Home List View Map View Technologies Companies Support Us Help Login Register
Theme
Site of the former Teesside Power Station Greystone Road Grangetown Middlesbrough TS6 8JF
2 Components Combined Cycle Gas Turbine (CCGT) Sembcorp Utilities (UK) Limited
Total Capacity: N/A
Components: 2
Technologies:
Combined Cycle Gas Turbine (CCGT)
Unique CMUs: 2

Secondary Trading Contacts

Contact Information

Component Descriptions

Tees CCPP is a 542.6MW CCGT unit to be installed on designated land within the (former ICI) Wilton Site this will be connected to Greystones 275kV 'A' Substation and Greystones 275kV 'B' Substation.

Used by 2 CMUs

CMU Identifiers

Components at this Location

Tees CCPP is a 542.6MW CCGT unit to be installed on designated land within the (former ICI) Wilton Site this will be connected to Greystones 275kV 'A' Substation and Greystones 275kV 'B' Substation.
CMU: S23TP1
Combined Cycle Gas Turbine (CCGT) Sembcorp Utilities (UK) Limited Parent: SEMBCORP ENERGY UK LIMITED
Capacity Information:
De-Rated Capacity (Registry) 488.34
Connection/DSR Capacity 542.6
Anticipated Capacity 488.34
CMU: S24TP1
Combined Cycle Gas Turbine (CCGT) Sembcorp Utilities (UK) Limited Parent: SEMBCORP ENERGY UK LIMITED
Capacity Information:
De-Rated Capacity (Registry) 488.34
Connection/DSR Capacity 542.6
Anticipated Capacity 488.34