Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Search / All Locations / All Postcodes / S17 / Unassigned 528382

S17

No capacity
Total Capacity
S17
Postcode
1058
Components
Active*
2028-29
Prequalified
Prequalification (2025)
Proven DSR CMU Unproven DSR CMU
* Latest auction year on record
Companies: Multiple companies Active 2025
OCTOPUS ENERGY LIMITED Active 2025 546 components
AXLE ENERGY LIMITED Active 2025 298 components
OHME OPERATIONS UK LIMITED Active 2025 134 components
ATTUNE POWER LTD Active 2025 9 components
LEVELISE LIMITED Active 2025 6 components
POD POINT LIMITED Historical 0 65 components
DSR
Descriptions:
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control …
β€’ Domestic demand turn down
β€’ Domestic EV charge point
β€’ Domestic EV

CMU Registry Data

CMU AXP600
9.33 AXLE ENERGY LIMITED
Proven DSR CMU 2025-26
CMU OCTE43
20 OCTOPUS ENERGY LIMITED
Unproven DSR CMU 2025-26
CMU Ohme-3
30.541 OHME OPERATIONS UK …
Proven DSR CMU 2025-26
CMU AXLE05
34.701 AXLE ENERGY LIMITED
Proven DSR CMU 2025-26
CMU OCTE31
39.935 OCTOPUS ENERGY LIMITED
Unproven DSR CMU 2025-26
CMU Ohme-4
29.713 OHME OPERATIONS UK …
Proven DSR CMU 2025-26
CMU AXP102
7.581 AXLE ENERGY LIMITED
Proven DSR CMU 2025-26
CMU LEVC01
8.231 LEVELISE LIMITED
Unproven DSR CMU 2025-26
CMU attu-1
4.792 ATTUNE POWER LTD
Unproven DSR CMU 2025-26
CMU AXP203
3.26 AXLE ENERGY LIMITED
Proven DSR CMU 2025-26
CMU AXP300
8.206 AXLE ENERGY LIMITED
Proven DSR CMU 2025-26
CMU OCTO24
39.51 OCTOPUS ENERGY LIMITED
Unproven DSR CMU 2024-25
CMU OCTO26
39.51 OCTOPUS ENERGY LIMITED
Unproven DSR CMU 2024-25