Bosworth Solar Farm, Hall Farm, Newbold Verdon, Leicestershire LE9 9NL - The component is a 5.4 MWp solar PV site with a 10.527 MVA export connection. This export connection is shared with an adjacent 5 MWp solar PV site which claims the FIT subsidy. This adjacent 5 MWp solar PV site is intended to be a non-CMU site. The two solar farms, while sharing a grid connection have separate MPANs and therefore separately metered. While the connection is oversized for the CMU, as it is shared, the limiting factor is the MWp of the CMU as the export connection is greater than the sum of the two sites' MWp. Hence the connection capacity submitted is 5.400 MWp.

Component ID: NESF05
Last updated: 30 Jul 2025 10:10 UTC
CMU ID:
Primary Fuel:
Solar
Description:
The component is a 5.4 MWp solar PV site with a 10.527 MVA export connection. This export connection is shared with an adjacent 5 MWp solar PV site which claims the FIT subsidy. This adjacent 5 MWp solar PV site is intended to be a non-CMU site. The two solar farms, while sharing a grid connection have separate MPANs and therefore separately metered. While the connection is oversized for the CMU, as it is shared, the limiting factor is the MWp of the CMU as the export connection is greater than the sum of the two sites' MWp. Hence the connection capacity submitted is 5.400 MWp.
Auction:
2028-29 (T-4) Four Year Ahead Capacity Auction

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) 0.31 MW
  • De-Rated Capacity (CMU Registry) 0.31
  • Connection Capacity (CMU Registry) 4.97 MW
  • Anticipated Capacity (CMU Registry) 0.30 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name NEXTPOWER BOSWORTH LIMITED
  • Parent Company (CMU Registry) NextEnergy Solar Holdings III Limited
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +4402039292200

Field Value
_id 530512
Type T-4
rank 0.0573088
CMU ID NESF05
Auction Name 2028-29 (T-4) Four Year Ahead Capacity Auction
Component ID Bosworth
Delivery Year 2028
De-Rated Capacity 0.31
OS Grid Reference SK 435 030
Location and Post Code Bosworth Solar Farm, Hall Farm, Newbold Verdon, Leicestershire LE9 9NL
Connection / DSR Capacity 4.966
Primary Fuel of Component Solar
Generating Technology Class Solar Photovoltaic
Description of CMU Components The component is a 5.4 MWp solar PV site with a 10.527 MVA export connection. This export connection is shared with an adjacent 5 MWp solar PV site which claims the FIT subsidy. This adjacent 5 MWp solar PV site is intended to be a non-CMU site. The two solar farms, while sharing a grid connection have separate MPANs and therefore separately metered. While the connection is oversized for the CMU, as it is shared, the limiting factor is the MWp of the CMU as the export connection is greater than the sum of the two sites' MWp. Hence the connection capacity submitted is 5.400 MWp.
Permitted on-Site Generating Unit (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Post-Refurbishing De-Rated Capacity (empty)
Generating Capacity of on-site Generating Unit (empty)

Field Value
_id 15783
Type T-4
CMU ID NESF05
Auction Capacity Auction
Agent Name (empty)
Beta Value (empty)
Auction Name 2028-29 (T-4) Four Year Ahead Capacity Auction
CM Unit Name Bosworth
CM Unit Type Non CMRS
TEC Deferral (empty)
Unproven DSR (empty)
Delivery Year 2028
Opt Out Status Opt-In
Opt-Out Reason (empty)
Parent Company NextEnergy Solar Holdings III Limited
DSR Test Method (empty)
Is FCM required (empty)
CM Unit Category Existing Generating CMU
Storage Facility No
De-Rated Capacity 0.31
Name of Applicant NEXTPOWER BOSWORTH LIMITED
Primary Fuel Type Solar
Registered Holder NEXTPOWER BOSWORTH LIMITED
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity (empty)
DSR Bidding Capacity (empty)
Amount of Credit Cover (empty)
Termination Fee 1 Rate Β£5000.00 /MW
Termination Fee 2 Rate Β£25000.00 /MW
Termination Fee 3 Rate Β£10000.00 /MW
Termination Fee 4 Rate Β£15000.00 /MW
Termination Fee 5 Rate Β£35000.00 /MW
Connection / DSR Capacity 4.966
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary (empty)
Pre-Refurbishing CMU Status (empty)
Transmission / Distribution Distribution
Unique Agreement Identifier CAN-2028-NESF05-001
New Build Yet to Satisfy FCM (empty)
Planning Consents Conditions (empty)
Anticipated De-Rated Capacity 0.3
Term of the Capacity Agreement 1
Nature of the Security Interest (empty)
CMU confirmed entry into Auction Yes
Is Connection Agreement required (empty)
Pre-Refurbishment Bidding Status (empty)
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Date of Issue of Capacity Agreement 2025-04-04
List of Traded Capacity Obligations (empty)
Post-Refurbishing De-Rated Capacity (empty)
Auction Acquired Capacity Obligation 0.31
Date of Issue of DSR Test Certificate (empty)
Has Capacity Agreement been Suspended (empty)
Period for which the transfer applies (empty)
Secondary Trading Contact - Telephone '+4402039292200
Capacity Agreement has been Terminated (empty)
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone (empty)
Delivery Years for which Agreement Valid 2028/2029
Connection Agreement Deferral Declaration (empty)
Date of Termination of Capacity Agreement (empty)
Latest Date SCM is expected to be achieved (empty)
Subject to Substantial Completion Milestone (empty)
Subject to a Minimum Completion Requirement (empty)
Earliest Date SCM is expected to be achieved (empty)
Is copy of Grid Connection Agreement required (empty)
Anticipated Pre-Refurbishing De-Rated Capacity (empty)
Anticipated Post-Refurbishing De-Rated Capacity (empty)
Legal Name of any Person with a Security Interest (empty)
Date for provision of deferred Connection Agreement (empty)
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement (empty)