Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Orchardbank Battery Storage, Orchard Loan, Oilfield Machinery Ltd, Orchardbank Industrial Estate, Forfar, DD8 1TD
DD8 1TD
Last updated: 29 Jul 2025 23:24 UTC
3 Components Battery Storage (Duration 1h) Storage (Duration 1.5h) CAPBAL (FORFAR) LIMITED
Total Capacity: 2.81 MW
Components: 3
Technologies:
Battery, Storage (Duration 1h), Storage (Duration 1.5h)
Unique CMUs: 2

Secondary Trading Contacts

Contact Information

Component Descriptions

This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).

Used by 1 CMU

This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).

Used by 1 CMU

CMU Identifiers

2 CMUs at this location (showing first 2):

FORF24 FORF25

Components at this Location

Click on yellow auction year badges to see individual component pages

This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
CMU: FORF24
Storage (Duration 1h) CAPBAL (FORFAR) LIMITED Parent: UNIBAL ENERGY LIMITED
Capacity Information:
De-Rated Capacity (Registry) 1.705
Connection/DSR Capacity 9.999
Anticipated Capacity 1.705
This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
CMU: FORF25
Storage (Duration 1.5h) CAPBAL (FORFAR) LIMITED Parent: UNIBAL ENERGY LIMITED
Capacity Information:
De-Rated Capacity (Registry) 2.033
Connection/DSR Capacity 9.999
Anticipated Capacity 2.033