TG1B is part of the aggregated CMU EM3-21, which is made up of 3 Generating Units of which TG1B of medium size. This Generating Unit is embedded in the E_FAWND BMU and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EM3-21 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power and steam generation units on site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power will have half hourly meters, these will be installed in time to pass a Metering Test for this Capacity Market. For now, using the same method as for the T4 -2018 Capacity Market, we have determined this to be ~ 7.72s MW (maximum consumption over the three Highest Generation points) which represents 9.79% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.79/3 = 3.26% of MSID 7096, thus 2.574 MW. (NB. the rest of MSID 7095 is made up of one of our other components of our CMU - Unit 3).
Used by 1 CMUUnit 3 is part of the aggregated CMU EM3-21, which is made up of 3 Generating Units of which Unit 3 is the smallest. This Generating Unit is embedded in the E_FAWND BMU and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EM3-21 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 3 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power will have half hourly meters, these will be installed in time to pass a Metering Test for this Capacity Market. For now, using the same method as for the T4 -2018 Capacity Market, we have determined this to be ~ 7.72s MW (maximum consumption over the three Highest Generation points) which represents 9.79% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.79/3 = 3.26% of MSID 7096, thus 2.574 MW. (NB. the rest of MSID 7095 is made up of one of our other components of our CMU - TG1B).
Used by 1 CMUUnit 5 is part of the aggregated CMU EM3-21, which made up of 3 Generating Units of which Unit 5 is the largest. This Generating Unit forms the E_FAWN-1 BMU on its own and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EM3-21 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (MSID 7081). All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power will have half hourly meters, these will be installed in time to pass a Metering Test for this Capacity Market. For now, using the same method as for the T4 -2018 Capacity Market, we have determined this to be ~ 7.72s MW (maximum consumption over the three Highest Generation points) which represents 9.79% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.79/3 = 3.26% of MSID 7096, thus 2.574 MW.
Used by 1 CMUDe-Rated Capacity (Registry) | 197.295 |
Connection/DSR Capacity | 219.217 |
Anticipated Capacity | 204.245 |
De-Rated Capacity (Registry) | 197.295 |
Connection/DSR Capacity | 219.217 |
Anticipated Capacity | 204.245 |
De-Rated Capacity (Registry) | 197.295 |
Connection/DSR Capacity | 219.217 |
Anticipated Capacity | 204.245 |