Search Map View Statistics Support Us Help Login Register
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ
10 Components Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) DEVCO 2017 LIMITED
Total Capacity: 20.46 MW
Components: 10
Technologies:
Storage, Storage (Duration 1h), Storage (Duration 2h), Storage (Duration 1.5h)
Unique CMUs: 5

Secondary Trading Contacts

Component Descriptions

A New Build battery energy storage system.

Used by 2 CMUs

An existing battery energy storage system.

Used by 1 CMU

The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy storage system, consisting of power conversion units(inverters), battery cells, transformer, cabling and other equipment as necessary for the operation of an energy storage system. It will be connected to the distribution network.

Used by 2 CMUs

Components at this Location

A New Build battery energy storage system.
CMU: SKEL23
Storage (Duration 1.5h) SKELMERSDALE ENERGY STORAGE LIMITED Parent: Amber Energy Storage Three Crown Limited
Capacity Information:
De-Rated Capacity (Registry) 8.867
Connection/DSR Capacity 49.9
Anticipated Capacity 8.867
CMU: SKEL24
Storage (Duration 1.5h) SKELMERSDALE ENERGY STORAGE LIMITED Parent: Amber Energy Storage Three Crown Limited
Capacity Information:
De-Rated Capacity (Registry) 8.508
Connection/DSR Capacity 49.9
Anticipated Capacity 8.508
An existing battery energy storage system.
CMU: SKEL25
Storage (Duration 2h) SKELMERSDALE ENERGY STORAGE LIMITED Parent: Amber Energy Storage Three Crown Limited
Capacity Information:
De-Rated Capacity (Registry) 11.593
Connection/DSR Capacity 42.701
Anticipated Capacity 11.4
The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy storage system, consisting of power conversion units(inverters), battery cells, transformer, cabling and other equipment as necessary for the operation of an energy storage system. It will be connected to the distribution network.
CMU: AMB017
Storage (Duration 2h) DEVCO 2017 LIMITED Parent: Amber Energy Storage Limited
Capacity Information:
De-Rated Capacity (Registry) 8.927
Connection/DSR Capacity 49.9
Anticipated Capacity 47.959
CMU: AMB020
Storage (Duration 2h) DEVCO 2017 LIMITED Parent: Amber Energy Storage Limited
Capacity Information:
De-Rated Capacity (Registry) 24.261
Connection/DSR Capacity 49.9
Anticipated Capacity 24.261