St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF Map

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) N/A
  • De-Rated Capacity (CMU Registry) 4.20
  • Connection Capacity (CMU Registry) 4.58 MW
  • Anticipated Capacity (CMU Registry) 4.20 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name LEICESTER DISTRICT ENERGY COMPANY LIMITED
  • Parent Company (CMU Registry) BRING ENERGY GROUP LIMITED
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +4407811071199

Basic Information

Basic Information
  • Location St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF
  • Description Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
  • Company LEICESTER DISTRICT ENERGY COMPANY LIMITED

Technical Details

Technical Details
  • Technology Combined Heat and Power (CHP)
  • Generation Type N/A
  • Connection Type N/A
  • De-Rated Capacity N/A
  • Connection / DSR Capacity N/A
  • Type T-4

Auction Information

Auction Information
  • Auction 2023-24 (T-4) Four Year Ahead Capacity Auction
  • Delivery Year 2,023
  • Status N/A
  • Clearing Price N/A

Additional Information

Additional Information
  • CMU ID CES208
  • Location and Post Code St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF
  • Description of CMU Components Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
  • Generating Technology Class Combined Heat and Power (CHP)
  • Company Name LEICESTER DISTRICT ENERGY COMPANY LIMITED
  • Auction Name 2023-24 (T-4) Four Year Ahead Capacity Auction
  • _id 149,752
  • rank 0.06
  • Component ID NOR001
  • OS Grid Reference SK 593 057
  • Primary Fuel of Component N/A
  • Permitted on-Site Generating Unit N/A
  • Pre-Refurbishing De-Rated Capacity N/A
  • Post-Refurbishing De-Rated Capacity N/A
  • Generating Capacity of on-site Generating Unit N/A

CMU Registry Data

CMU Registry Data
  • Auction Capacity Auction
  • Type T-4
  • Delivery Year 2,027
  • Name of Applicant LEICESTER DISTRICT ENERGY COMPANY LIMITED
  • CM Unit Name LDEC

Field Value
_id 149752
Type T-4
rank 0.0573088
CMU ID CES208
Auction Name 2023-24 (T-4) Four Year Ahead Capacity Auction
Component ID NOR001
Delivery Year 2023
De-Rated Capacity
null
OS Grid Reference SK 593 057
Location and Post Code St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF
Connection / DSR Capacity
null
Primary Fuel of Component
null
Generating Technology Class Combined Heat and Power (CHP)
Description of CMU Components Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity
null
Post-Refurbishing De-Rated Capacity
null
Generating Capacity of on-site Generating Unit
null

Field Value
_id 14323
Type T-4
CMU ID CES208
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2027-28 (T-4) Four Year Ahead Capacity Auction
CM Unit Name LDEC
CM Unit Type Non CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2027
Opt Out Status Opt-In
Opt-Out Reason
null
Parent Company BRING ENERGY GROUP LIMITED
DSR Test Method
null
Is FCM required
null
CM Unit Category Existing Generating CMU
Storage Facility No
De-Rated Capacity 4.196
Name of Applicant LEICESTER DISTRICT ENERGY COMPANY LIMITED
Primary Fuel Type Gas
Registered Holder LEICESTER DISTRICT ENERGY COMPANY LIMITED
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover (empty)
Termination Fee 1 Rate £5000.00 /MW
Termination Fee 2 Rate £25000.00 /MW
Termination Fee 3 Rate £10000.00 /MW
Termination Fee 4 Rate £15000.00 /MW
Termination Fee 5 Rate £35000.00 /MW
Connection / DSR Capacity 4.581
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary
null
Pre-Refurbishing CMU Status
null
Transmission / Distribution Distribution
Unique Agreement Identifier CAN-2027-CES208-001
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity 4.196
Term of the Capacity Agreement 1
Nature of the Security Interest
null
CMU confirmed entry into Auction Yes
Is Connection Agreement required
null
Pre-Refurbishment Bidding Status
null
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity
null
Date of Issue of Capacity Agreement 2024-04-08
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity
null
Auction Acquired Capacity Obligation 4.196
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone '+4407811071199
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid 2027/2028
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
null
Anticipated Pre-Refurbishing De-Rated Capacity
null
Anticipated Post-Refurbishing De-Rated Capacity
null
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement
null