1 Component Coal/biomass ROOKERY SOUTH LIMITED
Total Capacity: N/A
Components: 1
Technologies:
Coal/biomass
Unique CMUs: 1

Secondary Trading Contacts

Contact Information

Component Descriptions

Energy from Waste facility located in Bedfordshire. The Facility will utilise conventional mass-burn technology, which is the most well proven Energy from Waste technology currently available. The process will consist of delivery of waste to the Facility by truck, where it will be deposited in a storage bunker, from which it will be fed into one of three thermal units (or ?streams?). Each of the three streams will consist of a moving grate, boiler and air pollution control equipment. The steam generated by this process will drive a turbine generator producing electricity that will be delivered to the local electricity distribution system via a new underground connection to the Marston Primary Substation. The electricity produced will be sufficient to meet the needs of approximately 65,000 homes

Used by 1 CMU

CMU Identifiers

1 CMU at this location (showing first 1):

ROOK01

Components at this Location

Click on yellow auction year badges to see individual component pages

Energy from Waste facility located in Bedfordshire. The Facility will utilise conventional mass-burn technology, which is the most well proven Energy from Waste technology currently available. The process will consist of delivery of waste to the Facility by truck, where it will be deposited in a storage bunker, from which it will be fed into one of three thermal units (or ?streams?). Each of the three streams will consist of a moving grate, boiler and air pollution control equipment. The steam generated by this process will drive a turbine generator producing electricity that will be delivered to the local electricity distribution system via a new underground connection to the Marston Primary Substation. The electricity produced will be sufficient to meet the needs of approximately 65,000 homes
CMU: ROOK01
Coal/biomass ROOKERY SOUTH LIMITED Parent: COVANTA ENERGY LIMITED
Capacity Information:
De-Rated Capacity (Registry) 56.927
Connection/DSR Capacity 65
Anticipated Capacity 56.927