17 Components Reciprocating engines Storage (Duration 2h) Storage (Duration 5h) Combined Cycle Gas Turbine (CCGT) WAINSTONES ENERGY LIMITED
Total Capacity: 93.41 MW
Components: 17
Technologies:
Reciprocating engines, Storage (Duration 2h), Storage (Duration 5h), Combined Cycle Gas Turbine (CCGT)
Unique CMUs: 17

Secondary Trading Contacts

Component Descriptions

250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site

Used by 1 CMU

49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site

Used by 1 CMU

50MW capacity system with 100MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site

Used by 1 CMU

50MW supply system with 250MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site

Used by 1 CMU

5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site

Used by 4 CMUs

5 x 9.98MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site

Used by 1 CMU

New combined cycle gas turbine unit comprising the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed on Carrington Manchester

Used by 6 CMUs

New combined cycle power station comprising the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed on Carrington Manchester

Used by 1 CMU

One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site

Used by 1 CMU

Components at this Location

250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
CMU: TRAFBA
Storage (Duration 2h) WAINSTONES ENERGY LIMITED Parent: Carlton Power Limited
Capacity Information:
De-Rated Capacity (Registry) 99.325
Connection/DSR Capacity 250
Anticipated Capacity 99.325
49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
CMU: TRAGRT
Reciprocating engines CARLTON ENERGY NO: 5 LIMITED
Capacity Information:
De-Rated Capacity (Registry) 46.703
Connection/DSR Capacity 49.5
Anticipated Capacity 46.703
50MW capacity system with 100MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
CMU: TRAFB1
Storage (Duration 2h) WAINSTONES ENERGY LIMITED Parent: Carlton Power Limited
Capacity Information:
De-Rated Capacity (Registry) 24.31
Connection/DSR Capacity 50
Anticipated Capacity 24.31
50MW supply system with 250MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
CMU: TRAFB2
Storage (Duration 5h) WAINSTONES ENERGY LIMITED Parent: Carlton Power Limited
Capacity Information:
De-Rated Capacity (Registry) 47.32
Connection/DSR Capacity 50
Anticipated Capacity 47.32
5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
CMU: TRAGR2
Reciprocating engines WAINSTONES ENERGY LIMITED Parent: Carlton Power Limited
Capacity Information:
De-Rated Capacity (Registry) 21.425
Connection/DSR Capacity 22.5
Anticipated Capacity 21.425
CMU: TRAGR3
Reciprocating engines WAINSTONES ENERGY LIMITED Parent: Carlton Power Limited
Capacity Information:
De-Rated Capacity (Registry) 21.425
Connection/DSR Capacity 22.5
Anticipated Capacity 21.425
CMU: TRAGRA
Reciprocating engines WAINSTONES ENERGY LIMITED Parent: Carlton Power Limited
Capacity Information:
De-Rated Capacity (Registry) 21.229
Connection/DSR Capacity 22.5
Anticipated Capacity 21.229
CMU: TRAGRB
Reciprocating engines WAINSTONES ENERGY LIMITED Parent: Carlton Power Limited
Capacity Information:
De-Rated Capacity (Registry) 21.229
Connection/DSR Capacity 22.5
Anticipated Capacity 21.229
5 x 9.98MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
CMU: TRAGR1
Reciprocating engines WAINSTONES ENERGY LIMITED Parent: Carlton Power Limited
Capacity Information:
De-Rated Capacity (Registry) 47.515
Connection/DSR Capacity 49.9
Anticipated Capacity 47.515
New combined cycle gas turbine unit comprising the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed on Carrington Manchester
CMU: TRACU1
Combined Cycle Gas Turbine (CCGT) WAINSTONES ENERGY LIMITED Parent: Carlton Power Limited
Capacity Information:
De-Rated Capacity (Registry) 795.55
Connection/DSR Capacity 875
Anticipated Capacity 795.55
CMU: TRAFF1
Combined Cycle Gas Turbine (CCGT) WAINSTONES ENERGY LIMITED Parent: Carlton Power Limited
Capacity Information:
De-Rated Capacity (Registry) 810
Connection/DSR Capacity 900
Anticipated Capacity 810
CMU: TRAFF2
Combined Cycle Gas Turbine (CCGT) WAINSTONES ENERGY LIMITED Parent: Carlton Power Limited
Capacity Information:
De-Rated Capacity (Registry) 810
Connection/DSR Capacity 900
Anticipated Capacity 810
CMU: TRAFH1
Combined Cycle Gas Turbine (CCGT) WAINSTONES ENERGY LIMITED Parent: Carlton Power Limited
Capacity Information:
De-Rated Capacity (Registry) 810
Connection/DSR Capacity 900
Anticipated Capacity 810
CMU: TRAFH2
Combined Cycle Gas Turbine (CCGT) WAINSTONES ENERGY LIMITED Parent: Carlton Power Limited
Capacity Information:
De-Rated Capacity (Registry) 810
Connection/DSR Capacity 900
Anticipated Capacity 810
CMU: TRAFU1
Combined Cycle Gas Turbine (CCGT) WAINSTONES ENERGY LIMITED Parent: Carlton Power Limited
Capacity Information:
De-Rated Capacity (Registry) 759.6
Connection/DSR Capacity 844
Anticipated Capacity 759.6
New combined cycle power station comprising the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed on Carrington Manchester
CMU: TRAFFO
Combined Cycle Gas Turbine (CCGT) WAINSTONES ENERGY LIMITED Parent: Carlton Power Limited
Capacity Information:
De-Rated Capacity (Registry) 1620
Connection/DSR Capacity 1800
Anticipated Capacity 1620
One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
CMU: TRAGRC
Reciprocating engines WAINSTONES ENERGY LIMITED Parent: Carlton Power Limited
Capacity Information:
De-Rated Capacity (Registry) 4.246
Connection/DSR Capacity 4.5
Anticipated Capacity 4.246