Field At Grid Reference 504139 456454, Back Lane, Skerne, East Riding Of Yorkshire, YO25 8NQ (Address in planning application) Land Adjacent Driffield Supply Point, Wansford Road, Driffield (Address of grid connection)
2 Components Storage (Duration 1h) Storage (Duration 2h) DRIFFIELD SOLAR AND STORAGE LIMITED
Total Capacity: 6.32 MW
Components: 2
Technologies:
Storage (Duration 1h), Storage (Duration 2h)
Unique CMUs: 2

Secondary Trading Contacts

Contact Information

Component Descriptions

CMU is a 28MW/56MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV system and shares a grid connection. The solar PV and the BESS will be separately metered and registered as separate BMUs. The BESS will connect to the grid via the 20/66 kV substation of the Facility, connecting to additional panels on the 20kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 28 containers with Lithium Ion battery modules (LFP), containers further including HVAC, fire extinguishing system and controls; 7 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/20kV step up transformer and a 630A 20 kV Ring Main Unit (RMU);

Used by 1 CMU

CMU is a 32MW 32MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV system and shares a grid connection. The solar PV and the BESS will be separately metered, and registered as separate BMUs. The BESS will connect to the grid via the 20/66 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 16 containers with Lithium Ion battery modules (LFP), containers further including HVAC, fire extinguishing system and controls; 8 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU);

Used by 1 CMU

CMU Identifiers

Components at this Location

CMU is a 28MW/56MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV system and shares a grid connection. The solar PV and the BESS will be separately metered and registered as separate BMUs. The BESS will connect to the grid via the 20/66 kV substation of the Facility, connecting to additional panels on the 20kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 28 containers with Lithium Ion battery modules (LFP), containers further including HVAC, fire extinguishing system and controls; 7 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/20kV step up transformer and a 630A 20 kV Ring Main Unit (RMU);
CMU: DFD002
Capacity Information:
De-Rated Capacity (Registry) 2.863
Connection/DSR Capacity 18.6
Anticipated Capacity 2.97
CMU is a 32MW 32MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV system and shares a grid connection. The solar PV and the BESS will be separately metered, and registered as separate BMUs. The BESS will connect to the grid via the 20/66 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 16 containers with Lithium Ion battery modules (LFP), containers further including HVAC, fire extinguishing system and controls; 8 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU);
CMU: DFD001
Capacity Information:
De-Rated Capacity (Registry) 3.46
Connection/DSR Capacity 29.3