been Suspended |
null |
Period for which the transfer applies |
null |
Secondary Trading Contact - Telephone | '+4401302303030 |
Capacity Agreement has been Terminated |
null |
Duration of Capacity Agreement Awarded | 1 |
Date for Financial Commitment Milestone |
null |
Delivery Years for which Agreement Valid | 2020/2021 |
Connection Agreement Deferral Declaration |
null |
Date of Termination of Capacity Agreement |
null |
Latest Date SCM is expected to be achieved |
null |
Subject to Substantial Completion Milestone |
null |
Subject to a Minimum Completion Requirement |
null |
Earliest Date SCM is expected to be achieved |
null |
Is copy of Grid Connection Agreement required |
null |
Anticipated Pre-Refurbishing De-Rated Capacity |
null |
Anticipated Post-Refurbishing De-Rated Capacity |
null |
Legal Name of any Person with a Security Interest |
null |
Date for provision of deferred Connection Agreement |
null |
Duration of Capacity Agreement in First Bidding Round | 1 |
Long-Stop Date for the Minimum Completion Requirement |
null |