Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland

14.81 MW
Total Capacity
8
Components
Rejected
Prequalification
* Latest auction year on record
Descriptions:
β€’ A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
β€’ A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
Auction Status:
Active 2024-25
Secondary Trading Contacts
CLEAN BATTERY POWER UK 1 LIMITED:
VATTENFALL WIND POWER LTD:

CMU Registry Data

CMU URB-04
4.534 VATTENFALL WIND POWER …
2024-25
CMU URB-02
9.724 VATTENFALL WIND POWER …
2024-25
CMU URB-03
7.404 VATTENFALL WIND POWER …
2023-24
CMU CMU-02
1.047 CLEAN BATTERY POWER …
2023-24
CMU URB-01
1.012 VATTENFALL WIND POWER …
2023-24 2021-2023